Click here to close now.

SYS-CON MEDIA Authors: Liz McMillan, Pat Romanski, Carmen Gonzalez, Blue Box Blog, Lori MacVittie

News Feed Item

Columbus Gold Drills 53 Metres of 4.37 gpt Gold at Paul Isnard, French Guiana; Completes Phase I Drill Program

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/22/12 -- Columbus Gold Corporation (TSX VENTURE:CGT) ("Columbus Gold") is pleased to announce completion of its Phase I drill program and results of an additional thirty one diamond core holes, MO 12-74 to 98 and 100 to 105 totaling 10,873.65 metres, at its Paul Isnard gold project in French Guiana. The holes were laid-out to confirm and expand, internally, along strike and at depth, the Montagne d'Or gold deposit within which earlier widely spaced holes had outlined a 43-101 compliant inferred resource of 1.9 million ounces gold within 36 million tonnes grading 1.6 gpt gold.

Except for two short holes drilled south into the hangwall of the known mineralization all holes from the current program contain significant gold intercepts, generally consistent with earlier results, within the principal Upper Felsic (UFZ) and Lower Favorable (LFZ) mineral zones defined by the original work. Of particular note are DH MO 12-92 with 53 metres grading 4.37 gpt gold (3.86 gpt cut to 31.1 gpt) within 113 metres averaging 2.43 gpt gold (2.17 cut) in UFZ and DH MO 12-78 with 29 metres grading 2.51 gpt gold in LFZ.

The completed Phase I drill program at Paul Isnard consisted of 45 core holes totaling 15,824 metres. Results are pending for the final hole of the program which is a step-out located 150 metres west of the existing drill pattern and resource area. Columbus Gold is reviewing and interpreting full drill results in preparation for implementation of a planned Phase II program, for a further +/-15,000 metres, designed to further expand the Montagne d'Or gold deposit and convert inferred resources to an indicated category.

A summary of the principal mineralized intervals from the 45 hole Phase I program can be viewed at the following link:

www.columbusgoldcorp.com/i/nr/2012-11-22-table.pdf

The Montagne d'Or gold deposit at Paul Isnard is an east-west striking, south dipping, tabular body made up of two sub-parallel zones of gold mineralization, designated Upper Felsic Zone (UFZ) and Lower Favorable Zone (LFZ), hosted by laminated felsic volcanics within a Pre-Cambrian greenstone sequence. Prior to Columbus Gold's involvement the deposit was partially outlined by 54 holes, totaling 10,600 metres, in the late 1990's. Based upon that past drilling, the deposit contains a 43-101 inferred gold resource of 1.9 million ounces within 36 million tonnes grading 1.6 gpt gold (0.4 gpt cut-off) within a mineralized zone about 2,000 metres long, averaging about 70 metres thick and tested to variable depths of between 100-150 metres.

The deposit is open at depth, internally between widely spaced holes and, in part, along strike. Future drill programs will target potential extensions of the deposit indicated by untested geochemical anomalies extending more than three kilometres along strike incompletely tested parallel zones of gold mineralization, and other untested or incompletely tested gold prospects and geochemical anomalies throughout the large Paul Isnard property.

Columbus Gold's independent consultant and Qualified Person, John Prochnau (P. Geo), B.Sc. (Mining Engineering), M.Sc. (Geology), has reviewed and approved the technical content of this news release.

About Columbus Gold

Columbus Gold is a gold exploration and development company operating in French Guiana and Nevada. In French Guiana, Columbus Gold controls a 100% interest in the Paul Isnard gold project, which hosts a 43-101 compliant 1.9 million ounce inferred gold resource with substantial expansion potential. In Nevada, Columbus is a prolific project generator focused on advancing projects either through earn-in agreements to industry partners or on its own where exploration risk is minimized and potential is particularly promising. Columbus Gold's President, Andy Wallace has a long and successful history of gold discovery and mine development. Columbus currently has 11 of its 24 strategically located gold projects in Nevada farmed-out to various mining companies.

ON BEHALF OF THE BOARD,

Robert F. Giustra, Chairman & CEO

Forward-Looking Statements

This release contains forward-looking information and statements, as defined by law including without limitation Canadian securities laws and the "safe harbor" provisions of the US Private Securities Litigation Reform Act of 1995 ("forward-looking statements"), respecting drilling, and Columbus Gold's general exploration plans. Forward-looking statements involve risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by the forward-looking statements, including without limitation, the ability to acquire necessary permits and other authorizations; environmental compliance; cost increases; availability of qualified workers and drill equipment; competition for mining properties; risks associated with exploration projects, mineral reserve and resource estimates (including the risk of assumption and methodology errors); dependence on third parties for services; non-performance by contractual counterparties; title risks; and general business and economic conditions. Forward-looking statements are based on a number of assumptions that may prove to be incorrect, including without limitation assumptions about: the design of the drill plan; general business and economic conditions; the timing and receipt of required approvals; availability of financing; power prices; ability to procure equipment and supplies including without limitation drill rigs; and ongoing relations with employees, partners and joint venturers. The foregoing list is not exhaustive and Columbus Gold undertakes no obligation to update any of the foregoing except as required by law.

Quality Assurance/Quality Control

The technical information herein has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 by John Prochnau, an independent consultant of Columbus Gold and the Qualified Person for the Paul Isnard project (the "QP"). For additional information regarding the Paul Isnard project, please see the Technical Report on Columbus Gold's website at www.columbusgoldcorp.com. (The NI 43-101-compliant technical report on the Paul Isnard Project entitled "Updated NI 43-101 Technical Report, Paul Isnard Project, French Guiana" dated effective February 1, 2012 and updated February 21, 2012, prepared by Bart A. Stryhas C.P.G. Ph.D. of SRK Consulting (U.S.), Inc., who is independent of Columbus Gold.)

Mr. Prochnau is responsible for quality control at the Paul Isnard project and has verified the data being disclosed herein, including sampling, analytical and test data underlying the information or opinions contained in the written disclosure, in consultation with Andre Adam, a Columbus Gold geologist and the Country Manager in French Guiana. The QP personally verifies the results of the quality assurance and quality control samples. The data presented herein was verified as follows: drill assay data and the average intercepts of gold mineralization were inspected, plotted on geological log sheets, averaged manually and checked electronically to produce the drill result released. The drill hole was also plotted on the relevant cross section with existing drill holes, to confirm and validate the interpreted mineralized zones, for purposes of correlation, in the released information. All blank samples and standards were verified against existing standards, and then the blank samples and standards of the lab were verified. Each sample is one meter long, and all standards were found to be within acceptable limits. Gold values were compared with the logging of the rocks by an experienced professional geologist and to the presence of visible alteration and mineralization and percentage of sulfide in this type of mineralization (disseminated to semi-massive sulfides and occasionally massive sulfide, also visible gold), and a strong correlation between amount of sulfides and amount of gold was found. Columbus Gold uses the laboratory of FILAB Suriname with respect to the analysis of its samples, and the processing, handling, documentation, archiving and reporting procedures are in accordance with common procedures in the mining industry. Mr. Adam and other Columbus Gold geologists or technicians are on site during drilling, examining individual drill holes and observing the procedures to maintain chain of custody of the samples and the method of processing. The drill hole was completed at Montagne d'Or, logged by professional and experienced geologists, and then sawn to measurements, taken from the drill hole whose collar location has been surveyed using hand-held GPS.

The location of drill holes will be verified by an independent topographic mapping and surveying company. The drill holes have also been surveyed from top to bottom using industry-standard, down-hole surveying techniques with equipment provided by the drill contractor. The drill core is sawn in half along the length after geological logging, and samples are bagged for analysis in one meter increments. The saprolite material, a minor portion of the drill holes, is put in textile bags by meter, the rock is put in plastic bags and sealed. 10 samples are then combined for shipping in larger bags. All of the samples are sent from the drill site in plastic boxes, covered and sent 5km to the camp every day, from the camp to Cayenne by road or by air, and then FILAB transports the samples every Thursday to Paramaribo, the location of the geochemical lab. Only a few of the one meter samples exceed 31.1 g/t Au and these are cut to 31.1 g/t and reported both cut and uncut. Drill work is done by Performax, a Canadian company, by qualified workers, and drill recovery is very good, averaging 82% in the saprolite (20-30 metres in each drill hole) and 98% in the rock. The presence of faults is very rare. The samples are tested at FILAB, which is an independent laboratory working for a number of mining companies and which has no other relationship with Columbus Gold. FILAB takes samples of approximately 2kg size, which are dried, crushed totally (to a size of less than 3mm), divided, or split to 300g, which is then pulverized to less than 100 microns. The samples are fire assayed with a finish by Flame AAS. 30 grams of rock powder is used for each analysis.

Cautionary Note to U.S. Investors

This news release includes certain estimates that comply with reporting standards in Canada, in particular with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), a rule developed by the Canadian Securities Administrators to establish standards for public disclosure concerning mineral projects. These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"), and resource information contained herein may not be comparable to similar information disclosed by United States companies. Certain documents disclosed Columbus Gold, including without limitation this news release, contain the term "inferred mineral resource" to comply with reporting standards in Canada. We advise United States investors that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. United States investors are cautioned: (i) that the aforementioned term has a great amount of uncertainty as to its existence and as to its economic and legal feasibility; and (ii) not to assume that all or any part of the inferred resource exists. United States investors are urged to closely review the additional warnings and disclosure contained under the heading "Cautionary Note to United States Investors" in our Final Short Form Prospectus dated May 11, 2012, a copy of which may be obtained from Columbus Gold or downloaded from Columbus Gold's profile at www.SEDAR.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Blue Box has been named “Bronze Sponsor” of SYS-CON's DevOps Summit New York, which will take place June 9-11, 2015, at the Javits Center in New York City, NY. Blue Box delivers Private Cloud as a Service (PCaaS) to a worldwide customer base. Built on a technology platform leveraging decades of operational expertise in cloud and distributed systems, Blue Box Cloud is a managed private cloud product available in both hosted and on-prem versions. Each Blue Box ...
Many of the well-known examples of DevOps success we read in blogs on the Internet paint an idyllic picture of DevOps productivity. A team was facing a stodgy, slow-moving operations department, teams weren’t delivering software on time. Those teams moved to DevOps, became proactive about infrastructure and deployment automation, and an overnight transition to productivity ensues. People are promoted, projects are successful, and developers and system administrators dance hand-in-hand in a final...
SYS-CON Events announced today that Secure Infrastructure & Services will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY, and the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Secure Infrastructure & Services (SIAS) is a managed services provider of cloud computing solutions for the IBM Power Systems market. The company...
Enterprise IoT is an exciting and chaotic space with a lot of potential to transform how the enterprise resources are managed. In his session at @ThingsExpo, Hari Srinivasan, Sr Product Manager at Cisco, will describe the challenges in enabling mass adoption of IoT, and share perspectives and insights on architectures/standards/protocols that are necessary to build a healthy ecosystem and lay the foundation to for a wide variety of exciting IoT use cases in the years to come.
SYS-CON Events announced today that CenturyLink, Inc., a leader in the network services market, has been named “Platinum Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. CenturyLink is the third largest telecommunications company in the United States and is recognized as a leader in the network services market by technology industry analyst firms. The company is a global leader in cloud infrastructure and ...
Docker is becoming very popular--we are seeing every major private and public cloud vendor racing to adopt it. It promises portability and interoperability, and is quickly becoming the currency of the Cloud. In his session at DevOps Summit, Bart Copeland, CEO of ActiveState, discussed why Docker is so important to the future of the cloud, but will also take a step back and show that Docker is actually only one piece of the puzzle. Copeland will outline the bigger picture of where Docker fits a...
SYS-CON Events announced today the DevOps Foundation Certification Course, being held June ?, 2015, in conjunction with DevOps Summit and 16th Cloud Expo at the Javits Center in New York City, NY. This sixteen (16) hour course provides an introduction to DevOps – the cultural and professional movement that stresses communication, collaboration, integration and automation in order to improve the flow of work between software developers and IT operations professionals. Improved workflows will res...
Containers and microservices have become topics of intense interest throughout the cloud developer and enterprise IT communities. Accordingly, attendees at the upcoming 16th Cloud Expo at the Javits Center in New York June 9-11 will find fresh new content in a new track called PaaS | Containers & Microservices Containers are not being considered for the first time by the cloud community, but a current era of re-consideration has pushed them to the top of the cloud agenda. With the launch ...
A new definition of Big Data & the practical applications of the defined components & associated technical architecture models This presentation introduces a new definition of Big Data, along with the practical applications of the defined components and associated technical architecture models. In his session at Big Data Expo, Tony Shan will start with looking into the concept of Big Data and tracing back the first definition by Doug Laney, and then he will dive deep into the description of 3V...
As cloud gives an opportunity to businesses to buy services externally – how is cloud impacting your customers? In his General Session at 15th Cloud Expo, Fabio Gori, Director of Worldwide Cloud Marketing at Cisco, provided answers to big questions: Do you see hybrid cloud as where the world is going? What benefits does it bring? And how does Cisco connect all of these clouds? He also discussed Intercloud and Cisco’s investment on it.
SYS-CON Events announced today that B2Cloud, a provider of enterprise resource planning software, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. B2cloud develops the software you need. They have the ideal tools to help you work with your clients. B2Cloud’s main solutions include AGIS – ERP, CLOHC, AGIS – Invoice, and IZUM
SYS-CON Events announced today that MangoApps will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY., and the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MangoApps provides private all-in-one social intranets allowing workers to securely collaborate from anywhere in the world and from any device. Social, mobile, and eas...
There is no doubt that Big Data is here and getting bigger every day. Building a Big Data infrastructure today is no easy task. There are an enormous number of choices for database engines and technologies. To make things even more challenging, requirements are getting more sophisticated, and the standard paradigm of supporting historical analytics queries is often just one facet of what is needed. As Big Data growth continues, organizations are demanding real-time access to data, allowing immed...
The world's leading Cloud event, Cloud Expo has launched Microservices Journal on the SYS-CON.com portal, featuring over 19,000 original articles, news stories, features, and blog entries. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. Microservices Journal offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. Follow new article posts on T...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.