Click here to close now.

SYS-CON MEDIA Authors: Yeshim Deniz, Pat Romanski, Carmen Gonzalez, Liz McMillan, Roger Strukhoff

News Feed Item

Sundance Minerals Drills 2.3 Meters @ 23.1g/t Gold and 4.5 Meters @ 100.4g/t Silver at San Ricardo Gold-Silver Project, Sonora, Mexico

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 12/07/12 -- Sundance Minerals Ltd. ("Sundance" or the "Company") is pleased to announce that it has completed the Phase 1 diamond drilling program at the San Ricardo property in Sonora, Mexico. Twelve holes were drilled along a 200 meter strike length of the Santa Cruz fault/vein target and two additional holes (SR12-12&13) were drilled on the Mina Antigua vein. Results are detailed in the following table.


---------------------------------------------------------------------------
                                                 TRUE                      
                FROM         TO                 WIDTH         Au         Ag
HOLE              (m)        (m)  INTERVAL         (m)      (g/t)      (g/t)
---------------------------------------------------------------------------
Santa Cruz and Intermedia Veins (gold)                                     
---------------------------------------------------------------------------
SR12-1            NA                                                       
---------------------------------------------------------------------------
SR12-2            NA                                                       
---------------------------------------------------------------------------
SR12-3            NA                                                       
---------------------------------------------------------------------------
SR12-4          31.8       34.4        2.6        2.3       23.1           
---------------------------------------------------------------------------
including       31.8       33.2        1.4        1.1       39.0           
---------------------------------------------------------------------------
SR12-5          30.4       33.0        2.6        2.5       3.67           
---------------------------------------------------------------------------
including       30.4       31.5        1.1        1.1       7.29           
---------------------------------------------------------------------------
SR12-6          30.6       31.7        1.1        1.1       13.4           
---------------------------------------------------------------------------
SR12-7            51         53        2.0        1.1       0.42           
---------------------------------------------------------------------------
and               59         64        5.0        2.9       0.42           
---------------------------------------------------------------------------
SR12-8            23         33       10.0        7.6       1.84           
---------------------------------------------------------------------------
including         26         29        3.0        2.3       3.77           
---------------------------------------------------------------------------
SR12-9            59         64        5.0        2.7       0.24           
---------------------------------------------------------------------------
and               68         69        1.0        0.6       1.55           
---------------------------------------------------------------------------
bottoms           71         72        1.0        0.6       0.48           
---------------------------------------------------------------------------
SR12-10           50         59        9.0        7.2       0.38           
---------------------------------------------------------------------------
SR12-11           27         30        3.0        2.7       1.73           
---------------------------------------------------------------------------
Including         28         29        1.0        0.9       4.02           
---------------------------------------------------------------------------
SR12-14           NA                          Re-drill of SR12-1           
---------------------------------------------------------------------------
Mina Antigua Vein (gold-silver)                                            
---------------------------------------------------------------------------
SR12-12           27         34        7.0        5.6       0.42       51.7
---------------------------------------------------------------------------
SR12-13           28         33        5.0        4.5       0.39      100.4
---------------------------------------------------------------------------
including         31         32        1.0        0.9       0.83      378.0
---------------------------------------------------------------------------
NA=No significant intervals

Dr. Chris Osterman, President and CEO of Sundance, stated, "That these encouraging drill results have corroborated our underground sampling and the primary silver grades in the Mina Antigua holes will add another dimension to the project."

THE PROPERTY:

The total Property area covers 38,100 hectares in northern Sonora State. The region hosts large Cu-Mo porphyry deposits, such as Cananea and Creston, and a number of mesothermal and epithermal gold-silver deposits, including the San Francisco (Timmins Gold), Mercedes (Yamana Gold) and Santa Elena (Silver Crest Mines). Excellent road access provides year-round exploration (http://www.sundanceminerals.com/s/San_Ricardo.asp).

SUNDANCE-PAGET MINERALS AGREEMENT:

Sundance has an agreement with Paget Minerals (Paget), wherein Paget has an exclusive right to earn an initial 51% interest by incurring US$500,000 in exploration expenditures by the first anniversary of the closing date and an additional US$5M by the fourth anniversary of the closing date. Paget also retains an exclusive right to earn an additional 9% by funding a pre-feasibility study in the three-year period following the 51% earn-in date.

Sundance will be the operator during the first 12 months employing its established technical and logistical support team in Mexico. The operator in the ensuing years will be determined by Paget.

Quality Control:

Geochemical samples are collected in accordance with accepted industry standards and best practices. Samples were submitted to Skyline Assayers and Laboratories, Tucson, Arizona, for fire assay. Gold and silver are analyzed by 30gm fire assay. As standard procedure, Sundance conducts routine quality-assurance and quality-control analysis on all assay results, including the systematic utilization of certified reference materials.

Qualified Person

Dr. Chris Osterman, Board Registered Professional Geologist, is the Company's Qualified Person as defined by National Instrument 43-101, and is responsible for the accuracy of the technical information in this news release.

About Sundance:

Sundance Minerals is an exploration company currently focusing on precious and base metal projects in Mexico and the United States. Our mission is to create and sustain shareholder value by developing a balanced portfolio of exploration targets in known districts. Sundance has a portfolio of 14 properties in Mexico and one in Nevada, most of which are available for joint venture. Technical information including geology, geochemistry, and geophysics is available for all of them. Five out of the 15 properties have historic drill holes. Leading properties are Miranda and San Ricardo gold projects in Sonora, Los Tamales (Cu) in Sonora, as well as Geranio and Lachatao gold projects in the Natividad mining district in Oaxaca, Mexico.

For further information on Sundance Minerals Ltd. please visit our website www.sundanceminerals.com.

Forward-Looking Statement:

Certain statements in this News Release constitute "forward-looking statements" that reflect the Company's current expectations and projections about its future results. Information concerning the interpretation of exploration results may also be considered forward-looking statements as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the continued participation of Paget in the San Ricardo project, the need to obtain additional financing to maintain its interest in and/or explore and develop the Company's other mineral projects; uncertainty of meeting anticipated program milestones for the Company's mineral projects; and other factors of the mineral exploration industry more fully described in the Company's Management Discussion & Analysis of Financial Position and Results of Operations, which is available on SEDAR at www.sedar.com. The assumptions made in developing the forward-looking statements include the following: the accuracy of interpretations of exploration results; the continued participation of Paget in the San Ricardo project, and the availability of equipment and qualified personnel to advance the San Ricardo project. Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo in Silicon Valley. Learn what is going on, contribute to the discussions, and ensure that your enterprise is as "IoT-Ready" as it can be! Internet of @ThingsExpo, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading in...
All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to the Internet by 2020. This number will continue to grow at a rapid pace for the next several decades. With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo, June 9-11, 2015, at the Javits Center in New York City. Learn what is going on, contribute to the discussions, and ensure that your enter...
SYS-CON Events announced today that EnterpriseDB (EDB), the leading worldwide provider of enterprise-class Postgres products and database compatibility solutions, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. EDB is the largest provider of Postgres software and services that provides enterprise-class performance and scalability and the open source freedom to divert budget from more costly traditiona...
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
An entirely new security model is needed for the Internet of Things, or is it? Can we save some old and tested controls for this new and different environment? In his session at @ThingsExpo, New York's at the Javits Center, Davi Ottenheimer, EMC Senior Director of Trust, reviewed hands-on lessons with IoT devices and reveal a new risk balance you might not expect. Davi Ottenheimer, EMC Senior Director of Trust, has more than nineteen years' experience managing global security operations and asse...
The Internet of Things is a misnomer. That implies that everything is on the Internet, and that simply should not be - especially for things that are blurring the line between medical devices that stimulate like a pacemaker and quantified self-sensors like a pedometer or pulse tracker. The mesh of things that we manage must be segmented into zones of trust for sensing data, transmitting data, receiving command and control administrative changes, and peer-to-peer mesh messaging. In his session a...
Organizations today are confounded by an avalanche of data that needs to be processed and managed on a daily basis. Through relevant use cases and a thought-provoking dialogue on an organization’s ‘Data to Decisions’ journey, Andrew Clyne, Chief Data Officer at CenturyLink Cognilytics, will reveal in his session at Big Data Expo how your organization can monetize data as a strategic asset. State-of-the-art Big Data and Advanced Analytics capabilities provided as a managed service can enable da...
There is no doubt that Big Data is here and getting bigger every day. Building a Big Data infrastructure today is no easy task. There are an enormous number of choices for database engines and technologies. To make things even more challenging, requirements are getting more sophisticated, and the standard paradigm of supporting historical analytics queries is often just one facet of what is needed. As Big Data growth continues, organizations are demanding real-time access to data, allowing immed...
SYS-CON Events announced today that the "First Containers & Microservices Conference" will take place June 9-11, 2015, at the Javits Center in New York City. The “Second Containers & Microservices Conference” will take place November 3-5, 2015, at Santa Clara Convention Center, Santa Clara, CA. Containers and microservices have become topics of intense interest throughout the cloud developer and enterprise IT communities.
There is no question that the cloud is where businesses want to host data. Until recently hypervisor virtualization was the most widely used method in cloud computing. Recently virtual containers have been gaining in popularity, and for good reason. In the debate between virtual machines and containers, the latter have been seen as the new kid on the block – and like other emerging technology have had some initial shortcomings. However, the container space has evolved drastically since coming on...
With worldwide spending on cloud services and infrastructure growing by 23% in 2015 to $118B, it is clear that cloud services are here to stay. Yet, the rate of cloud adoption varies by companies and markets around the world. With thousands of outages and hijacks across the Internet every day, one reason for hesitation is the faith in quality Internet performance. In his session at 16th Cloud Expo, Michael Kane, Senior Manager at Dyn, will explore how Internet performance affects your end-user...
Buzzword alert: Microservices and IoT at a DevOps conference? What could possibly go wrong? In this Power Panel at DevOps Summit, moderated by Jason Bloomberg, the leading expert on architecting agility for the enterprise and president of Intellyx, panelists will peel away the buzz and discuss the important architectural principles behind implementing IoT solutions for the enterprise. As remote IoT devices and sensors become increasingly intelligent, they become part of our distributed cloud en...
While great strides have been made relative to the video aspects of remote collaboration, audio technology has basically stagnated. Typically all audio is mixed to a single monaural stream and emanates from a single point, such as a speakerphone or a speaker associated with a video monitor. This leads to confusion and lack of understanding among participants especially regarding who is actually speaking. Spatial teleconferencing introduces the concept of acoustic spatial separation between confe...
We are all here because we are sold on the transformative promise of The Cloud. But what good is all of this ephemeral, on-demand infrastructure if your usage doesn't actually improve the agility and speed of your business? How must Operations adapt in order to avoid stifling your Cloud initiative? In his session at DevOps Summit, Damon Edwards, co-founder and managing partner of the DTO Solutions, will highlight the successful organizational, process, and tooling patterns of high-performing c...
Data-intensive companies that strive to gain insights from data using Big Data analytics tools can gain tremendous competitive advantage by deploying data-centric storage. Organizations generate large volumes of data, the vast majority of which is unstructured. As the volume and velocity of this unstructured data increases, the costs, risks and usability challenges associated with managing the unstructured data (regardless of file type, size or device) increases simultaneously, including end-to-...