Teranga Gold Corporation: ASX Fourth Quarter Report for the Three Months Ended December 31, 2013

TORONTO, ONTARIO -- (Marketwired) -- 01/28/14 -- Teranga Gold Corporation (TSX: TGZ) (ASX: TGZ) -

SABODALA GOLD OPERATION

KEY HIGHLIGHTS


--  Gold production for 2013 totalled 207,204 ounces, the higher end of our
    guidance of 190,000 to 210,000 ounces
--  Total cash costs(1) for 2013 were $641 per ounce, better than our
    guidance of $650 to $700 per ounce and all-in sustaining costs were
    $1,033 per ounce, at the lower end of our guidance of $1,000 to $1,100
    per ounce
--  Fourth quarter 2013 gold production and sales were 52,368 ounces and
    46,561 ounces, respectively
--  Fourth quarter 2013 total cash costs were $711 per ounce sold while all-
    in sustaining costs were $850 per ounce sold
--  Cash and bullion receivable increased to $42.3 million
--  Completes acquisition of remainder of interest in neighbouring property
    - Oromin Joint Venture Group Ltd. (OJVG) - by way of stream transaction
    with Franco-Nevada to fund the completion of the acquisition and the
    retiring of $30 million of $60 million bank debt facility
--  Gold production for 2014 is expected in the range of 220,000 to 240,000
    ounce(2) sat total cash costs of $650 to $700 per ounce and all-in
    sustaining costs of $800 to $875 per ounce
--  Proven and Probable open pit Reserves on a combined basis with OJVG
    increased by 120 percent to 2.8 million ounces, Measured and Indicated
    Resources increased by 123 percent to 6.2 million ounces, and Inferred
    Resources increased by 42 percent to 2.6 million ounces(3)

OPERATIONAL OVERVIEW

Sabodala Gold Operation

(All amounts are in US$ unless otherwise stated)


--  Gold production for the three months ended December 31, 2013 was on plan
    at 52,368 ounces of gold and 27 percent lower than the same prior year
    period. Lower production was due to lower processed grades, partly
    offset by higher mill throughput.

--  Gold production for the year was at the higher end of guidance of
    190,000 - 210,000 ounces, at 207,204 ounces, 3 percent lower than the
    same prior year period, mainly due to lower processed grades, partly
    offset by higher mill throughput.

--  During the three months ended December 31, 2013, 46,561 ounces were sold
    at an average realized gold price of $1,249 per ounce. During the same
    prior year period, 71,604 ounces were sold at an average realized gold
    price of $1,296 per ounce including 33,606 ounces delivered into gold
    hedge contracts at an average price of $833 per ounce and 37,998 ounces
    sold at an average spot price of $1,705 per ounce.

--  Total cash costs for the three months ended December 31, 2013 totalled
    $711 per ounce sold, 34 percent higher than the same prior year period.
    Higher total cash costs per ounce were due to an increase in material
    mined and milled during the quarter compared to the year earlier period.
    Total cash costs have been adjusted for the adoption of IFRIC 20 for
    capitalization of a portion of production phase stripping costs.

--  Total cash costs for the year were below guidance of $650 - $700 per
    ounce, at $641 per ounce, compared to $556 per ounce in the same prior
    year period. The increase in total cash costs was mainly due to an
    increase in material processed and higher royalty costs in 2013 compared
    to 2012.

--  All-in sustaining costs for the three months ended December 31, 2013
    were $850 per ounce sold compared to $1,004 per ounce sold in the same
    prior year period. The decrease compared to the prior year was primarily
    due to lower capital expenditures and administration expenses in the
    current year period, partly offset by higher total cash costs.

--  All-in sustaining costs for 2013 were at the low end of guidance, of
    $1,000 - $1,100 per ounce, at $1,033 per ounce, 14 percent lower than
    the same prior year period. Lower all- in sustaining costs were mainly
    due to lower capital expenditures, as result of the completion of the
    mill expansion in 2012, and a reduction in reserve development
    expenditures in 2013, partly offset by higher total cash costs and
    capitalized deferred stripping.

--  Total tonnes mined for the three months ended December 31, 2013 were 24
    percent higher compared to the same prior year period. The increase in
    total tonnes mined was mainly due to improved haul truck productivities
    as a result of shorter ore and waste haul distances. During the quarter,
    mining activities were focused on the upper benches of phase 3 of the
    Sabodala pit, while in the same prior year period mining took place in a
    high grade ore zone on lower benches of phase 2.

--  Unit mining costs for the fourth quarter of 2013 were $2.65 per tonne, a
    decrease of 15 percent compared to the same prior year period. The lower
    unit costs were primarily due to shorter ore and waste haul distances as
    noted above, partially offset by higher maintenance costs.

--  Ore tonnes milled for the three months ended December 31, 2013 were 19
    percent higher than the same prior year period due to improvements made
    to reduce the frequency and duration of unplanned downtime and an
    increase in throughput in the crushing circuit to match mill capacity.
    These improvements were primarily accomplished during two planned major
    shutdowns in January and May with a third taking place in October. As a
    result of the work completed, mill throughput achieved annualized design
    capacity of 3.5 million tonnes of primarily hard ore in the second half
    of 2013.

--  Processed grade for the three months ended December 31, 2013 was 38
    percent lower than the same prior year period, as planned. Mill feed
    during the fourth quarter 2013 was sourced from phase 3 of the Sabodala
    pit at grades closer to reserve grade. While in the year earlier period,
    mill feed was sourced from a high grade zone on the lower benches of
    phase 2 of the Sabodala pit.

--  Unit processing costs for the three month period ended December 31, 2013
    were 10 percent lower than the same prior year period at $17.96 per
    tonne, mainly due to an increase in throughput.


1   Total cash costs per ounce and all-in sustaining costs per ounce of gold
    sold are non-IFRS measures which do not have standard meanings under
    IFRS. Please refer to Non- IFRS Performance Measures at the end of this
    Report.
2   This production guidance is based on existing proven and probable
    reserves only from both the Sabodala mining licence and OJVG mining
    license as disclosed in Table 2 on page 6 of this Report. The estimated
    ore reserves underpinning this production guidance have been prepared by
    a competent person in accordance with the requirements of the 2012
    Australasian Code for Reporting of Exploration Results, Mineral
    Resources and Ore Reserves (the "JORC Code"). This production guidance
    also assumes an amendment to OJVG mining license to reflect processing
    of OJVG ore through the Sabodala mill.
3   See table 1 and 2 on page 6 of this Report for detailed breakdown of
    this resource and reserve estimates.

PRODUCTION STATISTICS

                                 Dec-13   Sep-13   Jun-13   Mar-13   Dec-12
                                Quarter  Quarter  Quarter  Quarter  Quarter
----------------------------------------------------------------------------
Ore mined              ('000t)    1,993      537      698    1,312    2,038
                               ---------------------------------------------
Waste mined -
 operating             ('000t)    6,655    3,321    2,683    2,513    4,362
                               ---------------------------------------------
Waste mined -
 capitalized           ('000t)      420    4,853    4,770    5,023      912
                               ---------------------------------------------
Total mined            ('000t)    9,068    8,711    8,151    8,848    7,312
                               ---------------------------------------------
Grade Mined              (g/t)     1.61     1.08     1.59     1.87     2.04
                               ---------------------------------------------
Ounces Mined              (oz)  103,340   18,721   35,728   78,929  133,549
                               ---------------------------------------------
Strip ratio         waste/ore       3.6     15.2     10.7      5.7      2.6
                               ---------------------------------------------
Ore processed          ('000t)      860      887      709      696      725
                               ---------------------------------------------
Head grade               (g/t)     2.11     1.41     2.36     3.31     3.40
                               ---------------------------------------------
Gold recovery               (%)      90%      92%      92%      92%      91%
                               ---------------------------------------------
Gold produced(1)          (oz)   52,368   36,874   49,661   68,301   71,804
                               ---------------------------------------------
Gold sold                 (oz)   46,561   37,665   54,513   69,667   71,604
                               ---------------------------------------------
Average price
 received                $/oz     1,249    1,339    1,379    1,090    1,296
                               ---------------------------------------------
Total cash costs per
 ounce sold(2,3,4)
 (including
 Royalties)              $/oz       711      748      642      535      532
                               ---------------------------------------------
All-in sustaining
 costs per ounce
 sold(2,4)
 (including
 Royalties)              $/oz       850    1,289    1,185      898    1,004
                               ---------------------------------------------
                         ($/t
Mining                  mined)     2.65     2.48     2.64     2.61     3.11
                               ---------------------------------------------
                         ($/t
Milling                milled)    17.96    17.56    23.77    22.47    19.88
                               ---------------------------------------------
                         ($/t
G&A                    milled)     4.84     4.60     6.25     6.17     6.35

(1) Gold produced includes change in gold in circuit inventory plus gold
    recovered during the period.

(2) Total cash costs per ounce and all-in sustaining costs per ounce are
    non-IFRS financial measures and do not have a standard meaning under
    IFRS. Please refer to non-IFRS Performance Measures at the end of this
    report.

(3) Total cash costs per ounce sold for 2012 were restated to comply with
    the Company's adoption of IFRIC 20 - Stripping Costs in the Production
    Phase of a Surface Mine, in line with the Company's accounting policies
    and industry standards.

(4) All-in sustaining costs per ounce sold include total cash costs per
    ounce, administration expenses (excluding Corporate depreciation expense
    and social community costs not related to current operations),
    capitalized deferred stripping, capitalized reserve development and mine
    site sustaining capital expenditures (including project development
    costs) as defined by the World Gold Council.

OUTLOOK 2014

The following table outlines Teranga's estimated 2014 summary production and
 cost guidance:


                                                      Year ended December 31
                                            --------------------------------
                                                   2013
                                                Actuals  2014 Guidance Range
----------------------------------------------------------------------------
Operating Results
 Ore mined                           ('000t)      4,540        5,300 - 6,000
 Waste mined - operating             ('000t)     15,172      18,200 - 19,000
 Waste mined - capitalized           ('000t)     15,066          500 - 1,000
                                            --------------------------------
 Total mined                         ('000t)     34,778      24,000 - 26,000
 Grade mined                           (g/t)       1.62          1.60 - 1.70
 Strip ratio                       waste/ore        6.7          3.25 - 3.50
 Ore milled                          ('000t)      3,152        3,400 - 3,600
 Head grade                            (g/t)       2.24          2.20 - 2.40
 Recovery rate                             %       91.4          90.0 - 91.0
 Gold produced(1)                       (oz)    207,204    220,000 - 240,000

 Total cash cost (incl.
  royalties)(2,3,4)                $/oz sold        641            650 - 700
 All-in sustaining costs(2,4)      $/oz sold      1,033            800 - 875

 Mining                          ($/t mined)       2.59          2.75 - 2.95
                                        ($/t
 Milling                             milled)      20.15        18.00 - 19.00
                                        ($/t
 G&A                                 milled)       5.38          4.75 - 5.25

 Gold sold to Franco-Nevada(1)          (oz)          -               22,500

Exploration and evaluation
 expense (Regional Land Package)($ millions)        5.4            4.0 - 6.0

Administration expenses and
 Social community costs         ($ millions)       13.6          15.0 - 16.0

Mine production costs           ($ millions)      170.8        155.0 - 165.0

Capital expenditures            ($ millions)
 Mine site sustaining                               9.9            7.0 - 8.0
 Capitalized reserve development
  (Mine License)                                    3.5            4.0 - 6.0
 Project development costs
  Government waiver payments                        3.5          12.0 - 14.0
  Development                                       0.5            3.0 - 5.0
  Mobile equipment and other                        8.3                    -
                                            --------------------------------
 Total project development costs                   12.4          15.0 - 19.0
 Capitalized deferred
  stripping(3)                                     43.3            2.0 - 3.0
                                            --------------------------------
Total capital expenditures                         69.1          28.0 - 33.0

(1) 22,500 ounces of production are to be sold to Franco Nevada at 20% of
    the spot gold price.

(2) Total cash costs per ounce and all-in sustaining costs per ounce are
    non-IFRS financial measures and do not have a standard meaning under
    IFRS. Please refer to non-IFRS Performance Measures at the end of this
    report.

(3) Total cash costs per ounce sold for 2012 were restated to comply with
    the Company's adoption of IFRIC 20 - Stripping Costs in the Production
    Phase of a Surface Mine, in line with the Company's accounting policies
    and industry standards.

(4) All-in sustaining costs per ounce sold include total cash costs per
    ounce, administration expenses (excluding Corporate depreciation expense
    and social community costs not related to current operations),
    capitalized deferred stripping, capitalized reserve development and mine
    site sustaining capital expenditures (including project development
    costs) as defined by the World Gold Council.

    Key assumptions: Gold spot price/ounce - US$1,250, Light fuel oil -
    US$1.15/litre, Heavy fuel oil - US$0.98/litre, US/Euro exchange rate -
    $1.325

The Company's 2014 operating budget has been designed to maximize free cash flow. Mining activity in 2014 is expected to focus on completing phase 3 of the Sabodala pit, as phase 4 of the Sabodala mine plan has been deferred to minimize material moved. Mining equipment freed up from the deferral of Sabodala phase 4 is anticipated to be used to begin mining activities at the Masato deposit in the fourth quarter of the year.

The higher processing rate in 2014 is a result of improvements made in the first half of 2013 to the crushing circuit and in line with throughput rates in the second half of 2013.

Total cash costs per ounce for 2014 are expected to be similar to 2013 while all-in sustaining costs per ounce are expected to be lower than 2013, mainly due to lower capital expenditures.

Exploration and evaluation expense in 2014 is expected to total approximately $5 million. The exploration program in 2014 will focus on the conversion of resources to reserves and extensions of existing deposits along strike on the two mine licenses, as well as, the continuation of a systematic regional exploration program designed to identify satellite and standalone deposits.

Administrative and Corporate Social Responsibility expenses are expected to total $15 - $16 million, similar to 2013. Lower administrative costs at the corporate office are expected to be offset by higher social commitments related to the acquisition of the OJVG and additional staffing in the Dakar office. The 2014 plan has been designed to provide the necessary support for operations and development and includes corporate office costs, Dakar office costs and corporate responsibility costs, but excludes corporate depreciation, transaction costs and other non-recurring costs.

Capitalized expenditures, including sustaining mine site expenditures, project development expenditures capitalized deferred stripping, reserve development expenditures and payments to the Government of Senegal are expected to total $28 - $33 million.

FINANCE

At December 31, 2013:

Cash and cash equivalents - $42.3 million (including $20.0 million in restricted cash and $7.3 million in bullion receivables)

Project finance facility (balance outstanding) - $60.0 million (reduced to $30.0 million as at the date of this report)

Mining fleet lease facility (balance outstanding) - $17.0 million

The stream transaction with Franco-Nevada to fund the acquisition of Bendon's stake in the OJVG and retire half of the project finance facility was completed on January 15, 2014. As a result, $30 million of the project finance facility was retired. The balance of $30 million is scheduled to be retired by the end of 2014. In addition, the restricted cash balance decreased to $15 million.

STRATEGY AND MINE PLAN

ACQUISITION OF THE OROMIN JOINT VENTURE GROUP ("OJVG")

On October 4, 2013, the Company completed the acquisition of all of the issued and outstanding common shares of Oromin Explorations Ltd. ("Oromin") that it did not already own (Oromin being one of the three joint venture partners holding 43.5% of the OJVG).

In total, the Company issued 71,183,091 Teranga shares to acquire all of the Oromin shares for net consideration of $37.8 million, including the fair value of Oromin stock options replaced by 7,911,600 Teranga stock options. As a result, Teranga's total number of issued and outstanding shares increased to 316,801,091.

On January 15, 2014, the Company completed the transaction announced on December 12, 2013 to acquire the balance of the OJVG that it did not already own. The Company acquired Bendon's 43.5% participating stake in the OJVG for $105.0 million financed through a stream transaction with Franco- Nevada. The stream agreement requires Teranga to deliver 22,500 ounces annually over the first six years followed by 6% of production thereafter. Franco-Nevada's purchase price per ounce is set at 20% of the spot price of gold.

The Company also acquired Badr's 13% carried interest for $7.5 million and further contingent consideration based on higher realized gold prices and increases to OJVG reserves through 2020.

The acquisition of Bendon and Badr's interests in the OJVG increases Teranga's ownership to 100% and consolidates the Sabodala region, increasing the size of Teranga's interests in mine license from 33km(2) to 241km(2) and more than doubling the Company's reserve base after taking into account the 1.45 million of probable open pit reserves of the OJVG identified in its NI 43-101 Technical Report.(4)

Acquisition related costs of approximately $11.0 million have been paid during the year ended December 31, 2013.

OROMIN TECHNICAL INTEGRATION

The acquisition of Oromin in August 2013 provided access to the OJVG technical data. Since then, management has been evaluating and integrating the geological and technical databases to develop updated resources and reserves to establish a combined life of mine (LOM) plan that will be supported by a NI 43-101 compliant technical report, targeted for March 2014.

The ongoing technical work for the OJVG integrated mine plan has included:


--  A comprehensive review of the Golouma, Masato and Kerekounda ore bodies
    including re-logging and re-assay of key drill intercepts, QA/QC checks
    and detailed interpretation to update these resource models;

--  Economic Lerchs-Grossman (LG) pit optimization and detailed pit designs
    to reflect the current gold price;

--  Preliminary Life of Mine (LOM) mine planning schedules for optimized
    cash flow analysis, detailed dilution analysis, pit designs, mine
    operating and capital estimates;

--  An updated tailings deposition and water balance model;

--  Ongoing analysis of the metallurgical test results for ore
    characterization studies of select areas within the Masato and Golouma
    ore bodies to increase understanding from Feasibility Study level and
    optimize feed and gold recovery to the Sabodala mill; and

--  Environmental and social impact reviews for a reduced footprint using
    the Sabodala operations.

In addition to development of an integrated LOM, the OJVG technical team was engaged with the Teranga technical teams both at site in Senegal and the corporate offices.


(4) See the OJVG Golouma Gold Project - Updated Feasibility Report, January
    31, 2013, available at http://www.sedar.com/.

MINE LICENSE (ML) RESERVE DEVELOPMENT

There were no drill programs conducted on the Sabodala ML during the fourth quarter. The drill program at Sabodala was completed in the first quarter of 2013. The 2014 drill program will be integrated into the combined Sabodala/OJVG reserve delineation program.

GORA DEVELOPMENT

Gora, hosting 0.29 million ounces of proven and probable reserves (see Table 2) at 4.74g/t is planned to be operated as a satellite to the Sabodala mine requiring limited local infrastructure and development. Ore will be hauled to the Sabodala processing plant by a dedicated fleet of trucks and processed on a priority basis, displacing Sabodala feed as required.

A technical report and an environmental and social impact assessment (ESIA) have been provided to the Senegalese government, and the permit approval process is ongoing.

Management expects the permit process to be completed in 2014 and construction to be initiated in 2015 based on the new integrated mine plan with the OJVG.

REGIONAL EXPLORATION

Since the acquisition of Oromin, the exploration team has spent the majority of its time working on the detailed due diligence review and remodeling of the Golouma and Masato deposits on the OJVG property(5), this has continued through the fourth quarter. In addition, the team along with the OJVG technical team have conducted detailed reviews to evaluate potential for increasing the other OJVG resources. The conclusions have been integrated into the scope for the 2014 exploration program.

On the regional land package which is 1,055km(2), the exploration team focused on site mapping, trenching, interpretation and site investigation for several high potential targets for follow up drill programs in 2014. These targets have been included as part of the scope for the 2014 exploration program.

RESERVES AND RESOURCES

Mineral Resources at December 31, 2013 are presented in Table 1 below. Total open pit proven and probable mineral reserves at December 31, 2013 are set forth in Table 2 below. The reported Mineral Resources are inclusive of the Mineral Reserves.

The proven and probable mineral reserves were based on the Measured and Indicated resources that fall within the designed open pits. The basis for the resources and reserves is consistent with the Canadian Securities Administrators NI 43-101 regulations. The design for the open pit limits, related phasing and long term planning for the Sabodala open pit was carried out to maximize the economics under current market conditions by removing high cost (high strip) gold ounces in the Sabodala pit.

The Sabodala pit design is consistent with the reserves reported for the third quarter 2013 results which are based on a $1,000 pit shell for Phase 4. For all reserves reported, the cut off grades were established using an estimated gold price of $1,250 per ounce. Mining phases in the Sabodala pit have been determined similarly to the previous designs, where the mine sequencing is based on accessing the high grade Main Flat Extension (MFE) through successive phases to balance waste stripping and optimize cash flows.

Dilution and ore recovery estimates for the Sabodala reserves were based on a comparison of the resource model with actual production performance over a 24 month span using a 5 metre minimum mining width and 10 metre bench height.

The Niakafiri pit design remains unchanged from December 2012. The Gora pit design has been adjusted to reflect an LG pit shell at $1,200 per ounce and an updated dilution analysis.

The Masato, Golouma and Kerekounda pit designs have been based on a $1,250 per ounce pit shell. Geotechnical studies conducted previously by the OJVG were reviewed by independent consultants and were determined to be acceptable. Detailed dilution analyses were conducted on each of these deposits, ore cut-off grades were established using an estimated gold price of $1,250 per ounce.

As a result of the work we have conducted, overall reported open pit reserves for the OJVG deposits have increased by about 90,000 ounces as compared to the last technical report issued by the OJVG in January 2013. An increase in open pit reserves was identified at the Golouma's and Kerekounda deposits, which was partially offset by a decrease at Masato. Analyses of high grade zones within the Masato ore body continue to be evaluated. Due to the manner of the interpretation of structural controls defining these high grade zones, management has determined that further work and possible infill drilling is necessary to accurately define these trends within the mineralised envelopes. For purposes of this updated reserve estimate, the Company has applied a conservative interpretation method resulting in approximately 300,000 ounces of high grade mineralization being excluded from Masato reserves.

Management expects its LOM Plan detailing annual production rates and operating and capital costs to be released with the Company's year end results in February and remains on track to file a NI 43-101 technical report in March 2014.


(5) The OJVG interest in the Golouma mining license is held through its 90%
    equity ownership in Societe des Mines de Golouma S.A. (SOMIGOL), the
    holder of the Golouma license.

          Table 1 Mineral Resources Summary as at December 31, 2013
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                    Measured                Indicated
                            ------------------------------------------------
                               Tonnes   Grade     Au   Tonnes   Grade     Au
                            ------------------------------------------------
                            ------------------------------------------------
                                 (Mt)   (g/t)  (Moz)     (Mt)   (g/t)  (Moz)
Sabodala                        24.28    1.32   1.03    22.95    1.29   0.95
Gora                             0.49    5.27   0.08     1.84    4.93   0.29
Niakafiri                        0.30    1.74   0.02    10.50    1.10   0.37
ML Other
----------------------------------------------------------------------------
Subtotal ML                     25.07    1.40   1.13    35.29    1.42   1.61
----------------------------------------------------------------------------
Masato                                                  43.93    1.11   1.57
Golouma                                                 12.04    2.69   1.04
Kerekounda                                               2.20    3.77   0.27
Somigol Other                                           18.72    0.93   0.56
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Subtotal Somigol                 0.00    0.00   0.00    76.89    1.39   3.44
----------------------------------------------------------------------------
Total                           25.07    0.00   1.13   112.18    1.40   5.05
----------------------------------------------------------------------------


          Table 1 Mineral Resources Summary as at December 31, 2013
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                         Measured and Indicated
                            ------------------------------------------------
                                      Tonnes           Grade              Au
                            ------------------------------------------------
                            ------------------------------------------------
                                        (Mt)           (g/t)           (Moz)
Sabodala                               47.23            1.31            1.98
Gora                                    2.32            5.00            0.37
Niakafiri                              10.70            1.12            0.39
ML Other
----------------------------------------------------------------------------
Subtotal ML                            60.25            1.42            2.74
----------------------------------------------------------------------------
Masato                                 43.93            1.11            1.57
Golouma                                12.04            2.69            1.04
Kerekounda                              2.20            3.77            0.27
Somigol Other                          18.72            0.93            0.56
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Subtotal Somigol                       76.89            1.39            3.44
----------------------------------------------------------------------------
Total                                 137.14            1.40            6.18
----------------------------------------------------------------------------

                             Inferred Resources
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Area                                    Tonnes             Au             Au
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                          (Mt)            g/t            Moz
Sabodala                                 17.88           0.94           0.54
Gora                                      0.21           3.38           0.02
Niakafiri                                 7.20           0.88           0.21
ML Other                                 13.20           0.91           0.38
----------------------------------------------------------------------------
Subtotal ML                              38.49           0.93           1.15
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Masato                                   25.59           1.13           0.93
Golouma                                   2.46           2.01           0.16
Kerekounda                                0.34           4.21           0.05
Somigol Other                            12.87           0.84           0.35
----------------------------------------------------------------------------
Subtotal Somigol                         41.26           1.12           1.48
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Total                                    79.75           1.03           2.64
----------------------------------------------------------------------------

Notes for Resources Estimate:
1)  CIM definitions were followed for Mineral Resources.
2)  Mineral Resources for Sabodala include Sutuba.
3)  Mineral Resource cut-off grades for Sabodala, Masato, Golouma,
    Kerekounda and Somigol Other are 0.2 g/t Au for oxide and 0.35 g/t Au
    for fresh.
4)  Mineral Resource cut-off grades for Niakafiri are 0.3 g/t Au for oxide
    and 0.5 g/t Au for fresh.
5)  Mineral Resource cut-off grade for Gora is 0.5 g/t Au for oxide and
    fresh.
6)  Mineral Resource cut-off grade for Niakafiri West and Soukhoto is 0.3
    g/t Au for oxide and fresh.
7)  Mineral Resource cut-off grade for Diadiako and Majiva is 0.2 g/t Au for
    oxide and fresh.
8)  Measured Resources include stockpiles which total 8.60 Mt at 0.86 g/t Au
    for 0.24 Mozs.
9)  High grade assays were capped at grades ranging from 10 g/t to 30 g/t Au
    at Sabodala, 20 g/t to 70 g/t Au at Gora, from 2 g/t to 30 g/t Au at
    Masato, from 5 g/t to 70 g/t for Golouma, from 11 g/t to 50 g/t at
    Kerekounda, and from 0.8 g/t to 110 g/t at Somigol Other.
10) The figures above are "Total" Mineral Resources and include Mineral
    Reserves.
11) Sum of individual amounts may not equal due to rounding.

Table 2 Mineral Reserves Summary as at December 31, 2013
----------------------------------------------------------------------------
                     Proven              Probable       Proven and Probable
             ---------------------------------------------------------------
             ---------------------------------------------------------------
              Tonnes  Grade     Au Tonnes  Grade     Au Tonnes  Grade     Au
                (Mt)  (g/t)  (Moz)   (Mt)  (g/t)  (Moz)   (Mt)  (g/t)  (Moz)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Sabodala        3.45   1.64   0.18   5.53   1.58   0.28   8.98   1.60   0.46
Gora            0.50   4.58   0.07   1.39   4.80   0.21   1.89   4.74   0.29
Niakafiri       0.23   1.69   0.01   7.58   1.12   0.27   7.81   1.14   0.29
Stockpiles      8.60   0.86   0.24                        8.60   0.86   0.24
----------------------------------------------------------------------------
Subtotal ML    12.78   1.23   0.51  14.50   1.65   0.77  27.28   1.45   1.27
----------------------------------------------------------------------------
Masato                              25.24   1.21   0.98  25.24   1.21   0.98
Golouma                              6.47   2.24   0.46   6.47   2.24   0.46
Kerekounda                           0.88   3.26   0.09   0.88   3.26   0.09
----------------------------------------------------------------------------
Subtotal
 Somigol        0.00   0.00   0.00  32.59   1.47   1.54  32.59   1.47   1.54
----------------------------------------------------------------------------
Total          12.78   1.23   0.51  47.09   1.52   2.31  59.87   1.46   2.81
----------------------------------------------------------------------------

Notes for Reserves Estimate:
1.  CIM definitions were followed for Mineral Reserves.
2.  Mineral Reserve cut off grades for Sabodala are 0.40 g/t Au for oxide
    and 0.5 g/t Au for fresh based on a $1,250/oz gold price and
    metallurgical recoveries between 90% and 93%.
3.  Mineral Reserve cut off grades for Niakafiri are 0.35 g/t Au for oxide
    and 0.5 g/t Au for fresh based on a $1,350/oz gold price and
    metallurgical recoveries between 90% and 92%.
4.  Mineral Reserve cut off grade for Gora is 0.76 g/t Au for oxide and
    fresh based on $1,200/oz gold price and metallurgical recovery of 95%.
    Mineral Reserve cut off grade for Masato, Golouma, Kerekounda are 0.4
5.  g/t Au for oxide and 0.5 g/t for fresh based on $1,250/oz gold price and
    metallurgical between 90% and 93%.
6.  Sum of individual amounts may not equal due to rounding.
7.  The Niakafiri deposit is adjacent to the Sabodala village and relocation
    of at least some portion of the village will be required which will
    necessitate a negotiated resettlement program with the affected
    community members.
8.  The Gora deposit is intended to be merged into the Sabodala mining
    license which the State of Senegal has agreed to in principal subject to
    completion and receipt of an approved environmental and social impact
    assessment which is ongoing.
9.  The SOMIGOL deposits lie adjacent to the Sabodala mining license and it
    is intended that these licenses be merged which the State of Senegal has
    agreed to in principal under the terms of its previously announced
    global investment agreement in May of 2013. Any additional specific
    permits are anticipated to be minor given both licenses are already
    fully approved including environmental and social impact assessments.
10. There are no other known political, legal or environmental risks that
    could materially affect the potential development of the identified
    mineral resources or mineral reserves other than as already set out in
    the Company's Annual Information Form dated March 28, 2013 - see RISK
    FACTORS beginning on page 62.

NON-IFRS Financial Performance Measures

The Company has included non-IFRS measures in this Report: "total cash cost per ounce of gold sold" and "all-in sustaining costs per ounce". The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company. The non-IFRS measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers.

Teranga reports total cash costs on a sales basis. Total cash costs per gold ounce include production costs such as mining, processing, refining and site administration, net of silver sales, divided by gold ounces sold to arrive at total cash costs per gold ounce sold. Production costs are exclusive of depreciation and depletion. Other companies may calculate this measure differently.

All in sustaining costs per ounce sold include total cash costs per ounce, administration expenses (excluding corporate depreciation expense and social community costs not related to current operations), capitalized deferred stripping, capitalized reserve development and mine site sustaining capital expenditures (including project development costs) as defined by the World Gold Council. Other companies may calculate this measure differently.

Competent Persons Statement

The technical information contained in this document relating to the mineral reserve estimates for Sabodala, the stockpiles, Masato, Golouma and Kerekounda is based on information compiled by Mr. William Paul Chawrun, P.Eng who isa member of the Professional Engineers Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Mr. Chawrun is a full-time employee of Teranga and is a "qualified person" as defined in NI 43-101 and a "competent person" as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Chawrun has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Chawrun has consented to the inclusion in this Report of the matters based on his compiled information in the form and context in which it appears in this Report.

The technical information contained in this Report relating to mineral resource estimates is based on information compiled by Ms. Nakai-Lajoie. Ms. Patti Nakai-Lajoie, P. Geo., is a Member of the Association of Professional Geoscientists of Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Ms. Nakai-Lajoie has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Ms. Nakai-Lajoie is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this Report of the matters based on her compiled information in the form and context in which it appears in this Report.

The technical information contained in this document relating to the mineral reserve estimates for Gora and Niakafiri is based on, and fairly represents, information and supporting documentation prepared by Julia Martin, P.Eng. who is a member of the Professional Engineers of Ontario and a Member of AusIMM (CP). Ms. Martin is a full time employee with AMC Mining Consultants (Canada) Ltd., is independent of Teranga, is a "qualified person" as defined in NI 43-101 and a "competent person" as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Ms. Martin has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Ms. Martin is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Ms. Martin has reviewed and accepts responsibility for the Mineral Reserve estimates for Gora and Niakafiri disclosed in this document and has consented to the inclusion of the matters based on her information in the form and context in which it appears in this Report.

Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). CIM definitions of the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", are substantially similar to the JORC Code corresponding definitions of the terms "ore reserve", "proved ore reserve", "probable ore reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", respectively. Estimates of mineral resources and mineral reserves prepared in accordance with the JORC Code would not be materially different if prepared in accordance with the CIM definitions applicable under NI 43-101. There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted into mineral reserves.

CORPORATE DIRECTORY

Directors

Alan Hill, Executive Chairman

Richard Young, President and CEO

Christopher Lattanzi, Non-Executive Director

Edward Goldenberg, Non-Executive Director

Alan Thomas, Non-Executive Director

Frank Wheatley, Non-Executive Director

Senior Management

Alan Hill, Executive Chairman

Richard Young, President and CEO

Mark English, Vice President, Sabodala Operations

Paul Chawrun, Vice President, Technical Services

Navin Dyal, Vice President and CFO

David Savarie, Vice President, General Counsel & Corporate Secretary

Kathy Sipos, Vice President, Investor & Stakeholder Relations

Aziz Sy, Vice President, Development Senegal

Macoumba Diop, General Manager and Government Relations Manager, SGO

Registered Office

121 King Street West, Suite 2600

Toronto, Ontario, M5H 3T9, Canada

T: +1 416-594-0000

F: +1 416-594-0088

E: [email protected]

W: www.terangagold.com

Senegal Office

2K Plaza

Suite B4, 1er Etage

sis Route du Meridien President

Dakar Almadies

T: +221 338 693 181

F: +221 338 603 683

Auditor

Ernst & Young LLP

Share Registries

Canada: Computershare Trust Company of Canada

T: +1 800 564 6253

Australia: Computershare Investor Services Pty Ltd

T: 1 300 850 505

Stock Exchange Listings

Toronto Stock Exchange, TSX code: TGZ

Australian Securities Exchange, ASX code: TGZ

Issued Capital


As of December 31, 2013
Issued shares                                                    316,801,091
----------------------------------------------------------------------------
Stock options                                                     23,737,850
----------------------------------------------------------------------------

Stock Options - Exercise Profile
Exercise Price (C$)                                                  Options
----------------------------------------------------------------------------
$3.00                                                             15,826,250
----------------------------------------------------------------------------
$0.65 - $1.30                                                      7,911,600
----------------------------------------------------------------------------

Forward Looking Statements

This news release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Teranga, or developments in Teranga's business or in its industry, to differ materially from the anticipated results, performance, achievements or developments expressed or implied by such forward-looking statements. Forward-looking statements include, without limitation, all disclosure regarding possible events, conditions or results of operations, future economic conditions and courses of action, the proposed plans with respect to mine plan and consolidation of the Sabodala Gold Project and OJVG Golouma Gold Project, mineral reserve and mineral resource estimates, anticipated 2014 production of 220,000 to 240,000 ounces of gold at an estimated total cash cost of $650 to $700 and all-in sustaining costs of $800 -$875 per ounce of gold, targeted date for a NI 43-101 compliant technical report, amendment to the OJVG mining license, the approval of the Gora ESIA and permitting and the completion of construction related thereto. Such statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions and its expectations of future developments that management believe to be reasonable and relevant. These assumptions include, among other things, the ability to obtain any requisite Senegalese governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic conditions and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements, which speak only as of the date they are made. The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other factors, such as project execution delays, many of which are beyond the control of Teranga, as well as other risks and uncertainties which are more fully described in the Company's Annual Information Form dated March 27, 2013, and in other company filings with securities and regulatory authorities which are available at www.sedar.com. Teranga does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Nothing in this report should be construed as either an offer to sell or a solicitation to buy or sell Teranga securities.

About TERANGA

Teranga is a Canadian-based gold company listed on the Toronto Stock Exchange (TSX: TGZ) and Australian Securities Exchange (ASX: TGZ). Teranga is principally engaged in the production and sale of gold, as well as related activities such as exploration and mine development.

Teranga's mission is to create value for all of its stakeholders through responsible mining. Its vision is to explore, discover and develop gold mines in West Africa, in accordance with the highest international standards, and to be a catalyst for sustainable economic, environmental and community development. All of its actions from exploration, through development, operations and closure will be based on the best available techniques.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Media announced that Centrify, a provider of unified identity management across cloud, mobile and data center environments that delivers single sign-on (SSO) for users and a simplified identity infrastructure for IT, has launched an ad campaign on Cloud Computing Journal. The ads focus on security: how an organization can successfully control privilege for all of the organization’s identities to mitigate identity-related risk without slowing down the business, and how Centrify provides ...
The Internet of Things will greatly expand the opportunities for data collection and new business models driven off of that data. In her session at @ThingsExpo, Esmeralda Swartz, CMO of MetraTech, discussed how for this to be effective you not only need to have infrastructure and operational models capable of utilizing this new phenomenon, but increasingly service providers will need to convince a skeptical public to participate. Get ready to show them the money!
We are reaching the end of the beginning with WebRTC, and real systems using this technology have begun to appear. One challenge that faces every WebRTC deployment (in some form or another) is identity management. For example, if you have an existing service – possibly built on a variety of different PaaS/SaaS offerings – and you want to add real-time communications you are faced with a challenge relating to user management, authentication, authorization, and validation. Service providers will w...
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
In her General Session at 15th Cloud Expo, Anne Plese, Senior Consultant, Cloud Product Marketing, at Verizon Enterprise, focused on finding the right mix of renting vs. buying Oracle capacity to scale to meet business demands, and offer validated Oracle database TCO models for Oracle development and testing environments. Anne Plese is a marketing and technology enthusiast/realist with over 19+ years in high tech. At Verizon Enterprise, she focuses on driving growth for the Verizon Cloud platfo...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
Lori MacVittie is responsible for education and evangelism of application services available across F5's entire product suite. Her role includes authorship of technical materials and participation in a number of community-based forums and industry standards organizations, among other efforts. MacVittie has extensive programming experience as an application architect, as well as network and systems development and administration expertise. Prior to joining F5, MacVittie was an award-winning Senio...
15th Cloud Expo, which took place Nov. 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA, expanded the conference content of @ThingsExpo, Big Data Expo, and DevOps Summit to include two developer events. IBM held a Bluemix Developer Playground on November 5 and ElasticBox held a Hackathon on November 6. Both events took place on the expo floor. The Bluemix Developer Playground, for developers of all levels, highlighted the ease of use of Bluemix, its services and functionalit...
SYS-CON Media announced today that Skytap blog on "DevOps Journal" exceeded 84,000 story reads. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Noel Wurst is the managing content editor at Skytap. Skytap provides SaaS-based dev/test environments to the enterprise. Skytap solution removes the inefficiencies and constraints that comp...
SYS-CON Events announced today that Gridstore™, the leader in hyper-converged infrastructure purpose-built to optimize Microsoft workloads, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Gridstore™ is the leader in hyper-converged infrastructure purpose-built for Microsoft workloads and designed to accelerate applications in virtualized environments. Gridstore’s hyper-converged infrastructure is the ...
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to th...
"There is a natural synchronization between the business models, the IoT is there to support ,” explained Brendan O'Brien, Co-founder and Chief Architect of Aria Systems, in this SYS-CON.tv interview at the 15th International Cloud Expo®, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
How do APIs and IoT relate? The answer is not as simple as merely adding an API on top of a dumb device, but rather about understanding the architectural patterns for implementing an IoT fabric. There are typically two or three trends: Exposing the device to a management framework Exposing that management framework to a business centric logic Exposing that business layer and data to end users. This last trend is the IoT stack, which involves a new shift in the separation of what stuff happe...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.