Atacama Reports Cerro Maricunga M&I Oxide Resources Increase to 3.470 Million Ounces of Gold

TORONTO, ONTARIO -- (Marketwired) -- 01/29/14 -- Atacama Pacific Gold Corporation (TSX VENTURE: ATM) ("Atacama") is pleased to report the updated pit constrained oxide-associated resource estimate for its Cerro Maricunga gold deposit located in northern Chile, 117 kilometres northeast of Copiapo.

Undiluted measured and indicated ("M&I") resources increased by 1.01 million ounces to 3.470 million ounces of gold in 248.8 million tonnes grading 0.43 grams per tonne gold ("g/t Au") with a further 43,000 ounces of gold in 3.1 million tonnes grading 0.43 g/t Au in the inferred category. The gain in M&I resources is largely due to the conversion of inferred resources to the M&I category as a result of the 25,457-metre Phase IV infill drilling program completed in 2013.

The current resource estimate was confined within a Whittle pit shell modelled at a gold price of US$1,200 per ounce whereas the previous resource was modelled at a US$1,400 per ounce gold price. Table 1 summarizes the resource estimate by zone. A cut-off grade of 0.18 g/t Au was used to estimate the current resource.

"With the 1.01 million ounce increase in M&I gold resources, we surpassed our goal of converting 750,000 inferred ounces of gold from our previous estimate to the current M&I category and underlined the remarkable consistency of the oxide gold mineralization at Cerro Maricunga," said Carl Hansen, President and CEO of Atacama. "Over a period of three years, we have aggressively advanced Cerro Maricunga from a grassroots discovery to one of the largest undeveloped oxide gold deposits in the world with 3.470 million ounces of gold outlined to date. With the majority of the resources now in the M&I category, the updated estimate will form the foundation of a prefeasibility study, the next stage in the development of Cerro Maricunga, which is anticipated to be completed during the second quarter 2014."


Table 1 - Cerro Maricunga Oxide Resource(1) Estimate by Zone, January 2014

----------------------------------------------------------------------------
                                      Measured and
         Measured     Indicated        Indicated             Inferred
       ------------ ------------- -------------------- ---------------------
       Tonnes Grade Tonnes  Grade Tonnes Grade    Gold Tonnes  Grade    Gold
       (mill-  (g/t (mill-   (g/t (mill-  (g/t  Ounces (mill-   (g/t  Ounces
Zone    ions)   Au)  ions)    Au)  ions)   Au) (000's)  ions)    Au) (000's)
----------------------------------------------------------------------------
Lynx     16.9  0.48   43.1   0.46   60.0  0.46     893    1.7   0.48      27
----------------------------------------------------------------------------
Crux     36.1  0.47   59.9   0.44   96.0  0.45   1,398    0.9   0.35      10
----------------------------------------------------------------------------
Phoenix  54.4  0.40   37.4   0.40   91.7  0.40   1,171    0.3   0.52       5
----------------------------------------------------------------------------
Other     0.9  0.23    0.3   0.23    1.1  0.23       8    0.1   0.20       1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Totals
 (2)    108.2  0.43  140.6   0.43  248.8  0.43   3,470    3.1   0.43      43
----------------------------------------------------------------------------
1. Resource estimated at a 0.18 g/t Au cut-off grade.
2. Apparent summation errors are due to rounding

The previously reported pit constrained resource, used in the Cerro Maricunga preliminary economic assessment ("PEA") issued January 28, 2013, was estimated at 2.460 million ounces in the M&I category (185.8 million tonnes grading 0.41 g/t Au) with a further 0.938 million ounces in the inferred category (75.4 million tonnes grading 0.39 g/t Au).

The Cerro Maricunga resource is largely located within three gold zones, the Lynx, Phoenix and Crux zones (see Figure 1, attached), which outcrop on surface. A small portion of the M&I resource (8,000 ounces of gold in 1.1 million tonnes grading 0.23 g/t Au) lies outside the confines of the three zones but within the pit boundaries and is classified as Other In-Pit. While the strike extent of the three main zones has been defined by drilling, the full potential of the Cerro Maricunga volcanic complex has not been fully tested. The oxide-associated gold mineralization has been drilled to depths in excess of 600 metres and remains open to depth.

The Cerro Maricunga gold deposit is hosted in intrusive subvolcanic rocks and genetically related breccia emplaced along a main north-west striking structure. The mineralization consists mainly of free gold commonly associated with black/grey-banded quartz veinlets. Sulphides are scarce.

Resource Estimation Methodology

The Cerro Maricunga resource estimate is based upon 29,547 metres of diamond drilling (86 holes) and 75,496 metres of reverse circulation ("RC") drilling (234 holes) for a total of 105,043 metres of drilling along with five trenches totalling 266 metres. A total of 21,385 two-metre samples were used in the estimation: Lynx Zone - 4,102 samples; Phoenix Zone - 11,746 samples; and, Crux Zone - 5,537 samples. A total of 31,227 two-metre samples fell outside the mineralized zones and were used to estimate these areas. The previously designated Pollux Zone has been incorporated into the Phoenix zone.

The resource estimate has been constrained by a conceptual pit shell in order to confirm reasonable prospects of economic extraction as set out in the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards for Mineral Resources and Mineral Reserves and National Instrument 43-101 ("NI 43-101").

Three-dimensional solids were built for each zone using a 0.15 g/t Au grade shell and taking into account structure controls. The following zones were defined based on the structural pattern of the 2013 geological model: Crux + South Phoenix, North Phoenix and Lynx. Standard geostatistical analyses including basic statistics, histograms, scatterplots, declustering, contact profiles, and variography were carried out for each zone as well as areas falling outside the mineralized zones. Directional variography revealed that the aforementioned zones had a vertical anisotropy. Resources within and outside the 0.15 g/t Au grade envelopes were estimated via Ordinary Kriging in three passes.

Resources were classified according to the following criteria: blocks located within a 50 x 50 metre grid were placed in the measured category; blocks located within a 100 x 100 metre grid were categorized as indicated, while the remaining blocks within the mineralized envelope were classified as inferred.

A total of 527 10-centimetre core specimens were tested for specific gravity. The specific gravity for each block in the model was estimated via Ordinary Kriging.

Parameters used to establish the conceptual pit were: mining costs of US$1.40 per tonne mined, processing costs of US$2.53 per tonne, G&A of US$0.51 per tonne processed, gold recovery of 81%, an overall pit slope angle of 42 degrees, a gold price of US$1,200 per ounce and a 0.18 g/t raised cut-off grade. These parameters were similar to those used in the Cerro Maricunga PEA issued by Atacama in January 2013 with minor adjustments to costs due to changes in the estimated exchange rate.

The updated M&I and inferred mineral resource estimates reported herein are contained within a resource-limiting open-pit shell along a 2,500 metre trend, 800 metres wide and up to 460 metres deep.

Readers are cautioned that the conceptual pit shell for the resource model disclosed above does not constitute an economic analysis of mineral resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Quality Assurance / Quality Control Program

RC chips and diamond drill core from Atacama's drilling campaign were collected at the drilling site under the direct supervision of Atacama staff. The RC samples and drill core were appropriately tagged, secured and transported to the Atacama exploration camp and then to Atacama's secure sample, logging and storage facility in Copiapo, Chile. Each RC chip sample was split to obtain an approximate 15 kilogram sample for assay purposes. Representative chips were collected from each sample for logging purposes. Drill core was logged, marked at two metre intervals for sampling and split longitudinally with a diamond saw. One half of the core was bagged and sample tags attached. The second half of the core was returned to the core boxes. All samples were appropriately tagged and sent to Asesoria Minera Geoanalitica Ltda.'s sample preparation facility in Copiapo. Resulting pulps were then returned to Atacama's storage facility for insertion of quality assurance and quality control ("QA-QC") pulps and standards and thereafter re-numbered using bar codes. Final sample batches were then transported by Atacama personnel to Activation Laboratorios Ltda. in Coquimbo, Chile for assaying. Samples were analyzed for gold using 50 gram fire assay with atomic absorption spectrographic finish for a sensitivity of 5 ppb (.005 ppm) gold.

Sample QA-QC control measures for the Phase IV program included the insertion of duplicates, standards and blanks. Statistical analyses were performed for: 335 field duplicates for RC drilling; 134 coarse duplicates (10#) for diamond drilling; and 469 pulp duplicates for chemical laboratory analysis. Additionally, analyses were performed for 481 standards and 150 blank samples. Overall conclusions drawn from the QA-QC programme are as follows:


--  Analyses of duplicates show good precision, indicating that the
    protocols used for sample preparation and assaying were adequate.
--  Analyses of standards used during exploration show good accuracy.
--  Analyses of blanks show no serious cross contamination problems between
    samples.

The overall conclusion is that QA-QC data generated throughout the Cerro Maricunga Phase IV drilling program meets acceptability criteria and therefore the exploration data can be used with confidence for resource modeling and estimation.

National Instrument 43-101 Compliance

The Cerro Maricunga resource estimate was prepared under CIM Definition Standards (2005). Dr. Eduardo Magri, a mining engineer (University of Witwatersrand) and a Fellow of the Southern African Institute of Mining and Metallurgy with over 30 years of industry experience, is the independent qualified person, as defined by defined by Section 1.5 of NI 43-101, for the resource estimate. Dr. Magri has reviewed and verified the contents of this press release, however is not responsible for the conceptual pit shell.

Mr. Manuel Arre is a mining engineer with 12 years of experience in mine planning and is a registered member of the "Comision Calificadora de Competencias en Recursos y Reservas Mineras" (Chilean Mining Commission, registry n degrees 0193), an accepted foreign association as defined by NI 43-101 (Appendix A). Mr. Arre, an independent qualified person as defined by NI 43-101, generated, reviewed and approved the conceptual pit shell disclosed in this press release.

About Atacama Pacific Gold Corporation

Atacama's business is the acquisition, exploration and development of precious metals resource properties in Chile. Atacama's goal is to become a producer of gold through the exploration and development of the its Cerro Maricunga gold project, located in Region III, 117 kilometres northeast of the city of Copiapo. Atacama also has interests in four other mineral properties within close proximity of Cerro Maricunga and a fifth property in Chile's Region I.

FORWARD LOOKING STATEMENTS

This news release contains forward-looking statements, including predictions, projections and forecasts. Forward-looking statements include, but are not limited to: statements with respect to details of the Cerro Maricunga PEA which was press released January 28, 2013, including, but not limited to, references to potential gold production, estimated operating cash costs, preliminary initial and sustaining capital cost estimates and reference to the potential economic viability and economic returns; statements regarding the expectation to increase mineral resources; statements regarding expectations for receipt of permits and environmental approvals; exploration results (including with respect to water resources); the success of exploration activities generally; mine development prospects; and, potential future gold production. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or "belief", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the results of due diligence activities, changes in economic parameters and assumptions, the interpretation and actual results of current exploration activities; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future prices of gold; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of further economic and technical studies, delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in Atacama's publicly filed documents.

Although Atacama has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view Figure 1 please click on the following link: http://media3.marketwire.com/docs/ATM0129.pdf

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Connected devices and the Internet of Things are getting significant momentum in 2014. In his session at Internet of @ThingsExpo, Jim Hunter, Chief Scientist & Technology Evangelist at Greenwave Systems, examined three key elements that together will drive mass adoption of the IoT before the end of 2015. The first element is the recent advent of robust open source protocols (like AllJoyn and WebRTC) that facilitate M2M communication. The second is broad availability of flexible, cost-effective ...
Collecting data in the field and configuring multitudes of unique devices is a time-consuming, labor-intensive process that can stretch IT resources. Horan & Bird [H&B], Australia’s fifth-largest Solar Panel Installer, wanted to automate sensor data collection and monitoring from its solar panels and integrate the data with its business and marketing systems. After data was collected and structured, two major areas needed to be addressed: improving developer workflows and extending access to a b...
When an enterprise builds a hybrid IaaS cloud connecting its data center to one or more public clouds, security is often a major topic along with the other challenges involved. Security is closely intertwined with the networking choices made for the hybrid cloud. Traditional networking approaches for building a hybrid cloud try to kludge together the enterprise infrastructure with the public cloud. Consequently this approach requires risky, deep "surgery" including changes to firewalls, subnets...
Containers Expo Blog covers the world of containers, as this lightweight alternative to virtual machines enables developers to work with identical dev environments and stacks. Containers Expo Blog offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. Bookmark Containers Expo Blog ▸ Here Follow new article posts on Twitter at @ContainersExpo
The true value of the Internet of Things (IoT) lies not just in the data, but through the services that protect the data, perform the analysis and present findings in a usable way. With many IoT elements rooted in traditional IT components, Big Data and IoT isn’t just a play for enterprise. In fact, the IoT presents SMBs with the prospect of launching entirely new activities and exploring innovative areas. CompTIA research identifies several areas where IoT is expected to have the greatest impac...
There is little doubt that Big Data solutions will have an increasing role in the Enterprise IT mainstream over time. 8th International Big Data Expo, co-located with 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - has announced its Call for Papers is open. As advanced data storage, access and analytics technologies aimed at handling high-volume and/or fast moving data all move center stage, aided by the cloud computing bo...
The 4th International Internet of @ThingsExpo, co-located with the 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - announces that its Call for Papers is open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
The 5th International DevOps Summit, co-located with 17th International Cloud Expo – being held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the...
Over the years, a variety of methodologies have emerged in order to overcome the challenges related to project constraints. The successful use of each methodology seems highly context-dependent. However, communication seems to be the common denominator of the many challenges that project management methodologies intend to resolve. In this respect, Information and Communication Technologies (ICTs) can be viewed as powerful tools for managing projects. Few research papers have focused on the way...
As the world moves from DevOps to NoOps, application deployment to the cloud ought to become a lot simpler. However, applications have been architected with a much tighter coupling than it needs to be which makes deployment in different environments and migration between them harder. The microservices architecture, which is the basis of many new age distributed systems such as OpenStack, Netflix and so on is at the heart of CloudFoundry – a complete developer-oriented Platform as a Service (PaaS...
The Industrial Internet revolution is now underway, enabled by connected machines and billions of devices that communicate and collaborate. The massive amounts of Big Data requiring real-time analysis is flooding legacy IT systems and giving way to cloud environments that can handle the unpredictable workloads. Yet many barriers remain until we can fully realize the opportunities and benefits from the convergence of machines and devices with Big Data and the cloud, including interoperability, ...
You use an agile process; your goal is to make your organization more agile. But what about your data infrastructure? The truth is, today's databases are anything but agile - they are effectively static repositories that are cumbersome to work with, difficult to change, and cannot keep pace with application demands. Performance suffers as a result, and it takes far longer than it should to deliver new features and capabilities needed to make your organization competitive. As your application an...
Move from reactive to proactive cloud management in a heterogeneous cloud infrastructure. In his session at 16th Cloud Expo, Manoj Khabe, Innovative Solution-Focused Transformation Leader at Vicom Computer Services, Inc., will show how to replace a help desk-centric approach with an ITIL-based service model and service-centric CMDB that’s tightly integrated with an event and incident management platform. Learn how to expand the scope of operations management to service management. He will al...
High-performing enterprise Software Quality Assurance (SQA) teams validate systems that are ready for use - getting most actively involved as components integrate and form complete systems. These teams catch and report on defects, making sure the customer gets the best software possible. SQA teams have leveraged automation and virtualization to execute more thorough testing in less time - bringing Dev and Ops together, ensuring production readiness. Does the emergence of DevOps mean the end of E...
Amazon and Google have built software-defined data centers (SDDCs) that deliver massively scalable services with great efficiency. Yet, building SDDCs has proven to be a near impossibility for companies without hyper-scale resources. In his session at 15th Cloud Expo, David Cauthron, CTO and Founder of NIMBOXX, highlighted how a mid-sized manufacturer of global industrial equipment bridged the gap from virtualization to software-defined services, streamlining operations and costs while connect...