Paladin Energy: Financial Report for Six Months Ended 31 December 2013

PERTH, WESTERN AUSTRALIA -- (Marketwired) -- 02/13/14 -- Paladin Energy Ltd ("Paladin" or "the Company") (TSX: PDN)(ASX: PDN) announces the release of its consolidated Financial Report for the six months ended 31 December 2013. The Financial Report is appended to this News Release.

HIGHLIGHTS

OPERATIONS


--  Combined production for the six months ended 31 December 2013 of
    4.253Mlb (1,929t) U3O8 is an increase of 3% over the six months ended 31
    December 2012.
--  Combined production for the quarter ended 31 December 2013 of 2.208Mlb
    (1,001t) U3O8 is an increase of 1% over the quarter ended 31 December
    2012.
--  C1 cost of production(1) continued to fall:
    --  Langer Heinrich C1 cost of production has fallen 8% from US$29.6/lb
        in the December 2012 quarter to US$27.5/lb in the December 2013
        quarter.
    --  Kayelekera C1 cost of production has decreased 24% from US$43.5/lb
        U3O8 in the December 2012 quarter to US$33.1/lb in the December 2013
        quarter.
--  Langer Heinrich produced a record 2,861Mlb (649t) U3O8 for the six
    months ended 31 December 2013, achieving a 5% improvement on the six
    months ended 31 December 2012.
--  Following the decision to place Kayelekera on care and maintenance,
    Paladin revised its FY14 production guidance from 8.3 - 8.7Mlb U3O8 to
    7.8 - 8.0Mlb U3O8.

SALES AND REVENUE


--  Sales revenue totalled US$171.0M for the six months from sales of
    4.448Mlb U3O8.
--  Average realised uranium sales price for the six months was US$38.4/lb
    U3O8, compared to the average UxC spot price for the quarter of
    US$35.5/lb U3O8.

CORPORATE INITIATIVES


--  Refinancing of the Langer Heinrich Mine and the Kayelekera Mine project
    finance facilities announced in January 2014.
--  Sale of a 25% equity stake in Langer Heinrich Mine in Namibia for
    US$190M announced in January 2014 with proceeds to be used to repay
    debt.
--  Placed Kayelekera Mine on care and maintenance post quarter end.

OTHER


--  Debt repayments totaling US$43.8M.
--  A number of cost reduction initiatives have been completed with
    additional measures yet to be implemented.
--  Impairment of Queensland exploration assets of US$226.5M after tax.

(1) C1 cost of production = cost of production excluding product distribution costs, sales royalties and depreciation and amortisation before adjustment for impairment. C1 cost, which is non-IFRS information, is a widely used 'industry standard' term.

Results

(References below to 2013 and 2012 are to the equivalent six months ended 31 December 2013 and 2012 respectively).


--  Safety and Sustainability:


    --  As reported in the September 2013 quarterly report, an employee and
        two contractors were involved in a serious electrical incident at
        Langer Heinrich Mine (LHM) on 2 October 2013. Two of the workers
        received serious burns while the third worker received smoke
        inhalation. The more seriously injured worker passed away on 29
        October 2013 while the second injured worker has since returned to
        work. The findings and outcomes of a full investigation into the
        incident are pending.


    --  The Company's 12-month moving average Lost Time Injury Frequency
        Rate (LTIFR) continues to be low at 1.0. For the December quarter,
        two LTIs were recorded, both from the October electrical incident at
        LHM.


    --  Revised Corporate Health and Safety Standards to complement the
        Paladin Occupational Health and Safety Policy have been established
        following a full review and implementation will begin in early 2014
        at all Paladin operating sites.


--  Production:


    --  Combined production of 4.253Mlb (1,929t) U3O8 for the six months
        ended December 2013, up 3% on the six months ended 31 December 2012.


    --  Combined production for the quarter ended 31 December 2013 of
        2.208Mlb (1,001t) U3O8 is an increase of 1% over the quarter ended
        31 December 2012.


--  Langer Heinrich Mine (LHM):


    --  Record production for the six months to 31 December 2013 was
        2.861Mlb, an increase of 5% over the six months to 31 December 2012:


        --  overall recovery of 88.1%.


        --  feed grades at 803ppm U3O8.


    --  LHM C1 cost of production for the six months has fallen to
        US$27.70/lb, down 10% from US$30.6/lb in the six months to December
        2012.


    --  LHM C1 cost of production has fallen 8% from US$29.6/lb in the
        December 2012 quarter to US$27.5/lb in the December 2013 quarter.
        These results provide further evidence that the cost benefits from
        the cost optimisation programme continue to be realised.


--  Kayelekera Mine (KM):


    --  On 7 February 2014, the Company announced that it is suspending
        production at KM in Malawi and will place KM on care and maintenance
        to preserve the remaining ore body until it determines that a
        sustained recovery in the price of uranium oxide will enable
        production to resume on a profitable basis.


    --  While mining operations at KM are being suspended, processing of ore
        will continue during a transitional rundown phase until reagents and
        consumables on site have been depleted and the production circuit
        has been emptied and cleaned. At this time, the plant will be
        sterilised, shut down and placed on care and maintenance. This
        rundown/sterilisation phase is expected to be completed by May/June
        of 2014.


    --  Paladin is committed to maintaining the mine and infrastructure at
        KM in good working order to facilitate a rapid resumption of
        production when market conditions dictate that it is possible to do
        so profitably. For this reason, KM will retain some 194 Malawi
        national employees and 27 expatriate staff to maintain the site,
        including staff to strengthen physical security measures at KM.


    --  Supporting KM has been a substantial drain on Paladin's cash
        resources during the past three years. Based on a uranium price of
        US$35/lb, Paladin would have had to inject a further US$20M-US$25M
        in cash for each of the next two calendar years to maintain KM.


    --  Placing KM on care and maintenance will improve Paladin's forecast
        cash flow position by US$7M-US$10M (net of care and maintenance
        establishment costs) in calendar year 2014 and US$20M-US$25M in
        calendar year 2015. Paladin anticipates that the ongoing cost of
        maintaining KM on care and maintenance of approximately US$12M per
        annum will be funded from proceeds to be received from the sale of
        uranium oxide on hand and produced during the rundown phase.


    --  Production for the six months to 31 December 2013 was 1.392Mlb, a
        decrease of 1% over the six months to 31 December 2012 due to
        extension of the planned maintenance shutdown:


        --  record production for the month of December of 280,082lb U3O8.


        --  recovery of 85.8%.


        --  acid recovery plant successfully commissioned and operating in
            excess of design.


    --  KM C1 cost of production has fallen 22% from US$46.0/lb in the six
        months to December 2012 to US$35.8/lb.


    --  KM C1 cost of production has decreased 24% from US$43.5/lb U3O8 in
        the December 2012 quarter to US$33.1/lb in the December 2013
        quarter. These results demonstrate that the expected benefits from
        the cost optimisation programme are being realised.


--  Cost Reduction Initiative:


    --  Cost savings and optimisation initiatives were announced during the
        quarter for FY2014 and FY2015, further improving unit costs for
        Langer Heinrich and Kayelekera over these periods and reducing
        corporate costs.


    --  Further savings are expected as the balance of the initiatives are
        implemented.


--  Profit and Loss:


    --  Total sales volume for the six months of 4.448Mlb U3O8 reflected an
        11% increase over sales of 4.008Mlb U3O8 for the six months ended 31
        December 2012.


    --  Sales revenue decreased 12% from US$194.9M in 2012 to US$171.0M for
        the six months ended 31 December 2013, as a result of the lower
        prices in the latter period which were partially offset by higher
        sales volumes. The average realised uranium sales price in 2013 was
        US$38.4/lb U3O8 (2012: US$48.6/lb U3O8) compared to the average UxC
        spot price for the six months of US$35.5/lb U3O8.


    --  Gross loss for the six months of US$29.3M compared to a gross profit
        in 2012 of US$11.3M was due to a 21% lower uranium price achieved in
        the six months and a higher impairment of KM inventory of US$24.9M
        (2012: US$10.4M). This has been partially offset by a 12% increase
        in sales volume.


    --  Impairment of Queensland exploration assets of US$226.5M after tax.


    --  Net loss after tax attributable to members of the Group of US$255.0M
        was recorded for the six months.


--  Cash Flow:


    --  Positive cashflow from operating activities of US$4.3M for the six
        months ended 31 December 2013 after interest payments of US$16.6M.
        The remaining expenditure was US$0.9M for exploration.


    --  Cash outflow from investing activities of US$17.2M for the six
        months:


        --  plant and equipment acquisitions of US$15.0M, predominantly the
            new tailings facility at LHM and nano filtration equipment and
            tailings pipeline at KM; and


        --  capitalised exploration expenditure of US$2.6M. Exploration
            expenditure in foreseeable periods will be lower.

    --  Cash inflow from financing activities of US$34.3M in the six months
        ended 31 December 2013 is mainly attributable to:


        --  the net proceeds received from the share placement of US$78.1M;
            and


        --  repayment of project financing for KM of US$20.0M and LHM of
            US$23.8M.


--  Cash Position:


    --  Cash of US$99.4M at 31 December 2013.


    --  Sale of a 25% joint-venture equity stake in Langer Heinrich Mine in
        Namibia for US$190M announced in January 2014.


    --  In a period when the uranium price is at an 8-year low all options
        are being reviewed to ensure the Company's sustainability and extend
        and preserve cash levels.

--  Exploration and Development:


    --  Aurora - Michelin Uranium Project, Canada - The winter field work
        programme has commenced at Michelin. The camp was opened in
        preparation for drilling start up in the last week of January.
        Drilling will involve two rigs concentrating on infill work at the
        Michelin and Rainbow deposits. The winter conditions will also be
        utilised for geophysical ground surveys over areas not accessible in
        summer.


    --  Manyingee Project, Western Australia - As announced on 13 January
        2014, a revised Mineral Resources estimate for the Manyingee Deposit
        conforming to both the JORC (2012) code and Canadian National
        Instrument 43-101 has been completed. The results include an
        Indicated Mineral Resource of 15.7Mlb U3O8 and an Inferred Mineral
        Resource of 10.2Mlb U3O8, both at an average grade of 850ppm U3O8,
        using a 250ppm and 0.2m minimum thickness cut off. Compared to the
        previous Mineral Resource estimate announced in 1999 (reported at a
        300ppm U3O8 cut off), the updated 2014 Mineral Resource estimate
        shows a minor reduction in contained U3O8 for the Indicated portion
        of the Mineral Resource and an increase in the Inferred portion of
        the Mineral Resource. Despite the change in disequilibrium factor
        used to determine uranium grades, which resulted in a reduction in
        the Indicated Mineral Resource material grade, the overall grade of
        the deposit has increased due to revised geological modelling and
        estimation techniques


--  Guidance FY2014


    --  Following the decision to place KM on care and maintenance, Paladin
        revised its FY14 production guidance from 8.3-8.7Mlb U3O8 to 7.8-
        8.0Mlb U3O8.


--  Sales Volumes


    --  Uranium sales volumes are expected to fluctuate quarter-on-quarter
        due to the uneven timing of contractual commitments and resultant
        scheduling by customers. Now that production has reached design
        levels, sales and production volumes are expected to be comparable
        on an annualised basis.


--  Langer Heinrich Minority Interest Sale


    --  On 20 January 2014, the Company announced that it had signed an
        agreement on 18 January 2014 to sell a 25% joint-venture equity
        stake in its flagship Langer Heinrich uranium mining operation in
        Namibia to China Uranium Corporation Limited, a wholly owned
        subsidiary of China National Nuclear Corporation (CNNC), the leading
        Chinese nuclear utility, for consideration of US$190M.


    --  An offtake component of the agreement will allow CNNC to purchase
        its pro-rata share of product based on the prevailing market spot
        price at the time of sale. There is also an opportunity for Paladin
        to benefit by securing additional long term offtake arrangements
        with CNNC, at arm's length market rates, from Paladin's share of
        Langer Heinrich production.


    --  The respective Boards of Paladin and CNNC have approved the
        transaction. Completion is subject only to certain Chinese
        regulatory approvals (including the National Development and Reform
        Commission), which are expected to be obtained by mid-2014, and
        routine consents for the transaction from Paladin's project
        financiers and the Bank of Namibia. CNNC has paid a US$20M non-
        refundable deposit to an escrow agent. The deposit will become non-
        refundable on receipt by the escrow agent of the routine consents
        for the transaction from Paladin's project financiers and the Bank
        of Namibia.


    --  Proceeds from the sale will be utilised to repay debt across the
        Company.


--  Successful Refinancing of Langer Heinrich and Kayelekera Facilities -
    Post Quarter


    --  On 17 January 2014, the Company announced that it had entered into
        agreements with its lenders to refinance the LHM and the KM project
        finance facilities. All conditions precedent to drawdown were
        satisfied on 29 January 2014 and completion occurred on that date.


    --  This new facility will provide significant cash flow benefits to
        both projects and leaves Paladin in a much stronger financial
        position. The annual principal repayments across both projects will
        be reduced from US$53.8M per annum to US$18.3M per annum in calendar
        year 2014, a substantial reduction of US$35.5M, with the first
        repayment not due until June 2014.


    --  In calendar year 2015, annual principal repayments under the
        existing facilities compared to the new facility will be reduced by
        a further US$23.7M.

The documents comprising the Appendix 4D - Financial Report for the six months ended 31 December 2013, including the Management Discussion and Analysis, Financial Statements and Certifications are attached and will be filed with the Company's other documents on Sedar (sedar.com) and on the Company's website (paladinenergy.com.au).

Generally Accepted Accounting Practice

The news release includes non-GAAP performance measures: C1 cost of production, non-cash costs as well as other income and expenses. The Company believes that, in addition to the conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company's performance and ability to generate cash flow. The additional information provided herein should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.

Declaration

The information in this announcement that relates to minerals exploration and mineral resources is based on information compiled by David Princep BSc, FAusIMM (CP) who has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Princep is a full-time employee of Paladin Energy Ltd. Mr. Princep consents to the inclusion of the information in this announcement in the form and context in which it appears. The mineral resources for the Manyingee deposit were announced to the ASX on the 13 January 2014 and the information contained within has not materially changed since it was last reported.

Conference Call

Conference Call and Investor Update is scheduled for 06:30 Perth & Hong Kong, Friday 14 February 2014, 17:30 Toronto and 22:30 London, Thursday 13 February 2014. Details are included in a separate news release dated 11 February 2014.

To view the entire document, including financials and MD&A, please visit the following link: http://media3.marketwire.com/docs/Report_12-2013.pdf.

ACN 061 681 098

Contacts:
Paladin Energy Ltd
John Borshoff
Managing Director/CEO
+61-8-9381-4366 or Mobile: +61-419-912-571
[email protected]

Paladin Energy Ltd
Alan Rule
Chief Financial Officer
+61-8-9381-4366 or Mobile: +61-438- 942-144
[email protected]

Paladin Energy Ltd
Andrew Mirco
Investor Relations Contact
+61-8-9381-4366 or Mobile: +61-409-087-171
[email protected]

Paladin Energy Ltd
Greg Taylor
Investor Relations Contact
+1-905-337-7673 or Mobile: +1-416-605-5120 (Toronto)
[email protected]

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Media announced that Centrify, a provider of unified identity management across cloud, mobile and data center environments that delivers single sign-on (SSO) for users and a simplified identity infrastructure for IT, has launched an ad campaign on Cloud Computing Journal. The ads focus on security: how an organization can successfully control privilege for all of the organization’s identities to mitigate identity-related risk without slowing down the business, and how Centrify provides ...
The Internet of Things will greatly expand the opportunities for data collection and new business models driven off of that data. In her session at @ThingsExpo, Esmeralda Swartz, CMO of MetraTech, discussed how for this to be effective you not only need to have infrastructure and operational models capable of utilizing this new phenomenon, but increasingly service providers will need to convince a skeptical public to participate. Get ready to show them the money!
We are reaching the end of the beginning with WebRTC, and real systems using this technology have begun to appear. One challenge that faces every WebRTC deployment (in some form or another) is identity management. For example, if you have an existing service – possibly built on a variety of different PaaS/SaaS offerings – and you want to add real-time communications you are faced with a challenge relating to user management, authentication, authorization, and validation. Service providers will w...
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
In her General Session at 15th Cloud Expo, Anne Plese, Senior Consultant, Cloud Product Marketing, at Verizon Enterprise, focused on finding the right mix of renting vs. buying Oracle capacity to scale to meet business demands, and offer validated Oracle database TCO models for Oracle development and testing environments. Anne Plese is a marketing and technology enthusiast/realist with over 19+ years in high tech. At Verizon Enterprise, she focuses on driving growth for the Verizon Cloud platfo...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
Lori MacVittie is responsible for education and evangelism of application services available across F5's entire product suite. Her role includes authorship of technical materials and participation in a number of community-based forums and industry standards organizations, among other efforts. MacVittie has extensive programming experience as an application architect, as well as network and systems development and administration expertise. Prior to joining F5, MacVittie was an award-winning Senio...
15th Cloud Expo, which took place Nov. 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA, expanded the conference content of @ThingsExpo, Big Data Expo, and DevOps Summit to include two developer events. IBM held a Bluemix Developer Playground on November 5 and ElasticBox held a Hackathon on November 6. Both events took place on the expo floor. The Bluemix Developer Playground, for developers of all levels, highlighted the ease of use of Bluemix, its services and functionalit...
SYS-CON Media announced today that Skytap blog on "DevOps Journal" exceeded 84,000 story reads. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Noel Wurst is the managing content editor at Skytap. Skytap provides SaaS-based dev/test environments to the enterprise. Skytap solution removes the inefficiencies and constraints that comp...
SYS-CON Events announced today that Gridstore™, the leader in hyper-converged infrastructure purpose-built to optimize Microsoft workloads, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Gridstore™ is the leader in hyper-converged infrastructure purpose-built for Microsoft workloads and designed to accelerate applications in virtualized environments. Gridstore’s hyper-converged infrastructure is the ...
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to th...
"There is a natural synchronization between the business models, the IoT is there to support ,” explained Brendan O'Brien, Co-founder and Chief Architect of Aria Systems, in this SYS-CON.tv interview at the 15th International Cloud Expo®, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
How do APIs and IoT relate? The answer is not as simple as merely adding an API on top of a dumb device, but rather about understanding the architectural patterns for implementing an IoT fabric. There are typically two or three trends: Exposing the device to a management framework Exposing that management framework to a business centric logic Exposing that business layer and data to end users. This last trend is the IoT stack, which involves a new shift in the separation of what stuff happe...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.