Click here to close now.

SYS-CON MEDIA Authors: JP Morgenthal, AppDynamics Blog, John Wetherill, Harry Trott, Roger Strukhoff

News Feed Item

Timberline Announces Hard Rock Operating Permit Update for Butte Highlands Gold Project

COEUR D'ALENE, IDAHO -- (Marketwired) -- 02/17/14 -- Timberline Resources Corporation (NYSE MKT:TLR)(TSX VENTURE:TBR) ("Timberline" or the "Company") announced today that the Montana Department of Environmental Quality ("MDEQ") has provided an updated schedule anticipated for completion of the Final Environmental Impact Statement ("Final EIS") for the Butte Highlands Joint Venture ("BHJV")'s proposed underground gold mine in the Highland Mountains south of Butte, Montana. The Final EIS is a critical remaining step toward receipt of a Final Hard Rock Operating Permit (HROP) for the Project. The Company also announced recently received assay results from drilling completed in preparation for advancement of mining to the proposed bulk sample area.

The MDEQ has provided the Company a revised estimate that completion of the Final EIS will be before the end of March. The agency currently continues evaluation and response to public comments provided following release of the Draft EIS in October, 2013. Two weeks after release of the Final EIS, the MDEQ will prepare a Record of Decision document after which the project bond can be issued. The Final HROP would be signed by the Director of the MDEQ immediately thereafter allowing commencement of production.

Timberline also announced additional results from underground drill holes completed in 2013. Hole BHUG13-003 was drilled to confirm continuity of mineralization within the main zone in the proposed bulk sample area. The hole also intercepted the lower, footwall zone where assays confirm significant mineralization. Assay highlights include:


----------------------------------------------------------------------------
                             Gold                     Gold                  
              From  Length   (opt)    From   Length   (g/t)                 
Drill Hole   (feet)  (feet)    (i) (metres) (metres)   (ii) Zone            
----------------------------------------------------------------------------
BHUG11-003   182.1    22.3   0.32    55.50     6.80  10.96  Bulk Sample Area
----------------------------------------------------------------------------
BHUG11-003   255.0    20.4   0.19    77.72     6.22   6.50                  
----------------------------------------------------------  Lower Footwall  
 including   262.4    13.0   0.28    79.98     3.96   9.59                  
----------------------------------------------------------------------------
(i)ounces/ton, (ii)grams/tonne                                              

On-going development activities under the existing exploration license continue at the site and are now focused on completion of a new dewatering well which will be important to initiating mining. The well has been drilled and is currently being prepared for pump installation.

Timberline President and CEO, Paul Dircksen, commented, "We look forward to completion of the Final EIS as a major milestone in permitting of the Butte Highlands Project. Steady progress continues toward reaching production on this important project for the Company."

Timberline owns a 50-percent carried-to-production interest in BHJV, which owns the Butte Highlands Gold Project where mining is expected to commence following the issuance of the HROP and the U.S. Forest Service approval of a road-use plan of operations for material haulage. Timberline's joint venture partner is funding all mine development costs through to commercial production with Timberline's share of those costs to be repaid from proceeds of future mine production.

About Timberline Resources

Timberline Resources Corporation is exploring and developing advanced-stage gold properties in the western United States. Timberline holds a 50-percent carried interest ownership stake in the Butte Highlands Joint Venture in Montana. Timberline's exploration is primarily focused on the major gold districts of Nevada, where it is advancing its flagship Lookout Mountain Project toward a production decision while exploring a pipeline of quality earlier-stage projects at its South Eureka Property and elsewhere. Timberline management has a proven track record of discovering economic mineral deposits that are developed into profitable mines.

Timberline is listed on the NYSE MKT where it trades under the symbol "TLR" and on the TSX Venture Exchange where it trades under the symbol "TBR".

Cautionary Note

The Company clarifies that BHJV has decided to advance the Butte Highlands Gold Project into production without first establishing NI 43-101 compliant mineral resources supported by an independent technical report or completing a feasibility study. A production decision without the benefit of a technical report independently establishing mineral resources or reserves and any feasibility study demonstrating economic and technical viability creates increased uncertainty and heightens economic and technical risks of failure associated with the Butte Highlands Project.

Forward-looking Statements

Statements contained herein that are not based upon current or historical fact are forward-looking in nature and constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such forward-looking statements reflect the Company's expectations about its future operating results, performance and opportunities that involve substantial risks and uncertainties. These statements include but are not limited to statements regarding the timing and results of the Company's continued exploration and drill program at South Eureka and Lookout Mountain, the timing of assay results from such drilling program being released, the Company's ability to expand and upgrade the South Eureka resource, the timing or results of the Company's exploration and development plans and programs at Butte Highlands, including the timing of obtaining necessary permits, the development of and production at the Company's Butte Highlands project and projects on its South Eureka property, the potential life of the mine at the Butte Highlands project, the targeted production date for the Butte Highlands project, targeted date for production at South Eureka, the potential for a heap-leach mine at South Eureka, and possible growth of the Company and the Company's expected operations, including potential development of an open pit extraction and heap leach processing and operation at South Eureka. When used herein, the words "anticipate", "believe", "estimate", "upcoming", "plan", "target", "intend" and "expect" and similar expressions, as they relate to Timberline Resources Corporation, its subsidiaries, or its management, are intended to identify such forward-looking statements. These forward-looking statements are based on information currently available to the Company and are subject to a number of risks, uncertainties, and other factors that could cause the Company's actual results, performance, prospects, and opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, risks related to the timing and completion of the drilling programs at Butte Highlands and South Eureka, risks and uncertainties related to mineral estimates, risks related to the inherently dangerous activity of mining, and other such factors, including risk factors discussed in the Company's Annual Report on Form 10-K for the year ended September 30, 2013. Except as required by Federal Securities law, the Company does not undertake any obligation to release publicly any revisions to any forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Timberline Resources Corporation
Paul Dircksen
CEO
208.664.4859

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
What are the benefits of using an enterprise-grade orchestration platform? In their session at 15th Cloud Expo, Nate Gordon, Director of Technology at Appcore, and Kedar Poduri, Senior Director of Product Management at Citrix Systems, took a closer look at the architectural design factors needed to support diverse workloads and how to run these workloads efficiently as a service provider. They also discussed how to deploy private cloud environments in 15 minutes or less.
In his session at DevOps Summit, Andrei Yurkevich, CTO at Altoros, provided an overview of all the benefits and opportunities, as well as drawbacks of deploying Cloud Foundry PaaS with Juju and compared it to BOSH. Discover the features that overlap, and understand what Juju Charm is, what it is not, where you use one or the other or where you use both BOSH and Juju Charms together. Andrei Yurkevich is Cloud Foundry protagonist and CTO at Altoros. Under his supervision, the Altoros engineering ...
Cultural, regulatory, environmental, political and economic (CREPE) conditions over the past decade are creating cross-industry solution spaces that require processes and technologies from both the Internet of Things (IoT), and Data Management and Analytics (DMA). These solution spaces are evolving into Sensor Analytics Ecosystems (SAE) that represent significant new opportunities for organizations of all types. Public Utilities throughout the world, providing electricity, natural gas and water,...
The Internet of Things will put IT to its ultimate test by creating infinite new opportunities to digitize products and services, generate and analyze new data to improve customer satisfaction, and discover new ways to gain a competitive advantage across nearly every industry. In order to help corporate business units to capitalize on the rapidly evolving IoT opportunities, IT must stand up to a new set of challenges. In his session at @ThingsExpo, Jeff Kaplan, Managing Director of THINKstrateg...
For better or worse, DevOps has gone mainstream. All doubt was removed when IBM and HP threw up their respective DevOps microsites. Where are we on the hype cycle? It's hard to say for sure but there's a feeling we're heading for the "Peak of Inflated Expectations." What does this mean for the enterprise? Should they avoid DevOps? Definitely not. Should they be cautious though? Absolutely. The truth is that DevOps and the enterprise are at best strange bedfellows. The movement has its roots in t...
The true value of the Internet of Things (IoT) lies not just in the data, but through the services that protect the data, perform the analysis and present findings in a usable way. With many IoT elements rooted in traditional IT components, Big Data and IoT isn’t just a play for enterprise. In fact, the IoT presents SMBs with the prospect of launching entirely new activities and exploring innovative areas. CompTIA research identifies several areas where IoT is expected to have the greatest impac...
One of the biggest challenges when developing connected devices is identifying user value and delivering it through successful user experiences. In his session at Internet of @ThingsExpo, Mike Kuniavsky, Principal Scientist, Innovation Services at PARC, described an IoT-specific approach to user experience design that combines approaches from interaction design, industrial design and service design to create experiences that go beyond simple connected gadgets to create lasting, multi-device exp...
Can call centers hang up the phones for good? Intuitive Solutions did. WebRTC enabled this contact center provider to eliminate antiquated telephony and desktop phone infrastructure with a pure web-based solution, allowing them to expand beyond brick-and-mortar confines to a home-based agent model. It also ensured scalability and better service for customers, including MUY! Companies, one of the country's largest franchise restaurant companies with 232 Pizza Hut locations. This is one example of...
There is little doubt that Big Data solutions will have an increasing role in the Enterprise IT mainstream over time. 8th International Big Data Expo, co-located with 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - has announced its Call for Papers is open. As advanced data storage, access and analytics technologies aimed at handling high-volume and/or fast moving data all move center stage, aided by the cloud computing bo...
Some developers believe that monitoring is a function of the operations team. Some operations teams firmly believe that monitoring the systems they maintain is sufficient to run the business successfully. Most of them are wrong. The complexity of today's applications have gone far and beyond the capabilities of "traditional" system-level monitoring tools and approaches and requires much broader knowledge of business and applications as a whole. The goal of DevOps is to connect all aspects of app...
DevOps is the hottest moving target when it comes to software development methodologies. Many people fear that this fast-paced, barrier-breaking movement will leave information security best practices in the dust. Analysts provide recommendations to security professionals using bingo-laden terms like "moving security to the left" or "get a seat at the table." What we need are real-world examples and tactics for security practitioners to be part of DevOps. In his session at DevOps Summit, Andrew...
Containers Expo Blog covers the world of containers, as this lightweight alternative to virtual machines enables developers to work with identical dev environments and stacks. Containers Expo Blog offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. Bookmark Containers Expo Blog ▸ Here Follow new article posts on Twitter at @ContainersExpo
The Internet of Things will greatly expand the opportunities for data collection and new business models driven off of that data. In her session at @ThingsExpo, Esmeralda Swartz, CMO of MetraTech, discussed how for this to be effective you not only need to have infrastructure and operational models capable of utilizing this new phenomenon, but increasingly service providers will need to convince a skeptical public to participate. Get ready to show them the money!
DevOps is all about agility. However, you don't want to be on a high-speed bus to nowhere. The right DevOps approach controls velocity with a tight feedback loop that not only consists of operational data but also incorporates business context. With a business context in the decision making, the right business priorities are incorporated, which results in a higher value creation. In his session at DevOps Summit, Todd Rader, Solutions Architect at AppDynamics, discussed key monitoring techniques...
SYS-CON Events announced today that MetraTech, now part of Ericsson, has been named “Silver Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9–11, 2015, at the Javits Center in New York, NY. Ericsson is the driving force behind the Networked Society- a world leader in communications infrastructure, software and services. Some 40% of the world’s mobile traffic runs through networks Ericsson has supplied, serving more than 2.5 billion subscribers.