SYS-CON MEDIA Authors: Elizabeth White, Yeshim Deniz, Glenn Rossman, Pat Romanski, Cynthia Dunlop

News Feed Item

Duluth Metals continues to identify additional PGM mineralization in the East Shore area of their exploration lands

TORONTO, March 3, 2014 /PRNewswire/ - Duluth Metals Limited ("Duluth, Duluth Metals") (TSX: DM) (TSX:DM.U) is pleased to announce an exploration update on the East Shore property which is part of Duluth's 100% owned exploration properties in the Duluth Complex, northeast Minnesota. In 2012, Duluth Metals geologists discovered a previously unidentified zone of palladium-platinum in the eastern marginal zone of the South Kawishiwi Intrusion (SKI), Duluth Complex. Highlights from a recent four hole shallow drill program include hole 14-DM-052 which returned 11.8 feet of 1.993 TPM (TPM=Pt+Pd+Au, expressed as grams per tonne), 0.505% copper and 0.172% nickel, and hole 14-DM-049 which returned 11.3 feet of 1.794 TPM, 0.399% copper and 0.121% nickel.

Vern Baker, President of Duluth Metals commented, "Following up on 2012 results the Duluth geological team focused on mapping, geophysics interpretation, and sampling in the area of enriched PGM mineralization.  That work developed a geologic model for the area. The geologic model developed from the consistent pattern of finding PGM rich anorthositic rocks just to the east of a xenolithic contact zone between the troctolite of the SKI and the Anorthositic Series (AN-Series). This pattern coincided with a geophysical signature related to the xenolith package. The geologic model hypothesizes an enrichment zone contiguous with this contact. Results from this limited shallow drill program consistently show enriched PGMs adjacent to the contact. This strengthens the model and indicates additional work to identify areas of stronger mineralization."

The mineralization occurs in numerous outcrops and in float, along the contact between the AN-Series and the SKI south of Bogberry Lake, as reported by Duluth Metals in a February 5, 2013 Press Release entitled "Duluth Metals Identifies Two New Mineralized Areas on Exploration Lands". The mineralization consists of fine to medium-grained chalcopyrite, pyrrhotite, and PGE-bearing minerals. Outcrop sampling results from sulfide-rich gabbroic anorthosite of the AN-Series yielded up to 3.54 g/t TPM, and float sampling up to 7.74 g/t TPM. Two drillholes intersected the mineralized zone at depth; 12-DM-007 returned an 11.7 foot intersection of 3.28 g/t TPM, and 12-DM-006 returned a 13.9 foot intersection of 1.63 g/t TPM.

Work during the 2013 field season focused on further delineating this mineralized zone. A curvilinear magnetic lineament, which trends to the northwest, and the SKI - AN-Series contact between Bogberry and Heart Lake were investigated for PGE potential.  Numerous high-grade outcrop samples were collected in addition to the second highest Duluth Metals Pt in till value 47 ppb (where >10 ppb is highly anomalous).  Large outcrop samples (1-5 kg in weight) yielded up to 2.03 g/ton TPM. Grab samples from outcrops contained up to 1.64 g/ton TPM. A consistent ~2:1 ratio of Pd to Pt is observed for most outcrop and boulder samples, while copper contents are typically low (0.08-0.33 wt %). Detailed mapping (1:5,000 scale) and assay highlights from over two hundred till and rock geochemical samples that were collected in the area during the 2012-2013 field season are presented in Figure 1.

Drill sections for holes 14-DM-049 and 050 are presented in Figure 2, and for holes 14-DM-051 and 052 in Figure 3, respectively. The sections demonstrate that the mapped surface PGE-enriched mineralization of the margin of the AN-Series, where the presence of magnetic basalt and sandstone xenoliths occur, has continuity at depth.

Currently, the mineralized zone, which ranges from 1.0 to 5.0 g/t TPM (TPM = platinum+palladium+gold, expressed as grams per tonne), is defined along 1.2 km strike length and extends down dip to a known depth of 200 feet. The mineralization occurs along the contact between the SKI and AN-Series gabbroic anorthosites. The hanging wall troctolite is very heterogeneous and contains numerous oxide-rich magnetic xenoliths. The spatial relationship between the magnetic xenoliths and mineralization suggests PGE-prospectivity could extend an additional 1.5 km to the northwest along a curvilinear magnetic lineament defined by these oxide-rich xenoliths. Geophysical conductors, ~2.5 km south of known high-grade outcrops, along the trend of heterogeneous troctolitic rocks at the SKI - AN-Series contact suggest further potential for PGE-rich zones along the entire southern extent of the contact.

The xenoliths consists of dark grey, fine-grained, non-magnetic to magnetic basalt from the North Shore Volcanic Group, and a light brownish-grey, banded, granular, plagioclase-magnetite-rich rock interpreted to belong to the Colvin Creek metasedimentary package. PGE-mineralization hosted within the anorthosite footwall consistently occurs beneath the magnetic basalt/Colvin Creek xenolith package. The mineralized zone consists of fine-to medium-grained disseminated chalcopyrite with minor pyrrhotite.

The East Shore area property is part of Duluth's 40,000 acres of 100% owned exploration properties.  The location of the East Shore property is shown in Figure 4.

About the Sampling

Duluth Metals adheres to a rigorous QA/QC program as a part of sampling procedures throughout the drill program. Duplicate, blank, and reference standards are inserted into the sample stream prior to submittal the laboratory. Half core samples are crushed and pulverized at ALS Minerals in Thunder Bay, Ontario, and then shipped to its analytical facilities in Vancouver, British Columbia. Samples are analyzed for Au, Pt, and Pd using a 30 gram fire assay with an ICP-AES finish, and for Cu, Ni, and other trace elements using a four acid (near total) digestion and a combination of ICP-MS and ICP-AES finishes. Overlimits are re-analyzed using sodium peroxide fusion, acid dissolution, followed by an ICP-AES finish. The remaining half core samples are stored in Minnesota.

Phillip Larson, P. Geo. is the Qualified Person for Duluth Metals and Senior Geologist for Duluth Metals, in accordance with NI 43-101 of the Canadian Securities Administrators, and is responsible for Duluth Metal's technical content of this press release and quality assurance of the exploration data and analytical results.

About Duluth Metals Limited

Duluth Metals Limited is committed to acquiring, exploring and developing copper, nickel and platinum group metal (PGM) deposits. Duluth Metals has a joint venture with Antofagasta plc on the Twin Metals Project, located within the rapidly emerging Duluth Complex mining camp in north-eastern Minnesota. The Duluth Complex hosts one of the world's largest undeveloped repositories of copper, nickel and PGMs, including the world's third largest accumulation of nickel sulphides, and one of the world's largest accumulations of polymetallic copper and platinum group metals. Aside from the joint venture, Duluth Metals retains a 100% position on approximately 40,000 acres of mineral interests on exploration properties adjacent to and nearby the Twin Metals Minnesota LLC joint venture.

This press release contains forward-looking statements (including "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the US Private Securities Litigation Reform Act of 1995) relating to, among other things, the results of drilling operations of Duluth Metals and exploration and mine development. Generally, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Duluth Metals has relied on a number of assumptions and estimates in making such forward-looking statements, including, without limitation, the prices of copper, nickel and platinum group metals (PGMs) and the costs associated with continuing exploration and mining development. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actual results, level of activity, performance or outcomes of such exploration and/or mine development to be materially different from those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will result in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans continue to be refined, the ability to execute planned exploration and future drilling programs, possible variations of copper, nickel and PGM grade or recovery rates, the need for additional funding to continue exploration efforts, changes in general economic, market and business conditions, and those other risks set forth in Duluth Metals' most recent annual information form under the heading "Risk Factors" and in its other public filings. Statements related to "reserves" and "resources" are deemed forward-looking statements as they involve the implied assessment, based on realistically assumed and justifiable technical and economic conditions, that an inventory of mineralization will become economically extractable. Forward-looking statements are not guarantees of future performance and such information is inherently subject to known and unknown risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Duluth Metals. Although Duluth Metals has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking statements. In addition, all forward-looking statements in this press release are given as of the date hereof. Duluth Metals disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws. The forward-looking statements contained herein are expressly qualified by this disclaimer.

Cautionary Note to United States Investors Concerning Estimates of Indicated and Inferred Mineral Resources
This press release uses the terms "Indicated Mineral Resources" and "Inferred Mineral Resources" in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards. While such terms are recognized under Canadian securities legislation, the United States Securities and Exchange Commission does not recognize these terms. The term "Inferred Mineral Resource" refers to a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. These estimates are based on limited information and it cannot be assumed that all or any part of an "Inferred Mineral Resource" will be upgraded to a higher classification resource, such as "Indicated" or "Measured", as a result of continued exploration. Accordingly, an estimate relating to an "Inferred Mineral Resource" is insufficient to allow meaningful application of technical and economic parameters or to enable an evaluation of economic viability. Under Canadian securities legislation, estimates of an "Inferred Mineral Resource" may not form the basis of feasibility or other economic studies. Investors are cautioned not to assume that all or any part of an "Inferred Mineral Resource" is economically or legally mineable. Investors are also cautioned not to assume that all or any part of "Indicated" will ever be converted into "Mineral Reserves" (being the economically mineable part of an "Indicated" or "Measured Mineral Resource").

SOURCE Duluth Metals Limited

Image with caption: "Figure 1. Bedrock geology, geochemical sample, and drill hole location map. (CNW Group/Duluth Metals Limited)". Image available at: http://photos.newswire.ca/images/download/20140303_C8341_PHOTO_EN_37360.jpg

Image with caption: "Figure 2. Geologic and drill hole cross section of holes 14-DM-049 and 050. (CNW Group/Duluth Metals Limited)". Image available at: http://photos.newswire.ca/images/download/20140303_C8341_PHOTO_EN_37361.jpg

Image with caption: "Figure 3. Geologic and drill hole cross section of holes 14-DM-051 and 052. (CNW Group/Duluth Metals Limited)". Image available at: http://photos.newswire.ca/images/download/20140303_C8341_PHOTO_EN_37362.jpg

Image with caption: "Figure 4. Bogberry Lake Project Location Map. (CNW Group/Duluth Metals Limited)". Image available at: http://photos.newswire.ca/images/download/20140303_C8341_PHOTO_EN_37363.jpg

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

@CloudExpo Stories
SYS-CON Events announced today that Verizon has been named "Gold Sponsor" of SYS-CON's 15th International Cloud Expo®, which will take place on November 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA. Verizon Enterprise Solutions creates global connections that generate growth, drive business innovation and move society forward. With industry-specific solutions and a full range of global wholesale offerings provided over the company's secure mobility, cloud, strategic network...
Ixia develops amazing products so its customers can connect the world. Ixia helps its customers provide an always-on user experience through fast, secure delivery of dynamic connected technologies and services. Through actionable insights that accelerate and secure application and service delivery, Ixia's customers benefit from faster time to market, optimized application performance and higher-quality deployments.
SimpleECM is the only platform to offer a powerful combination of enterprise content management (ECM) services, capture solutions, and third-party business services providing simplified integrations and workflow development for solution providers. SimpleECM is opening the market to businesses of all sizes by reinventing the delivery of ECM services. Our APIs make the development of ECM services simple with the use of familiar technologies for a frictionless integration directly into web applicat...
Blue Box has closed a $10 million Series B financing. The round was led by a strategic investor and included participation from prior investors including Voyager Capital and Founders Collective, as well as the Blue Box executive team. This round follows a $4.3 million Series A closed in December of 2012 and led by Voyager Capital. In May of this year, the company announced general availability of its private cloud as a service offering, Blue Box Cloud. Since that release, the company has dem...
The only place to be June 9-11 is Cloud Expo & @ThingsExpo 2015 East at the Javits Center in New York City. Join us there as delegates from all over the world come to listen to and engage with speakers & sponsors from the leading Cloud Computing, IoT & Big Data companies. Cloud Expo & @ThingsExpo are the leading events covering the booming market of Cloud Computing, IoT & Big Data for the enterprise. Speakers from all over the world will be hand-picked for their ability to explore the economic...
Cloudwick, the leading big data DevOps service and solution provider to the Fortune 1000, announced Big Loop, its multi-vendor operations platform. Cloudwick Big Loop creates greater collaboration between Fortune 1000 IT staff, developers and their database management systems as well as big data vendors. This allows customers to comprehensively manage and oversee their entire infrastructure, which leads to more successful production cluster operations, and scale-out. Cloudwick Big Loop supports ...
To manage complex web services with lots of calls to the cloud, many businesses have invested in Application Performance Management (APM) and Network Performance Management (NPM) tools. Together APM and NPM tools are essential aids in improving a business’s infrastructure required to support an effective web experience… but they are missing a critical component – Internet visibility. Internet connectivity has always played a role in customer access to web presence, but in the past few years use...
SAP is delivering break-through innovation combined with fantastic user experience powered by the market-leading in-memory technology, SAP HANA. In his General Session at 15th Cloud Expo, Thorsten Leiduck, VP ISVs & Digital Commerce, SAP, will discuss how SAP and partners provide cloud and hybrid cloud solutions as well as real-time Big Data offerings that help companies of all sizes and industries run better. SAP launched an application challenge to award the most innovative SAP HANA and SAP ...
Software AG helps organizations transform into Digital Enterprises, so they can differentiate from competitors and better engage customers, partners and employees. Using the Software AG Suite, companies can close the gap between business and IT to create digital systems of differentiation that drive front-line agility. We offer four on-ramps to the Digital Enterprise: alignment through collaborative process analysis; transformation through portfolio management; agility through process automation...
What are the benefits of using an enterprise-grade orchestration platform? In their session at 15th Cloud Expo, Jeff Tegethoff, CEO of Appcore, and Kedar Poduri, Senior Director of Product Management at Citrix Systems, will take a closer look at the architectural design factors needed to support diverse workloads and how to run these workloads efficiently as a service provider. They will also discuss how to deploy private cloud environments in 15 minutes or less.
Headquartered in Santa Monica, California, Bitium was founded by Kriz and Erik Gustavson. The 1,500 cloud-based application using Bitium’s analytics, app management, and single sign-on services include bug trackers, customer service dashboards, Google Apps, and social networks. The firm states website administrators can do multiple tasks online without revealing passwords. Bitium’s advisors include Microsoft’s former CMO and the former senior vice president of strategy, the founder and CEO of Li...
The Transparent Cloud-computing Consortium (abbreviation: T-Cloud Consortium) will conduct research activities into changes in the computing model as a result of collaboration between "device" and "cloud" and the creation of new value and markets through organic data processing High speed and high quality networks, and dramatic improvements in computer processing capabilities, have greatly changed the nature of applications and made the storing and processing of data on the network commonplace. ...
StackIQ offers a comprehensive software suite that automates the deployment, provisioning, and management of Big Infrastructure. With StackIQ’s software, you can spin up fully configured big data clusters, quickly and consistently — from bare-metal up to the applications layer — and manage them efficiently. Our software’s modular architecture allows customers to integrate nearly any application with the StackIQ software stack.
Things are being built upon cloud foundations to transform organizations. This CEO Power Panel at 15th Cloud Expo, moderated by Roger Strukhoff, Cloud Expo and @ThingsExpo conference chair, will address the big issues involving these technologies and, more important, the results they will achieve. How important are public, private, and hybrid cloud to the enterprise? How does one define Big Data? And how is the IoT tying all this together?
The Internet of Things (IoT) is going to require a new way of thinking and of developing software for speed, security and innovation. This requires IT leaders to balance business as usual while anticipating for the next market and technology trends. Cloud provides the right IT asset portfolio to help today’s IT leaders manage the old and prepare for the new. Today the cloud conversation is evolving from private and public to hybrid. This session will provide use cases and insights to reinforce t...
TechCrunch reported that "Berlin-based relayr, maker of the WunderBar, an Internet of Things (IoT) hardware dev kit which resembles a chunky chocolate bar, has closed a $2.3 million seed round, from unnamed U.S. and Switzerland-based investors. The startup had previously raised a €250,000 friend and family round, and had been on track to close a €500,000 seed earlier this year — but received a higher funding offer from a different set of investors, which is the $2.3M round it’s reporting."...
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
The Industrial Internet revolution is now underway, enabled by connected machines and billions of devices that communicate and collaborate. The massive amounts of Big Data requiring real-time analysis is flooding legacy IT systems and giving way to cloud environments that can handle the unpredictable workloads. Yet many barriers remain until we can fully realize the opportunities and benefits from the convergence of machines and devices with Big Data and the cloud, including interoperability, da...
All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to the Internet by 2020. This number will continue to grow at a rapid pace for the next several decades. Over the summer Gartner released its much anticipated annual Hype Cycle report and the big news is that Internet of Things has now replaced Big Data as the most hyped technology. Indeed, we're hearing more and more about this fascinating new technological paradigm. ...
In his session at 15th Cloud Expo, Mark Hinkle, Senior Director, Open Source Solutions at Citrix Systems Inc., will provide overview of the open source software that can be used to deploy and manage a cloud computing environment. He will include information on storage, networking(e.g., OpenDaylight) and compute virtualization (Xen, KVM, LXC) and the orchestration(Apache CloudStack, OpenStack) of the three to build their own cloud services.