Click here to close now.

SYS-CON MEDIA Authors: Elizabeth White, Hovhannes Avoyan, Pat Romanski, Rex Morrow, Datical, Liz McMillan

News Feed Item

Surface Drilling Extends Amalgamated Break Zones 500 Feet East; Drill Hole AB-13-118 Assays 5.54 Ounces of Gold Per Ton (189.94 Grams of Gold Per Tonne) Over 0.9 Feet (0.3m) True Width

KIRKLAND LAKE, ONTARIO -- (Marketwired) -- 03/10/14 -- Kirkland Lake Gold Inc. (the Company) (TSX:KGI)(AIM:KGI), an operating and exploration gold company, is pleased to announce recent drilling results from its ongoing surface diamond drilling exploration program. This latest program utilized one drill rig on the South Claims Property (See Figure 1), in a continuing effort to define potential near surface resources.

Mr. George Ogilvie, CEO commented, "We are further encouraged with the results of our surface program and the continued extension of the mineralized zone to the east. This will be the first year that this near surface mineralization will be brought into a compliant NI43-101 resource, when it is released (expected this spring). Beyond that, we will look to continue expanding the resource with the ultimate goal of creating a NI43-101 reserve model. To date the mineralization remains open both across strike and 1,000 feet below surface."

This phase of the surface exploration program was a continuation of the ongoing exploration program defining near surface mineralization associated with the Amalgamated Break. The exploration area described herein is immediately east of the area outlined in the Company's news release dated June 18, 2013. The program was designed to test for gold mineralization down to 1,000 feet below surface.

The following are some of the highlights of the drilling program:


--  Drill hole AB-13-118 intersected Zone 1 and returned 5.54 opt uncut over
    1.0 foot of core length (0.9 feet true width). This intersection is
    approximately 680 feet below surface and contained visible gold. 
    
--  Drill hole AB-13-33 intersected Zone 1 and returned 0.67 ounces per ton
    (opt) over 5.0 feet of core length (4.2 feet true width). This hole also
    intersected Zone 2 and returned 1.22 opt over 1.0 foot of core length
    (0.8 feet true width). 
    
--  Drill hole AB-13-62 intersected Zone 2 and returned 5.18 opt uncut over
    1.1 feet of core length (1.1 feet true width). This intersection is
    approximately 450 feet below surface and contained visible gold. 
    
--  Current drilling has successfully defined high grade gold mineralization
    on both Zone 1 and Zone 2 (previously discovered and described in the
    Company's new release dated June 18, 2013) down to approximately 800
    feet below surface (See Figures 2 and 3). Previous drilling had only
    seen high grade gold values on these two zones above the 400 foot
    elevation. 
    
--  This phase of drilling has intersected high grade gold values within
    Zone 1 and Zone 2 approximately 500 feet east of the previously defined
    limit.

This drill program was carried out utilizing one drill rig on surface. Drilling activities will continue to focus on defining gold mineralization both east and west of the known limits of all three currently defined zones which are associated with the Amalgamated Break.

The following figures, relating to information in this release, may be viewed at the Company's website at www.klgold.com.


--  Figure 1 - plan view showing the location of the current surface drill
    program. 
--  Figure 2 - long section showing current Zone 1 intercepts. 
--  Figure 3 - long section showing current Zone 2 intercepts. 

The following table summarizes the latest drilling results in imperial values:

SOUTH CLAIMS SURFACE EXPLORATION


----------------------------------------------------------------------------
                                    HOLE                                    
DRILL              FROM     TO       DIP   AZIMUTH            ASSAY         
HOLE No.  ZONE   (feet) (feet) (degrees) (degrees)      (oz per ton/feet)   
----------------------------------------------------------------------------
                                                    5.54/1.0' CL=0.9' TW, VG
                                                      3.50/1.0' CL=0.9' TW, 
                                                             (i)CUT         
          Zone 1  815.7  816.7                        0.02/2.0' CL (TW Not  
AB-13-118 Zone 2  889.3  891.3       -57       329         Calculated)      
----------------------------------------------------------------------------
          Zone 1  407.0  412.0                      0.67/5.0' CL=4.2' TW, VG
          Incl.   410.8  412.0                        1.82/1.2' CL=1.0' TW  
AB-12-33  Zone 2  479.7  480.7       -79       327  1.22/1.0' CL=0.8' TW, VG
----------------------------------------------------------------------------
                                                    0.30/2.5' CL=2.5' TW, VG
                                                    5.18/1.1' CL=1.1' TW, VG
          Zone 1  523.5  526.0                        3.50/1.1' CL=1.1' TW, 
AB-13-62  Zone 2  591.5  592.6       -47       333           (i)CUT         
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-21  Zone 2                     -88       327             NSV          
----------------------------------------------------------------------------
                                                      0.01/1.9' CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-22  Zone 2  495.3  497.2       -79       327             NSV          
----------------------------------------------------------------------------
                                                      0.02/2.7' CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-23  Zone 2  462.1  464.8       -70       327             NSV          
----------------------------------------------------------------------------
                                                      0.08/3.5' CL (TW Not  
                                                           Calculated)      
          Zone 1  493.5  497.0                        0.04/3.0' CL (TW Not  
AB-12-32  Zone 2  590.0  593.0       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.03/3.0' CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-34  Zone 2  397.0  400.0       -70       327             NSV          
----------------------------------------------------------------------------
                                                      0.02/1.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  372.7  373.7                        0.02/1.0' CL (TW Not  
AB-12-35  Zone 2  409.4  410.4       -58       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.02/1.0' CL (TW Not  
AB-12-36  Zone 2  382.0  383.0       -45       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.06/5.5' CL (TW Not  
AB-12-41  Zone 2  672.5  678.0       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.05/4.0' CL (TW Not  
AB-12-42  Zone 2  524.4  528.4       -79       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.10/1.5' CL (TW Not  
                                                           Calculated)      
          Zone 1  437.6  439.1                        0.03/2.4' CL (TW Not  
AB-12-43  Zone 2  472.6  475.0       -70       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.09/1.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  404.3  405.3                        0.11/2.3' CL (TW Not  
AB-12-44  Zone 2  440.9  443.2       -58       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.01/2.0' CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-45  Zone 2  387.2  389.2       -45       327             NSV          
----------------------------------------------------------------------------
                                                      0.07/1.3' CL (TW Not  
                                                           Calculated)      
          Zone 1 1112.4 1113.7                        0.03/1.0' CL (TW Not  
AB-12-74  Zone 2 1170.0 1171.0       -45       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.04/1.0' CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-76  Zone 2  891.7  892.7       -84       327             NSV          
----------------------------------------------------------------------------
          Zone 1  547.2  548.2                        0.21/1.0' CL=1.0' TW  
AB-12-77  Zone 2  583.0  586.0       -55       313    0.19/3.0' CL=2.9' TW  
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-78A Zone 2  652.5  653.5       -65       306    0.15/1.0' CL=0.8' TW  
----------------------------------------------------------------------------
          Zone 1  556.2  557.5                      0.31/1.3' CL=1.3' TW, VG
AB-12-79  Zone 2  606.0  607.0       -45       314    0.47/1.0' CL=1.0' TW  
----------------------------------------------------------------------------
          Zone 1                                      3.22/1.0' CL=1.0' TW  
AB-12-81  Zone 2 1116.0 1117.0       -45       327             NSV          
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-82  Zone 2                     -88       306             NSV          
----------------------------------------------------------------------------
AB-12-83  Zone 1  687.5  689.3       -78       306  0.84/1.8' CL=1.4' TW, VG
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-01  Zone 2                     -52       346             NSV          
----------------------------------------------------------------------------
                                                      0.01/1.1' CL (TW Not  
          Zone 1  539.3  540.4                             Calculated)      
AB-13-03  Zone 2  613.5  615.7       -61       346    0.14/2.2' CL=2.0' TW  
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.07/1.6' CL (TW Not  
AB-13-04  Zone 2  568.2  569.8       -45       346         Calculated)      
----------------------------------------------------------------------------
                                                      0.16/1.0' CL=0.7' TW  
          Zone 1  614.9  615.9                        0.01/8.2' CL (TW Not  
AB-13-11  Zone 2  654.6  662.8       -65       360         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.08/2.0' CL (TW Not  
AB-13-12  Zone 2  630.0  632.0       -55       360         Calculated)      
----------------------------------------------------------------------------
                                                      0.07/1.3' CL (TW Not  
                                                           Calculated)      
          Zone 1  591.9  593.2                        0.01/1.0' CL (TW Not  
AB-13-13  Zone 2  618.8  619.8       -45       360         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-29  Zone 2  355.4  357.6       -88       327    0.64/2.2' CL=1.4' TW  
----------------------------------------------------------------------------
                                                      0.05/5.4' CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-30  Zone 2  196.8  202.2       -65       327             NSV          
----------------------------------------------------------------------------
                                                      0.06/11.8' CL (TW Not 
          Zone 1  145.8  157.6                             Calculated)      
AB-13-31  Zone 2  250.0  253.0       -45       327    0.14/3.0' CL=2.9' TW  
----------------------------------------------------------------------------
                                                      0.02/2.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  214.5  216.5                        0.02/3.0' CL (TW Not  
AB-13-34  Zone 2  285.0  288.0       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.05/3.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  141.3  144.3                        0.10/2.2' CL (TW Not  
AB-13-35  Zone 2  214.9  217.1       -65       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.05/1.5' CL (TW Not  
AB-13-36  Zone 2  164.1  165.6       -45       327         Calculated)      
----------------------------------------------------------------------------
          Zone 1   51.9   52.9                        0.14/1.0' CL=0.8' TW  
AB-13-37  Zone 2  177.2  178.3       -45       327  0.87/1.1' CL=1.1' TW, VG
----------------------------------------------------------------------------
                                                    0.23/2.1' CL=1.9' TW, VG
          Zone 1  568.5  570.6                        0.04/2.0' CL (TW Not  
AB-13-63  Zone 2  639.6  641.6       -56       333         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.07/1.0' CL (TW Not  
AB-13-64  Zone 2  710.8  711.8       -65       337         Calculated)      
----------------------------------------------------------------------------
                                                      0.09/1.0' CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-65A Zone 2  679.0  680.0       -72       337             NSV          
----------------------------------------------------------------------------
                                                    1.39/3.9' CL=3.8' TW, VG
                                                      1.38/3.9' CL=3.8' TW, 
          Zone 1                                             (i)CUT         
           Incl.  857.8  861.7                        3.55/1.0' CL=1.0' TW  
AB-13-119 Zone 2  857.8  858.8       -61       309             NSV          
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.09/7.0' CL (TW Not  
AB-13-120 Zone 2  853.0  860.0       -51       309         Calculated)      
----------------------------------------------------------------------------
                                                      0.01/1.0' CL (TW Not  
          Zone 1  266.2  267.2                             Calculated)      
          Zone 2  295.0  302.6                        0.24/7.6' CL=6.6' TW  
AB-13-126 Incl.   301.6  302.6       -70       327    0.86/1.0' CL=0.9' TW  
----------------------------------------------------------------------------
                                                      0.01/2.0' CL (TW Not  
                                                           Calculated)      
          Zone 1   43.0   45.0                        0.02/3.0' CL (TW Not  
AB-13-127 Zone 2  130.0  133.0       -50       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.01/3.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  202.9  205.9                        0.04/1.2' CL (TW Not  
AB-13-128 Zone 2  262.5  263.7       -64       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.08/1.0' CL (TW Not  
                                                           Calculated)      
AB-13-    Zone 1  686.6  687.6                        0.04/2.0' CL (TW Not  
 140A     Zone 2  719.0  721.0       -56       317         Calculated)      
----------------------------------------------------------------------------
                                                      0.11/1.2' CL (TW Not  
                                                           Calculated)      
          Zone 1  772.3  773.5                        0.06/2.5' CL (TW Not  
AB-13-141 Zone 2  852.1  854.6       -69       329         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.05/1.9' CL (TW Not  
AB-13-142 Zone 2  683.9  685.8       -46       329         Calculated)      
----------------------------------------------------------------------------
                                                      0.23/1.0' CL=0.9' TW  
          Zone 1  664.2  665.2                        0.03/2.9' CL (TW Not  
AB-13-143 Zone 2  710.1  713.0       -56       341         Calculated)      
----------------------------------------------------------------------------
AB-13-    Zone 1                                    1.70/1.0' CL=0.9' TW, VG
 146A     Zone 2  854.0  855.0       -61       324             NSV          
----------------------------------------------------------------------------
                                                      0.03/1.7' CL (TW Not  
                                                           Calculated)      
          Zone 1  785.6  787.3                        0.03/3.3' CL (TW Not  
AB-13-147 Zone 2  822.2  825.5       -50       332         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                      0.23/1.0' CL=0.8' TW  
AB-13-148 Zone 2  911.6  912.6       -65       326             NSV          
----------------------------------------------------------------------------
                                                      0.02/1.0' CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-149 Zone 2  876.8  877.8       -61       327             NSV          
----------------------------------------------------------------------------
                                                      0.07/1.5' CL (TW Not  
                                                           Calculated)      
          Zone 1  822.2  823.7                        0.02/2.2' CL (TW Not  
AB-13-150 Zone 2  889.0  891.2       -50       327         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-163 Zone 2                     -71       326             NSV          
----------------------------------------------------------------------------
          Zone 1  828.6  831.0                        0.21/2.4' CL=2.3' TW  
AB-13-164 Zone 2  920.7  923.1       -65       326  0.59/2.4' CL=2.3' TW, VG
----------------------------------------------------------------------------
                                                      0.18/1.1' CL=1.0' TW  
          Zone 1  835.2  836.3                        0.05/2.1' CL (TW Not  
AB-13-165 Zone 2  902.9  905.0       -65       342         Calculated)      
----------------------------------------------------------------------------
                                                      0.12/1.0' CL (TW Not  
                                                           Calculated)      
          Zone 1  931.2  932.2                        0.03/1.0' CL (TW Not  
AB-13-169 Zone 2  962.2  963.2       -70       342         Calculated)      
----------------------------------------------------------------------------
TW = True Width, CL = Core Length, VG = Visible Gold, NSV=No Significant    
Values, (i)Cut = cut to 3.5 opt                                             
                                                                            
                                                                            
The following table summarizes the latest drilling results in metric values:
                                                                            
                      SOUTH CLAIMS SURFACE EXPLORATION                      
                                                                            
----------------------------------------------------------------------------
                                    HOLE                                    
DRILL              FROM     TO       DIP   AZIMUTH            ASSAY         
HOLE No.  ZONE      (m)    (m) (degrees) (degrees)  (grams per tonne/metres)
----------------------------------------------------------------------------
                                                     189.94/0.3m CL=0.3m TW,
                                                               VG           
                                                     120.00/0.3m CL=0.3m TW,
                                                             (i)CUT         
          Zone 1  248.6  248.9                        0.69/0.6m CL (TW Not  
AB-13-118 Zone 2  271.1  271.7       -57       329         Calculated)      
----------------------------------------------------------------------------
                                                     22.97/1.5m CL=1.3m TW, 
                                                               VG           
          Zone 1  124.1  125.6                        62.40/0.4m CL=0.3m TW 
          Incl.   125.2  125.6                       41.83/0.3m CL=0.2m TW, 
AB-12-33  Zone 2  146.2  146.5       -79       327             VG           
----------------------------------------------------------------------------
                                                     10.29/0.8m CL=0.7m TW, 
                                                               VG           
                                                     177.60/0.3m CL=0.3m TW,
                                                               VG           
          Zone 1  159.6  160.3                       120.00/0.3m CL=0.3m TW,
AB-13-62  Zone 2  180.3  180.6       -47       333           (i)CUT         
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-21  Zone 2                     -88       327             NSV          
----------------------------------------------------------------------------
          Zone 1                                      0.34/0.6m CL=0.6m TW  
AB-12-22  Zone 2  151.0  151.5       -79       327             NSV          
----------------------------------------------------------------------------
                                                      0.69/0.8m CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-23  Zone 2  140.8  141.7       -70       327             NSV          
----------------------------------------------------------------------------
                                                      2.74/1.1m CL (TW Not  
                                                           Calculated)      
          Zone 1  150.4  151.5                        1.37/0.9m CL (TW Not  
AB-12-32  Zone 2  179.8  180.7       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                      1.03/0.9m CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-34  Zone 2  121.0  121.9       -70       327             NSV          
----------------------------------------------------------------------------
                                                      0.69/0.3m CL (TW Not  
                                                           Calculated)      
          Zone 1  113.6  113.9                        0.69/0.3m CL (TW Not  
AB-12-35  Zone 2  124.8  125.1       -58       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      0.69/0.3m CL (TW Not  
AB-12-36  Zone 2  116.4  116.7       -45       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      2.06/1.7m CL (TW Not  
AB-12-41  Zone 2  205.0  206.7       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      1.71/1.2m CL (TW Not  
AB-12-42  Zone 2  159.8  161.1       -79       327         Calculated)      
----------------------------------------------------------------------------
                                                      3.43/0.5m CL (TW Not  
                                                           Calculated)      
          Zone 1  133.4  133.8                        1.03/0.7m CL (TW Not  
AB-12-43  Zone 2  144.0  144.8       -70       327         Calculated)      
----------------------------------------------------------------------------
                                                      3.09/0.3m CL (TW Not  
                                                           Calculated)      
          Zone 1  123.2  123.5                        3.77/0.7m CL (TW Not  
AB-12-44  Zone 2  134.4  135.1       -58       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.34/0.6m CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-45  Zone 2  118.0  118.6       -45       327             NSV          
----------------------------------------------------------------------------
                                                      2.40/0.4m CL (TW Not  
                                                           Calculated)      
          Zone 1  339.1  339.5                        1.03/0.3m CL (TW Not  
AB-12-74  Zone 2  356.6  356.9       -45       327         Calculated)      
----------------------------------------------------------------------------
                                                      1.47/0.3m CL (TW Not  
          Zone 1                                           Calculated)      
AB-12-76  Zone 2  271.8  272.1       -84       327             NSV          
----------------------------------------------------------------------------
          Zone 1  166.8  167.1                        7.20/0.3m CL=0.3m TW  
AB-12-77  Zone 2  177.7  178.6       -55       313    6.51/0.9m CL=0.9m TW  
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-78A Zone 2  198.9  199.2       -65       306    5.14/0.3m CL=0.2m TW  
----------------------------------------------------------------------------
                                                     10.63/0.4m CL=0.4m TW, 
          Zone 1  169.5  169.9                                 VG           
AB-12-79  Zone 2  184.7  185.0       -45       314    16.11/0.3m CL=0.3m TW 
----------------------------------------------------------------------------
          Zone 1                                     110.40/0.3m CL=0.3m TW 
AB-12-81  Zone 2  340.2  340.5       -45       327             NSV          
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-12-82  Zone 2                     -88       306             NSV          
----------------------------------------------------------------------------
                                                     28.80/0.5m CL=0.4m TW, 
AB-12-83  Zone 1  209.6  210.1       -78       306             VG           
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-01  Zone 2                     -52       346             NSV          
----------------------------------------------------------------------------
                                                      0.34/0.3m CL (TW Not  
          Zone 1  164.4  164.7                             Calculated)      
AB-13-03  Zone 2  187.0  187.7       -61       346    4.80/0.7m CL=0.6m TW  
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      2.40/0.5m CL (TW Not  
AB-13-04  Zone 2  173.2  173.7       -45       346         Calculated)      
----------------------------------------------------------------------------
                                                      5.49/0.3m CL=0.2m TW  
          Zone 1  187.4  187.7                        0.34/2.5m CL (TW Not  
AB-13-11  Zone 2  199.5  202.0       -65       360         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      2.74/0.6m CL (TW Not  
AB-13-12  Zone 2  192.0  192.6       -55       360         Calculated)      
----------------------------------------------------------------------------
                                                      2.40/0.4m CL (TW Not  
                                                           Calculated)      
          Zone 1  180.4  180.8                        0.43/0.3m CL (TW Not  
AB-13-13  Zone 2  188.6  188.9       -45       360         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-29  Zone 2  108.3  109.0       -88       327    21.94/0.7m CL=0.4m TW 
----------------------------------------------------------------------------
                                                      1.71/1.6m CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-30  Zone 2   60.0   61.6       -65       327             NSV          
----------------------------------------------------------------------------
                                                      2.06/3.6m CL (TW Not  
          Zone 1   44.4   48.0                             Calculated)      
AB-13-31  Zone 2   76.2   77.1       -45       327    4.80/0.9m CL=0.9m TW  
----------------------------------------------------------------------------
                                                      0.69/0.6m CL (TW Not  
                                                           Calculated)      
          Zone 1   65.4   66.0                        0.69/0.9m CL (TW Not  
AB-13-34  Zone 2   86.9   87.8       -88       327         Calculated)      
----------------------------------------------------------------------------
                                                      1.71/0.9m CL (TW Not  
                                                           Calculated)      
          Zone 1   43.1   44.0                        3.43/0.7m CL (TW Not  
AB-13-35  Zone 2   65.5   66.2       -65       327         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      1.71/0.5m CL (TW Not  
AB-13-36  Zone 2   50.0   50.5       -45       327         Calculated)      
----------------------------------------------------------------------------
                                                      4.80/0.3m CL=0.3m TW  
          Zone 1   15.8   16.1                       29.83/0.3m CL=0.3m TW, 
AB-13-37  Zone 2   54.0   54.3       -45       327             VG           
----------------------------------------------------------------------------
                                                    7.89/0.6m CL=0.6m TW, VG
          Zone 1  173.3  173.9                        1.37/0.6m CL (TW Not  
AB-13-63  Zone 2  195.0  195.6       -56       333         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      2.40/0.3m CL (TW Not  
AB-13-64  Zone 2  216.7  217.0       -65       337         Calculated)      
----------------------------------------------------------------------------
                                                      3.09/0.3m CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-65A Zone 2  207.0  207.3       -72       337             NSV          
----------------------------------------------------------------------------
                                                     47.66/1.2m CL=1.2m TW, 
                                                               VG           
                                                      5.90/1.2m CL=1.2m TW, 
          Zone 1                                             (i)CUT         
           Incl.  261.5  262.6                       121.78/0.3m CL=0.3m TW 
AB-13-119 Zone 2  261.5  261.8       -61       309             NSV          
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      3.09/2.1m CL (TW Not  
AB-13-120 Zone 2  260.0  262.1       -51       309         Calculated)      
----------------------------------------------------------------------------
                                                      0.34/0.3m CL (TW Not  
          Zone 1   81.1   81.4                             Calculated)      
          Zone 2   89.9   92.2                        8.23/2.3m CL=2.0m TW  
AB-13-126 Incl.    91.9   92.2       -70       327    29.49/0.3m CL=0.3m TW 
----------------------------------------------------------------------------
                                                      0.34/0.6m CL (TW Not  
                                                           Calculated)      
          Zone 1   13.1   13.7                        0.69/0.9m CL (TW Not  
AB-13-127 Zone 2   39.6   40.5       -50       327         Calculated)      
----------------------------------------------------------------------------
                                                      0.34/0.9m CL (TW Not  
                                                           Calculated)      
          Zone 1   61.8   62.8                        1.37/0.4m CL (TW Not  
AB-13-128 Zone 2   80.0   80.4       -64       327         Calculated)      
----------------------------------------------------------------------------
                                                      2.74/0.3m CL (TW Not  
                                                           Calculated)      
AB-13-    Zone 1  209.3  209.6                        1.37/0.6m CL (TW Not  
 140A     Zone 2  219.2  219.8       -56       317         Calculated)      
----------------------------------------------------------------------------
                                                      3.77/0.4m CL (TW Not  
                                                           Calculated)      
          Zone 1  235.4  235.8                        2.06/0.8m CL (TW Not  
AB-13-141 Zone 2  259.7  260.5       -69       329         Calculated)      
----------------------------------------------------------------------------
                                                               NSV          
          Zone 1                                      1.71/0.5m CL (TW Not  
AB-13-142 Zone 2  208.5  209.0       -46       329         Calculated)      
----------------------------------------------------------------------------
                                                      7.89/0.3m CL=0.3m TW  
          Zone 1  202.4  202.8                        1.03/0.9m CL (TW Not  
AB-13-143 Zone 2  216.4  217.3       -56       341         Calculated)      
----------------------------------------------------------------------------
                                                     58.29/0.3m CL=0.3m TW, 
AB-13-    Zone 1                                               VG           
 146A     Zone 2  260.3  260.6       -61       324             NSV          
----------------------------------------------------------------------------
                                                      1.03/0.5m CL (TW Not  
                                                           Calculated)      
          Zone 1  239.5  240.0                        1.03/1.0m CL (TW Not  
AB-13-147 Zone 2  250.6  251.6       -50       332         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                      7.89/0.3m CL=0.2m TW  
AB-13-148 Zone 2  277.9  278.2       -65       326             NSV          
----------------------------------------------------------------------------
                                                      0.69/0.3m CL (TW Not  
          Zone 1                                           Calculated)      
AB-13-149 Zone 2  267.2  267.6       -61       327             NSV          
----------------------------------------------------------------------------
                                                      2.40/0.5m CL (TW Not  
                                                           Calculated)      
          Zone 1  250.6  251.1                        0.69/0.7m CL (TW Not  
AB-13-150 Zone 2  271.0  271.6       -50       327         Calculated)      
----------------------------------------------------------------------------
          Zone 1                                               NSV          
AB-13-163 Zone 2                     -71       326             NSV          
----------------------------------------------------------------------------
                                                      7.20/0.7m CL=0.7m TW  
          Zone 1  252.6  253.3                       20.23/0.7m CL=0.7m TW, 
AB-13-164 Zone 2  280.6  281.4       -65       326             VG           
----------------------------------------------------------------------------
                                                      6.17/0.3m CL=0.3m TW  
          Zone 1  254.6  254.9                        1.71/0.6m CL (TW Not  
AB-13-165 Zone 2  275.2  275.8       -65       342         Calculated)      
----------------------------------------------------------------------------
                                                      4.11/0.3m CL (TW Not  
                                                           Calculated)      
          Zone 1  283.8  284.1                        1.03/0.3m CL (TW Not  
AB-13-169 Zone 2  293.3  293.6       -70       342         Calculated)      
----------------------------------------------------------------------------
TW = True Width, CL = Core Length, VG = Visible Gold, NSV=No Significant    
Values, (i)Cut = cut to 120.0 grams/tonne                                   

About the Company

Kirkland Lake Gold Inc.'s corporate goal is to create a self-sustaining and long lived intermediate gold mining company based in the historic Kirkland Lake Gold Camp. The Company plans to do this by mining to the reserve grade, generating profits and free cash flow for the shareholders. The Company will also look to take advantage of its increased infrastructure capacity in the appropriate gold price environment. At the same time, the Company is committed to maintaining a significant exploration program aimed at developing and maintaining a property wide reserve and resource base sufficient to sustain a mine life of more than ten years.

Over the last several years the Company has invested significant capital to improve the infrastructure of the business including upgrading the production hoist, skips, mill, underground mobile equipment and capital development.

From initial discovery to present day there have been over 24 million ounces of gold mined from the Kirkland Lake camp while the current reserve and resource provides for potentially 10 years of mining with significant exploration upside.

The results of the Company's underground diamond drilling program have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff (which includes a 'qualified person', Stewart Carmichael P.Geo., the Company's Chief Exploration Geologist, for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators). Mr. Carmichael also supervised the preparation of the information that forms the basis of the technical disclosure in this release.

The Company has implemented a quality assurance and control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the best possible practices. The drill core is sawn in half with one half of the core samples shipped to Swastika Laboratories in Swastika, Ontario. The other half of the core is retained for future assay verification. Other QA/QC includes the insertion of blanks, and the regular re-assaying of pulps and rejects at alternate certified labs. Gold analysis is conducted by fire assay using atomic absorption or gravimetric finish. The laboratory re-assays at least 10% of all samples and additional checks may be run on anomalous values.

The Company's Macassa Mine Property is the subject of a reserve report prepared by Glenn R. Clark, P.Eng. entitled Review of Resources and Reserves of Macassa Mine, Kirkland Lake, Ontario at January 1, 2013 dated June 24, 2013, which has been filed on SEDAR (www.sedar.com) under the Company's filings.

Neither the Toronto Stock Exchange nor the AIM Market of the London Stock Exchange has reviewed and neither accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Statements

This Press Release contains statements which constitute "forward-looking statements", including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to the future business activities and operating performance of the Company. The words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions, as they relate to the Company, are intended to identify such forward-looking statements. Forward-looking statements used in this Press Release include, but may not be limited to, statements regarding the acceptance of the Rights Plan by the TSX and the timing thereof, the approval of the Rights Plan by shareholders of the Company, the Company's production capacity and its exploration program. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made such as, without limitation, opinion, assumptions and estimates of management regarding the Company's business, its ability to complete the strategic and mine plan review and its ability to increase its production capacity and decrease its production cost. Such opinions, assumptions and estimates, are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.

These factors include the outcome of the strategic review process the Board has implemented, the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), possible variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's corporate mineral resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, risks related to joint venture operations, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance, as well as those risk factors discussed or referred to in the Company's annual Management's Discussion and Analysis and Annual Information Form for the year ended April 30, 2013 and the Company's Management's Discussion and Analysis for the interim period ended October 31, 2013 filed with the securities regulatory authorities in certain provinces of Canada and available at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.

To view the figures associated with this press release, please visit the following link: http://media3.marketwire.com/docs/KGI_FIGURES_1-3.pdf.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo in Silicon Valley. Learn what is going on, contribute to the discussions, and ensure that your enterprise is as "IoT-Ready" as it can be! Internet of @ThingsExpo, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading in...
IBM has acquired Blue Box Group, Inc., a managed private cloud provider built on OpenStack. Customers benefit from the ability to more easily deploy workloads across hybrid cloud environments. Financial details were not disclosed. Enterprises are seeking ways to embrace all types of cloud to address a wide range of workloads. Today's announcement reinforces IBM's commitment to deliver flexible cloud computing models that make it easier for customers to move to data and applications across cloud...
The WebRTC Meetup, where WebRTC enthusiasts exchange ideas, is being held on Wednesday, June 10, from 7 pm – 9 pm at the 4th WebRTC Summit, June 9-11, 2015, at the Javits Center in New York City, NY. The WebRTC Meetup is being hosted by the New York WebRTC Developer Group. WebRTC is the future of browser-to-browser communications, and continues to make inroads into the traditional, difficult, plug-in web communications world. The 4th WebRTC Summit continues our tradition of delivering the late...
"Desktop as a Service is emerging as a very big trend. One of the big influencers of this – for Esri – is that we have a large user base that uses virtualization and they are looking at Desktop as a Service right now," explained John Meza, Product Engineer at Esri, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The only place to be Nov 3-5 is Cloud Expo | @ThingsExpo | DevOps Summit 2015 West at the Santa Clara Convention Center in Santa Clara, CA. Join us there as delegates from all over the world come to listen to and engage with speakers & sponsors from the leading Cloud Computing, IoT, Big Data and DevOps companies. Cloud Expo & @ThingsExpo are the leading events covering the booming market of Cloud Computing, IoT & Big Data for the enterprise. Speakers from all over the world will be hand-picked...
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Health care systems across the globe are under enormous strain, as facilities reach capacity and costs continue to rise. M2M and the Internet of Things have the potential to transform the industry through connected health solutions that can make care more efficient while reducing costs. In fact, Vodafone's annual M2M Barometer Report forecasts M2M applications rising to 57 percent in health care and life sciences by 2016. Lively is one of Vodafone's health care partners, whose solutions enable o...
"People are a lot more knowledgeable about APIs now. There are two types of people who work with APIs - IT people who want to use APIs for something internal and the product managers who want to do something outside APIs for people to connect to them," explained Roberto Medrano, Executive Vice President at SOA Software, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
ProfitBricks has an early preview of its new Docker hosting platform. The ProfitBricks Docker platform enables its customers to build fully-portable applications within the ProfitBricks cloud. Unlike other Docker platforms, ProfitBricks’ Docker provides developers and system administrators with a platform with dedicated resources that autoscales the Docker hosts. Early access customers will be able to utilize up to 2,500 CPU core hours as part of ProfitBricks’ early access Docker preview.
"SAP had made a big transition into the cloud as we believe it has significant value for our customers, drives innovation and is easy to consume. When you look at the SAP portfolio, SAP HANA is the underlying platform and it powers all of our platforms and all of our analytics," explained Thorsten Leiduck, VP ISVs & Digital Commerce at SAP, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
“The year of the cloud – we have no idea when it's really happening but we think it's happening now. For those technology providers like Zentera that are helping enterprises move to the cloud - it's been fun to watch," noted Mike Loftus, VP Product Management and Marketing at Zentera Systems, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
"Blue Box has been around for 10-11 years, and last year we launched Blue Box Cloud. We like the term 'Private Cloud as a Service' because we think that embodies what we are launching as a product - it's a managed hosted private cloud," explained Giles Frith, Vice President of Customer Operations at Blue Box, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
It’s no news that microservices are one of the top trends, if not the top trend, in application architectures today. Take large monolithic applications which are brittle and difficult to change and break them into smaller manageable pieces to provide flexibility in deployment models, facilitating agile release and development to meet today’s rapidly shifting digital businesses. Unfortunately, with this change, application and infrastructure management is more complex due to size and technology c...
We’re entering a new era of computing technology that many are calling the Internet of Things (IoT). Machine to machine, machine to infrastructure, machine to environment, the Internet of Everything, the Internet of Intelligent Things, intelligent systems – call it what you want, but it’s happening, and its potential is huge. IoT is comprised of smart machines interacting and communicating with other machines, objects, environments and infrastructures. As a result, huge volumes of data are bein...
In his General Session at 16th Cloud Expo, David Shacochis, host of The Hybrid IT Files podcast and Vice President at CenturyLink, will investigate three key trends of the “gigabit economy" though the story of a Fortune 500 communications company in transformation. Narrating how multi-modal hybrid IT, service automation, and agile delivery all intersect, he will cover the role of storytelling and empathy in achieving strategic alignment between the enterprise and its information technology.