IC Potash Announces Filing of Feasibility Study for the Ochoa Sulphate of Potash Project

TORONTO, ON--(Marketwired - March 10, 2014) - IC Potash Corp. (TSX: ICP) (OTCQX: ICPTF) ("ICP" or the "Company") is pleased to announce the filing of the "NI 43-101 Technical Report, Ochoa Project Feasibility Study, Lea County, New Mexico, USA" (the "Report") on SEDAR (www.sedar.com). The Report is also filed on the Company website (www.icpotash.com). The date of the Report is March 7, 2014, with an effective date of January 9, 2014. It was prepared by Qualified Persons from Agapito Associates Inc. and SNC-Lavalin Inc. All dollar amounts in this press release are U.S. dollars and all tons are short tons.

The Report includes a summary of the Ochoa Project (the "Project"), including geology and mineralization, exploration and drilling, resources and reserves, mining methods, mineral processing and metallurgical testing, infrastructure, hydrology, environmental permitting, marketing, capital costs, operating costs, project economics, and conclusions and recommendations.

The Report recommends that ICP immediately seek funding for bridge engineering while also seeking full funding of the Ochoa Project. The Report also recommends that the Company move to implementation by commencing engineering, procurement, and construction management ("EPCM") activities and completing the environmental permitting.

Mr. Sidney Himmel, CEO of ICP, stated: "The completion and filing of this report, and the recommendations of its authors, allows the Company to progress to obtain financing and project partners to advance towards construction and production."

Highlights from the Report include:

  • The financial model covers approximately three years of construction and commissioning beginning in Q2 2014 and continuing through Q2 2017, followed by 50 years of operation. Sulphate of Potash ("SOP") production in 2017 is estimated at 48% of annual capacity, with full capacity expected in 2018.
  • The Company remains on schedule to receive a record of decision on its environmental impact statement in Q2 2014, which will allow construction to commence as planned.
  • The ore bed will be accessed via a 25-foot diameter, two compartment mine ventilation and service shaft, and a 12,000-foot long slope.
  • Room-and-pillar mining and dual split super section mining methods are expected to be used to extract ore from the deposit at a nominal rate of 3.7 million tons per year.
  • The plant is designed to operate 7,912 hours annually and employ approximately 400 people at full production.
  • The Company has full right to appropriate non-potable water from the Capitan Reef aquifer for mining and industrial use.
  • Average K2O process recovery is estimated to be 82%.
  • Steady-state annual production at full capacity is expected to be 714,400 tons of SOP. The product mix is projected to be 229,400 tons of standard SOP, 385,000 tons of granular SOP, and 100,000 tons of soluble SOP.
  • Steady-state operating production cost is estimated to be $195 per ton of SOP.
  • The capital cost of the Project is estimated to be $1,018 million, with an accuracy of +/-15%.
  • The after-tax Net Present Value ("NPV") is US$612 million using an after tax discount rate of 10% and no debt. The after-tax internal rate of return is 16%. The after-tax NPV is US$1.019 billion, using an after-tax discount rate of 8% and no debt.
  • Payback period from the commencement of production is expected to be 5.4 years after tax.

The Report identifies Measured and Indicated Resources of 1,017.8 million tons at an average grade of 83.9% by weight polyhalite. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources are summarized in the table below:

Ochoa Project Mineral Resources, (effective date May 31, 2013)

                                                                            
============================================================================
                               Average     Resource   In-Place              
                              Thickness      Area    Tons(1,2,3)  Polyhalite
                                 (ft)      (acres)    (millions)    (wt %)  
----------------------------------------------------------------------------
                                                                            
MEASURED(4)                      5.2        26,166         511.7     84.5   
INDICATED(5)                     5.0        26,698         506.0     83.3   
----------------------------------------------------------------------------
TOTAL M&I                        5.1        52,865       1,017.8     83.9   
INFERRED(6)                      4.8        15,634         284.0     82.6   
----------------------------------------------------------------------------
                                                                            
                                                                            
============================================================================
                              Equivalent                                    
                                K2SO4     Anhydrite     Halite    Magnesite 
                                (wt %)      (wt %)      (wt %)      (wt %)  
----------------------------------------------------------------------------
                                                                            
MEASURED(4)                      24.4        4.02        3.27        7.94   
INDICATED(5)                     24.1        4.00        3.30        8.61   
----------------------------------------------------------------------------
TOTAL M&I                        24.2        4.01        3.28        8.27   
INFERRED(6)                      23.9        4.11        3.37        8.82   
----------------------------------------------------------------------------
                                                                            
(1) Average in-situ bulk density of 173.5 pounds per cubic foot (pcf).      
(2) Bed thickness cutoff 4.0 ft, composite grade cutoff 65.0% polyhalite,   
excludes out-of-seam dilution.                                              
(3) Mineral Resource includes Mineral Reserves.                             
(4) Measured Resource located within 0.75-mile radius from an exploration   
core hole.                                                                  
(5) Indicated Resource located between 0.75-mile and 1.5-mile radius from an
exploration core hole.                                                      
(6) Inferred Resource located between 1.5-mile and 3.0-mile radius from an  
exploration core hole.                                                      
Note: Gypsum weight percent negligible for all resource classifications.    
============================================================================
                                                                            

The Company released the details of a feasibility study on January 23, 2014. The Report outlines a detailed 50-year mine plan as well as calculated Proven and Probable Mineral Reserves based on the Project's Measured and Indicated Mineral Resources. Contained within the mine plan are approximately 182.4 million tons of Proven and Probable Reserves grading 78.05% by weight polyhalite. Measured and Indicated mineral resources become Proven and Probable Mineral Reserves once it has been determined that the resources are economic for extraction. These Reserves are shown below:

Ochoa Project Mineral Reserves, (effective date January 9, 2014)

============================================================================
                              50 Year                                       
                 Average    Mine Plan                                       
                  Mined     Mined Area  ROM Mined      Mining               
              Thickness(1)   (million   Tons (2,3)   Recovery(4)  Polyhalite
                  (ft)       ft(2) )   (millions)       (%)        (wt %)   
----------------------------------------------------------------------------
                                                                            
PROVEN             5.9          246       125.0         47.1%       78.42   
PROBABLE           5.9          113        57.4         64.8%       77.20   
----------------------------------------------------------------------------
TOTAL P&P         5.9          359        182.4        51.5%        78.05   
----------------------------------------------------------------------------
================================================================
              Equivalent                                        
                K2S04       Anhydrite     Halite      Magnesite 
                (wt %)       (wt %)       (wt %)       (wt %)   
----------------------------------------------------------------
                                                                
PROVEN           22.66        11.29        3.66         7.79    
PROBABLE         22.31        11.60        3.65         8.30    
----------------------------------------------------------------
TOTAL P&P       22.55        11.39         3.66         8.08    
----------------------------------------------------------------
(1) Bed thickness cutoff 4.0 ft, composite grade cutoff 66.0% polyhalite,   
includes out-of-seam dilution.                                              
(2) Average in-situ bulk density of 173.5 pcf.                              
(3) No inferred tons mined                                                  
(4) Areal recovery (mined area) inside 50 Year Mine Plan boundary           
Note: Gypsum weight percent negligible for all resource classifications.    
Mineral Reserves are included in Mineral Resources                          
============================================================================
                                                                            

Measured and Indicated Mineral Resources exist to the north, east, and west of the 50-year mine plan boundary and there is a reasonable expectation that those resources will be economically mineable, which would allow for an extension of mining operations beyond 50 years.

Qualified Persons Report:

All scientific and technical disclosures in this press release have been prepared under the supervision of and approved by Deepak Malhotra, Ph.D. and registered SME member, president of Resource Development Inc., a Qualified Person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and an advisor to the Company.

The Report authors are Gary Skaggs, P.E., P.Eng.; Leo Gilbride, P.E.; Tom Vandergrift, P.E.; Susan Patton, Ph.D., P.E.; Vanessa Santos, PG; Lawrence Berthelet, P.Eng., MBA; and Jack Nagy, P. Eng., each an independent Qualified Person within the meaning of NI 43-101.

About IC Potash Corp.

ICP has demonstrated a low-cost method to produce Sulphate of Potash ("SOP") from its 100%-owned Ochoa polyhalite deposit in southeast New Mexico. The Company intends to become a primary, long-term producer of SOP. The global market for SOP is 5.5 million tons per year, with producers benefiting from substantial price premiums over regular potash, known as muriate of potash. SOP is a non-chloride potash fertilizer widely used in the horticultural industry and for high value crops, such as fruits, vegetables, tobacco and potatoes. It is applicable for soils where there are substantial agricultural activity, high soil salinity, and in arid regions. The Ochoa Project has access to excellent local labor resources, low-cost electricity and natural gas, water, rail lines, and the Port of Galveston, Texas. ICP's land holdings consist of nearly 90,000 acres of federal subsurface potassium prospecting permits and State of New Mexico potassium mining leases. For more information, please visit www.icpotash.com.

Forward-Looking Statements

Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties and other factors which may cause the actual results, performance or achievements of ICP to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements include statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking statements include, without limitation, reserve estimates, ICP's expected position as one of the lowest cost producers of SOP in the world, the timing of receipt and publication of ICP's environmental permits, the sufficiency of ICP's cash balances, the timing of production, and other statements that are not historical facts. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of ICP, including, but not limited to, risks associated with mineral exploration and mining activities, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, the uncertainty of obtaining additional financing, and risks associated with turning reserves into product. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
In her General Session at 15th Cloud Expo, Anne Plese, Senior Consultant, Cloud Product Marketing, at Verizon Enterprise, focused on finding the right mix of renting vs. buying Oracle capacity to scale to meet business demands, and offer validated Oracle database TCO models for Oracle development and testing environments. Anne Plese is a marketing and technology enthusiast/realist with over 19+ years in high tech. At Verizon Enterprise, she focuses on driving growth for the Verizon Cloud platfo...
Lori MacVittie is responsible for education and evangelism of application services available across F5's entire product suite. Her role includes authorship of technical materials and participation in a number of community-based forums and industry standards organizations, among other efforts. MacVittie has extensive programming experience as an application architect, as well as network and systems development and administration expertise. Prior to joining F5, MacVittie was an award-winning Senio...
15th Cloud Expo, which took place Nov. 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA, expanded the conference content of @ThingsExpo, Big Data Expo, and DevOps Summit to include two developer events. IBM held a Bluemix Developer Playground on November 5 and ElasticBox held a Hackathon on November 6. Both events took place on the expo floor. The Bluemix Developer Playground, for developers of all levels, highlighted the ease of use of Bluemix, its services and functionalit...
SYS-CON Media announced today that Skytap blog on "DevOps Journal" exceeded 84,000 story reads. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Noel Wurst is the managing content editor at Skytap. Skytap provides SaaS-based dev/test environments to the enterprise. Skytap solution removes the inefficiencies and constraints that comp...
SYS-CON Events announced today that Gridstore™, the leader in hyper-converged infrastructure purpose-built to optimize Microsoft workloads, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Gridstore™ is the leader in hyper-converged infrastructure purpose-built for Microsoft workloads and designed to accelerate applications in virtualized environments. Gridstore’s hyper-converged infrastructure is the ...
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to th...
"There is a natural synchronization between the business models, the IoT is there to support ,” explained Brendan O'Brien, Co-founder and Chief Architect of Aria Systems, in this SYS-CON.tv interview at the 15th International Cloud Expo®, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
The Internet of Things will greatly expand the opportunities for data collection and new business models driven off of that data. In her session at @ThingsExpo, Esmeralda Swartz, CMO of MetraTech, discussed how for this to be effective you not only need to have infrastructure and operational models capable of utilizing this new phenomenon, but increasingly service providers will need to convince a skeptical public to participate. Get ready to show them the money!
How do APIs and IoT relate? The answer is not as simple as merely adding an API on top of a dumb device, but rather about understanding the architectural patterns for implementing an IoT fabric. There are typically two or three trends: Exposing the device to a management framework Exposing that management framework to a business centric logic Exposing that business layer and data to end users. This last trend is the IoT stack, which involves a new shift in the separation of what stuff happe...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
"ElasticBox is an enterprise company that makes it very easy for developers and IT ops to collaborate to develop, build and deploy applications on any cloud - private, public or hybrid," stated Monish Sharma, VP of Customer Success at ElasticBox, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The definition of IoT is not new, in fact it’s been around for over a decade. What has changed is the public's awareness that the technology we use on a daily basis has caught up on the vision of an always on, always connected world. If you look into the details of what comprises the IoT, you’ll see that it includes everything from cloud computing, Big Data analytics, “Things,” Web communication, applications, network, storage, etc. It is essentially including everything connected online from ha...
An entirely new security model is needed for the Internet of Things, or is it? Can we save some old and tested controls for this new and different environment? In his session at @ThingsExpo, New York's at the Javits Center, Davi Ottenheimer, EMC Senior Director of Trust, reviewed hands-on lessons with IoT devices and reveal a new risk balance you might not expect. Davi Ottenheimer, EMC Senior Director of Trust, has more than nineteen years' experience managing global security operations and asse...