SYS-CON MEDIA Authors: Carmen Gonzalez, Dana Gardner, Elizabeth White, Yeshim Deniz, Peter Silva

News Feed Item

Prospero Receives San Luis del Cordero Project Back from Silver Standard After 5,135m of Diamond Drilling

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 03/14/14 -- Prospero Silver Corp. (TSX VENTURE:PSL) ("Prospero" or the "Company") announces that Silver Standard Resources Inc. ("Silver Standard") has decided not to proceed to the second year of drilling/evaluation pursuant to an option to joint venture agreement entered into in March 2013. Silver Standard completed a 15-hole 5,135 meter diamond drill program the results of which were provided in a news release dated March 3, 2014.

Before drilling, Silver Standard completed an IP survey and rock geochemistry over the project in Q3 2013. This survey identified three new areas of geophysical interest in the eastern La Puerta and India Bonita target zones. The diamond drilling program mounted in Q4 2013 and Q1 2014 was directed at these new targets as well as testing previously drilled areas which had carried encouraging results.

The targets, which had previous work, include:


--  The extension to depth of the old Santa Rosa mine of the approx. 600g/t
    silver found in earlier drilling; 
--  The extension to the northwest of the Santa Rosa trend; 
--  A deep chargeability anomaly under the limestone plateau located in the
    western zone, and 
--  The extension to the east of the Santa Rosa East skarn zone.  

Tawn Albinson, Prospero's Mexico City based President/CEO, said, "In discussions with the Silver Standard team at PDAC they noted that their goal was to identify the potential for 100 million ounces of silver. Evidently review of all the data has led them to conclude this first phase of drilling did not meet that expectation."

The drilling results from the 15-hole program are found below and shown on the attached surface map of the central portion of the San Luis del Cordero project.

Albinson notes, "Silver Standard was not encouraged to pursue further the high grade material in the Santa Rosa vein because of low tonnage potential. The focus ended up on the skarns in the Santa Rosa East skarn and a continuation of this contact." He added, "Cordero has seen an aggregate of 10,400 metres of drilling since 2007 which could allow calculation of a preliminary resource using an external Qualified Person. While the results Silver Standard turned up did not support the size potential they seek, Prospero firmly believes a still sizeable amount of ounces can be defined in the lower grade areas of the skarns and potentially a small standalone operation in the higher grade Santa Rosa area- or a combination of the two."

Prospero will continue to seek JV partners for Cordero for the silver potential and, in addition, explore further the deeper copper potential, which has been identified by other potential JV partners.

Discussion of results

The Santa Rosa vein and the Santa Rosa East skarn zones dip steeply to the south towards the shoulder of the intrusive body, which appears, in general, to dip to the north. The deeper holes drilled under the Santa Rosa vein (hole SSLC-13-20 and SSLC-14-31), and the Santa Rosa East skarn (hole SSLC-14-32) encountered mostly intrusive phases and multiple dikes that are related to a complex intrusive/sediment contact zone. The deeper holes encountered some weakly mineralized quartz and calcite veins, which are likely a late vein-forming event. The position of the deeper feeder zones of the Santa Rosa vein and the blind-to-surface Santa Rosa East skarn remain uncertain, and could be controlled by the north dipping intrusive/sediment contact zone. In this case it would be necessary to test the as yet unexplored deeper extension of this contact zone with drill holes directed from north to south rather than from south to north (which is the direction in which most holes have been drilled to date).

Hole SSLC-13-28 was drilled under alluvium covered ground to the north of La Puerta zone to investigate an IP anomaly. This hole encountered multiple quartz porphyry dikes and skarn and quartz veins with an intersection 24 meters in length with a grade of 20 g/t Ag 0.29% Cu, and 0.92% Zn. It indicates the porphyritic dikes and skarn mineralization persist further north than previously mapped at the surface.

Hole SSLC-13-30 was drilled towards the south to test the large La Puerta skarn (700 meters long, 130 meters wide) and also encountered quartz porphyry dikes and vein zones with significant silver values (62 to 72 g/t Ag). The skarn was not reached indicating it dips stepper than anticipated. Drill holes positioned closer to the skarn will be required to test La Puerta target at depth.

Most of the known mineralization in the San Luis Cordero project occurs along a horseshoe shaped zone that wraps around a sizable intrusive body 2.5 km long and approx. 1.5 km wide. Drilling to date has focused on the 2.5 km long northern border of the intrusive. The full length (1.5 kms) of the south-eastern flank of the intrusive body (from the Canal Zone in the SW to the La Puerta skarn to the NE) remains unexplored (see attached diagram) and has the potential to host Santa Rosa East skarn type ore bodies in the closer to surface environment, as well as for deeper skarn and/or porphyry style mineralization. Highly differentiated intrusive phases, including a broad swarm of quartz feldspar porphyry dikes and both prograde and retrograde stages of primarily silver-copper mineralization occurring close to the intrusive/sediment contact zone, all indicate a favorable environment to identify new mineralized zones.

Prospero drilled PSLC-17 in 2011 in the zinc rich "Canal zone". The intersection was 4.29 meters of 11.5% Zn, 96 g/t Ag and 0.4% Cu and no holes were drilled in this recent program. As noted above, all subsequent drill efforts focused on the northern border of the intrusive body.

The geologic level of the San Luis del Cordero porphyritic intrusives, skarns and veins remains high when compared to copper-rich skarn/porphyry deposits in Mexico. Exploration for potential deeper and more sizable copper-dominant mineralization will require deeper focused drilling.


----------------------------------------------------------------------------
                                                                            
                                             WIDTH                          
DDH        VEIN TARGET       FROM      TO (mts)(i) Ag g/t        Cu %   Zn %
----------------------------------------------------------------------------
SSLC-13-20 Sta. Rosa vein  270.90  273.35     2.45     No significant values
----------------------------------------------------------------------------
           Sta. Rosa E                                                      
SSLC-13-21  skarn          137.45  157.15    19.70  142.4        0.68   1.09
----------------------------------------------------------------------------
including                  141.00  144.05     3.05  386.0        0.53   1.39
----------------------------------------------------------------------------
SSLC-13-22 Sta. Rosa vein  172.35  177.95     5.60  196.4        0.16   0.36
----------------------------------------------------------------------------
including                  172.35  173.85     1.50  433.0        0.32   0.56
----------------------------------------------------------------------------
SSLC-13-23 Sta. Rosa vein  138.90  141.00     2.10  544.0        1.02   6.57
----------------------------------------------------------------------------
including                  139.90  141.00     1.10  834.0        1.74  10.45
----------------------------------------------------------------------------
           Santa Rosa                                                       
SSLC-13-24  vein?           11.08   12.10     1.02  115.0        0.14   0.98
----------------------------------------------------------------------------
           Sta. Rosa E                                                      
SSLC-14-33  skarn          196.55  198.45     1.90  275.0        1.44   1.15
----------------------------------------------------------------------------
including                  197.05  197.65     0.60  843.0        4.16   1.51
----------------------------------------------------------------------------
and        Skarn           144.32  147.45     3.13   23.9        0.45   1.16
----------------------------------------------------------------------------
           Sta. Rosa E                                                      
SSLC-14-34  skarn          137.30  139.70     2.40  185.0        2.09   1.82
----------------------------------------------------------------------------
including                  137.30  137.85     0.55 1020.0        6.59   0.23
----------------------------------------------------------------------------
           India Bonita IP                                                  
SSLC-13-25  anomaly        145.50  147.00     1.50  110.0        0.07   0.10
----------------------------------------------------------------------------
           India Bonita IP                                                  
SSLC-13-26  anomaly        248.87  251.95     3.08   16.5        ----   0.53
----------------------------------------------------------------------------
                                                                            
                                             WIDTH                          
DDH        VEIN TARGET       FROM      TO (mts)(i) Ag g/t        Cu %   Zn %
----------------------------------------------------------------------------
           Western deep IP                                                  
SSLC-13-27  anomaly                                    no significant values
----------------------------------------------------------------------------
           La Puerta north                                                  
SSLC-13-28  IP anomaly     381.25  383.65     2.40   37.8        0.92   0.75
----------------------------------------------------------------------------
           Skarn & quartz                                                   
and         veins          452.05  476.15    24.10   20.5        0.29   0.92
----------------------------------------------------------------------------
including  " "             455.02  456.25     1.23   54.3        0.85   3.08
----------------------------------------------------------------------------
including  " "             467.40  470.05     2.65   48.5        0.80   2.83
----------------------------------------------------------------------------
           Western deep IP                                                  
SSLC-13-29  anomaly                                    no significant values
----------------------------------------------------------------------------
           La Puerta                                                        
SSLC-13-30  dikes-veins    236.00  236.90     0.90   72.5        0.02   0.04
----------------------------------------------------------------------------
and        " "             244.70  250.90     6.20   67.0        0.03   0.05
----------------------------------------------------------------------------
and        " "             270.70  271.90     1.20   62.5        0.07   0.14
----------------------------------------------------------------------------
           Santa Rosa                                                       
SSLC-13-31  vein?          215.00  216.55     1.55  104.0        0.82   0.14
----------------------------------------------------------------------------
and                        220.60  222.65     2.05   38.9        0.08   0.22
----------------------------------------------------------------------------
SSLC-14-32 Skarn           205.20  206.35     1.15   44.3        0.21   0.31
----------------------------------------------------------------------------
           Sta Rosa E                                                       
and         Skarn?         350.75  352.15     1.40   22.7        0.68   0.02
----------------------------------------------------------------------------
and        " "             359.10  359.85     0.75   21.5        0.34   0.01
----------------------------------------------------------------------------

--  Widths represent intersected lengths. It is estimated most widths are
    within 70% of true widths. True widths will be reported at a later date
    once drill hole cross sections are interpreted. 

Tawn Albinson, M.Sc., President of the Company, is a Qualified Person, as defined in NI 43-101, and is responsible for the technical content of this press release. A quality control program is adopted to ensure best practices in the sampling and analysis of drill core. Samples are shipped in sealed bags to ALS-Chemex Laboratory preparation facilities in Chihuahua City (ISO 9001). Shipments include intermittent standards and blanks. Sample pulps are shipped to ALS-Chemex Laboratories in North Vancouver, B.C. for analysis. All samples were assayed by multielemental ME-ICP41, and gold by ICP21 (Inductively Induced Plasma-Atomic Emission Spectroscopy) which consists of a 30 gram fire assay with an ICP-AES finish. Silver, lead, zinc and copper values in excess of 100 ppm, 1%, 1%, and 1% respectively were repeated with aqua regia digestion and with ICP-AES (Code OG46).

About Prospero Silver Corp.:

Prospero is a Canadian resource company with the majority of its staff based in Mexico and who work for its wholly owned subsidiary MineraFumarola, SA de CV (Fumarola). Prospero's objective is to quickly evaluate the properties currently optioned for their suitability to provide size potential and/or amenability for strategic joint ventures.

Forward-Looking Statement Cautions:

This news release contains certain "forward-looking statements" within the meaning of Canadian securities legislation, relating to the closing of a non-brokered Private Placement. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "aims," "potential," "goal," "objective," "prospective," and similar expressions, or that events or conditions "will," "would," "may," "can," "could" or "should" occur, or are those statements, which, by their nature, refer to future events. Factors that could cause actual results to differ materially from these forward looking statements include, but are not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's inability to obtain any necessary permits, consents or authorizations required for its planned activities, and the Company's inability to raise the necessary capital or to be fully able to implement its business strategies. The reader is referred to the Company's reports, publicly available through the Canadian Securities Administrators' System for Electronic Document Analysis and Retrieval (SEDAR) at www.sedar.com, including the risk factors discussed in Prospero's November 27, 2009 prospectus. Except as required by securities laws and the policies of the TSX Venture Exchange, Prospero disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/Prospero_Silver_Corp_Map.pdf.

Contacts:
Prospero Silver Corp.
William Murray
Chairman
(604) 288-7813

Prospero Silver Corp.
Kirk Gamley
Contact Financial
(604) 561-3642

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The security devil is always in the details of the attack: the ones you've endured, the ones you prepare yourself to fend off, and the ones that, you fear, will catch you completely unaware and defenseless. The Internet of Things (IoT) is nothing if not an endless proliferation of details. It's the vision of a world in which continuous Internet connectivity and addressability is embedded into a growing range of human artifacts, into the natural world, and even into our smartphones, appliances, a...
In his session at WebRTC Summit, Peter Dunkley, Technical Director at Acision, will look at creating interactive communications via the web by adding messaging, file transfer, and group communication (group chat and audio/video conferencing) into the web experience. He will also discuss potential applications of this technology in areas including B2B, B2C, P2P, and gaming. Peter Dunkley is Technical Director at Acision. He graduated from The University of Edinburgh in 2000 with a BSc (Hons) in ...
What if, during a snow emergency, an on-the-ground sensor could automatically trigger a relevant emergency notification related to snowfall and road impact. And then, after it’s triggered, that notification is delivered intelligently to individuals based on an extensive set of rules designed to alert the most available and capable responders. This “what if” question about “smart highways” is short-sighted. We are already there, and we are only getting started. While mainstream attention is pai...
There are 182 billion emails sent every day, generating a lot of data about how recipients and ISPs respond. Many marketers take a more-is-better approach to stats, preferring to have the ability to slice and dice their email lists based numerous arbitrary stats. However, fundamentally what really matters is whether or not sending an email to a particular recipient will generate value. Data Scientists can design high-level insights such as engagement prediction models and content clusters that a...
In his session at 16th Cloud Expo, Simone Brunozzi, VP and Chief Technologist of Cloud Services at VMware, will review the changes that the cloud computing industry has gone through over the last five years and share insights into what the next five will bring. He will chronicle the challenges enterprise companies are facing as they move to the public cloud. He will delve into the “Hybrid Cloud” space and explain why every CIO should consider ‘hybrid cloud’ as part of their future strategy to a...
The Internet of Things is not new. Historically, smart businesses have used its basic concept of leveraging data to drive better decision making and have capitalized on those insights to realize additional revenue opportunities. So, what has changed to make the Internet of Things one of the hottest topics in tech? In his session at @ThingsExpo, Chris Gray, Director, Embedded and Internet of Things, discussed the underlying factors that are driving the economics of intelligent systems. Discover ...
Avnet, Inc. has announced that it ranked No. 4 on the InformationWeek Elite 100 – a list of the top business technology innovators in the U.S. Avnet was recognized for the development of an innovative cloud-based training system that serves as the foundation for Avnet Academy – the company’s education and training organization focused on technical training around top IT vendor technologies. The development of this system allowed Avnet to quickly expand its IT-related training capabilities around...
Scott Jenson leads a project called The Physical Web within the Chrome team at Google. Project members are working to take the scalability and openness of the web and use it to talk to the exponentially exploding range of smart devices. Nearly every company today working on the IoT comes up with the same basic solution: use my server and you'll be fine. But if we really believe there will be trillions of these devices, that just can't scale. We need a system that is open a scalable and by using ...
A new definition of Big Data & the practical applications of the defined components & associated technical architecture models This presentation introduces a new definition of Big Data, along with the practical applications of the defined components and associated technical architecture models. In his session at Big Data Expo, Tony Shan will start with looking into the concept of Big Data and tracing back the first definition by Doug Laney, and then he will dive deep into the description of 3V...
SYS-CON Media announced today that @WebRTCSummit Blog, the largest WebRTC resource in the world, has been launched. @WebRTCSummit Blog offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. @WebRTCSummit Blog can be bookmarked ▸ Here @WebRTCSummit conference site can be bookmarked ▸ Here
Why does developer experience matters, what makes for a great developer experience and what is the relationship between developer experience and the broader field of user experience? Software developers are gaining more influence over the purchase decisions of technologies with which they must build on and with which they must integrate. For example, the success of Amazon Web Services, Heroku and MongoDB has been driven primarily by individual software developers choosing to use these tools, ra...
The cloud has transformed how we think about software quality. Instead of preventing failures, we must focus on automatic recovery from failure. In other words, resilience trumps traditional quality measures. Continuous delivery models further squeeze traditional notions of quality. Remember the venerable project management Iron Triangle? Among time, scope, and cost, you can only fix two or quality will suffer. Only in today's DevOps world, continuous testing, integration, and deployment upend...
Cloud and Big Data present unique dilemmas: embracing the benefits of these new technologies while maintaining the security of your organization's assets. When an outside party owns, controls and manages your infrastructure and computational resources, how can you be assured that sensitive data remains private and secure? How do you best protect data in mixed use cloud and big data infrastructure sets? Can you still satisfy the full range of reporting, compliance and regulatory requirements? In...
Between the compelling mockups and specs produced by your analysts and designers, and the resulting application built by your developers, there is a gulf where projects fail, costs spiral out of control, and applications fall short of requirements. In his session at DevOps Summit, Charles Kendrick, CTO and Chief Architect at Isomorphic Software, will present a new approach where business and development users collaborate – each using tools appropriate to their goals and expertise – to build mo...
With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo in Silicon Valley. Learn what is going on, contribute to the discussions, and ensure that your enterprise is as "IoT-Ready" as it can be! Internet of @ThingsExpo, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading in...