Osisko Updates Canadian Malartic Mine Plan

Average Annual Gold Production of 610,000 ounces at US$516 per ounce (2014 - 2018)

MONTREAL, QUEBEC -- (Marketwired) -- 03/20/14 -- Osisko Mining Corporation (TSX: OSK)(FRANKFURT: EWX) ("Osisko") is pleased to provide an updated summary of the annual mine production plan for its 100%-owned Canadian Malartic mine. This new plan is based on the recently disclosed reserve estimate of 9.37M ounces gold using a gold price of US$1,300 per ounce (see Osisko March 12, 2014 press release). All Canadian dollar figures are based on an exchange rate of 1.10.

Highlights


--  Canadian Malartic proven & probable in-pit reserves of 9.37 million
    ounces
--  Mine life of 14.2 years based on a 55,000 tonnes per day (tpd) milling
    rate
--  Average gold production of 610,000 ounces per year over the next five
    years (2014-2018) at cash costs of US$516 per ounce
--  Average of 597,000 ounces per year gold production over life of mine at
    cash costs of US$525 per ounce
--  Average head grade of 1.09 g/t over the next five years, and 1.03 g/t
    over the mine life
--  Average metallurgical recovery of 89.2% over the mine life
--  Recoverable gold of 8.4 million ounces over the mine life
--  Life of mine sustaining capital of C$628 million
--  Life of mine development capital of C$233 million
--  Life of mine capitalized stripping of C$188 million
--  Discounted after-tax net cash flows of C$3,141 million over life of mine

Sean Roosen, President and CEO, noted: "We are very pleased to present our shareholders with this updated mine plan based on the latest engineered pit and reserve estimate of 9.37 M ounces gold. Not only has the latest reserve estimate demonstrated the robust nature of the Canadian Malartic deposit at US$1300 gold, but this updated mine plan thoroughly demonstrates Canadian Malartic's strong production profile and exceptional value. With life of mine average gold production of 597,000 ounces, cash costs of US$525 per ounce and location in one of the world's premier jurisdictions, it is abundantly clear that Canadian Malartic is a world class low-cost gold mine. This flagship asset will produce strong free cash flow for a long time for the benefit of our shareholders."

The key inputs and conclusions from the new mine plan are as follows:


----------------------------------------------------------------------------


                                               First 5 Years    Life of Mine

----------------------------------------------------------------------------
Economic Assumptions
----------------------------------------------------------------------------
Gold Price                            US$/oz           1,350           1,350
----------------------------------------------------------------------------
Canadian Dollar Rate                                    1.10            1.10
----------------------------------------------------------------------------
Electricity                        cents/kWh           0.044           0.044
----------------------------------------------------------------------------
Oil                                  US$/bbl             100             100
----------------------------------------------------------------------------
Fuel                                    C$/l            0.99            0.99
----------------------------------------------------------------------------
Income/Mining Tax Rates                    %     26.9 / 17.2     26.9 / 17.7
----------------------------------------------------------------------------
Royalty Rate                               %            1.13            0.81
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Operational Parameters
----------------------------------------------------------------------------
Strip Ratio                              W:O            2.10            2.09
----------------------------------------------------------------------------
Average Processed Gold Grade             g/t            1.09            1.03
----------------------------------------------------------------------------
Metallurgical Recovery                     %            89.0            89.2
----------------------------------------------------------------------------
Average Annual Gold Production      000's oz             610             597
----------------------------------------------------------------------------
Mine Life                              Years              na            14.2
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Operating Costs
----------------------------------------------------------------------------
Cash Costs                             C$/oz            $568            $577
----------------------------------------------------------------------------
Cash Costs                            US$/oz            $516            $525
----------------------------------------------------------------------------
All-in Sustaining Costs               US$/oz              na            $691
----------------------------------------------------------------------------
All-in Costs                          US$/oz              na            $717
----------------------------------------------------------------------------

----------------------------------------------------------------------------
LOM Capital Costs
----------------------------------------------------------------------------
Sustaining Capital                      C$ M              $628
----------------------------------------------------------------------------
Development Capital                     C$ M              $233
----------------------------------------------------------------------------
Capitalized Stripping                   C$ M              $188
----------------------------------------------------------------------------

Canadian Malartic Proven & Probable Reserves

The open pit Proven & Probable gold reserves now stand at 9.37 million (M) ounces at a fully diluted average gold grade of 1.04 grams per tonne ("g/t Au"), following total 2013 production of 475,277 ounces of gold. Total precious metal production from the beginning of operations in April 2011 to December 31, 2013 was 1,044,388 ounces gold and 753,776 ounces silver. Global Measured and Indicated (M&I) resources stand at 11.10 M ounces gold, and global Inferred resources stand at 1.16M ounces gold. The global in situ 2014 resources include reserves but exclude 2014 production to date.

Reserve estimates using base case US$1,300 engineered pit design with lower cut-off grade of 0.33 g/t Au


----------------------------------------------------------------------------
Sector                            Tonnes (M)     Grade (g/t)       Au (M oz)
----------------------------------------------------------------------------
Canadian Malartic
----------------------------------------------------------------------------
Proven Reserves                         45.5            0.85            1.25
----------------------------------------------------------------------------
Probable Reserves                      140.0            1.02            4.60
----------------------------------------------------------------------------
Proven & Probable Reserves             185.5            0.98            5.85
----------------------------------------------------------------------------
Barnat(i)
----------------------------------------------------------------------------
Proven Reserves                         12.1            1.35            0.52
----------------------------------------------------------------------------
Probable Reserves                       69.8            1.20            2.70
----------------------------------------------------------------------------
Proven & Probable Reserves              81.9            1.22            3.22
----------------------------------------------------------------------------
Gouldie + Jeffrey(i)
----------------------------------------------------------------------------
Proven Reserves                         5.88            0.70            0.13
----------------------------------------------------------------------------
Probable Reserves                       5.41            0.73            0.13
----------------------------------------------------------------------------
Proven & Probable Reserves              11.3            0.71            0.26
----------------------------------------------------------------------------
Stockpiles
----------------------------------------------------------------------------
Proven Reserves                         2.47            0.52            0.04
----------------------------------------------------------------------------
Probable Reserves                       0.00            0.00            0.00
----------------------------------------------------------------------------
Proven & Probable Reserves              2.47            0.52            0.04
----------------------------------------------------------------------------

----------------------------------------------------------------------------
TOTAL
----------------------------------------------------------------------------
Proven Reserves                         65.9            0.92            1.94
----------------------------------------------------------------------------
Probable Reserves                      215.3            1.07            7.43
----------------------------------------------------------------------------
Proven & Probable Reserves             281.2            1.04            9.37
----------------------------------------------------------------------------
(i)   Barnat and Jeffrey represent portions owned by Osisko and exclude
      Abitibi Royalties attributable ownership.

Mining & Production

The life of mine strip ratio is estimated at 2.09.

In terms of mine sequencing, the current life of mine plan contemplates mining of the Barnat zone in 2017, with pre-strip operations commencing mid-2015, with mining of the Gouldie zone commencing in 2014 and mining of the Jeffrey zone commencing in 2017.

Mining rates are expected to average 202,000 tpd in 2014, with a peak of 217,000 tpd in 2017.

The haul truck fleet is expected to grow by 3 trucks in 2016, to reach a peak of 28 during the mining of the Barnat zone. All the loading equipment required to mine the Barnat zone was added in 2012 and 2013, and therefore no further loading equipment is required.

Processing

Mine life is estimated at 14.2 years, based on a 55,000 tonnes per day (tpd) milling rate, assuming 92% availability. Average life of mine metallurgical recovery is estimated to be 89.2%.

A summary of the annual mine production plan is outlined in the following table:

Annual Mine Production Estimates(1)


----------------------------------------------------------------------------
                         Ore           Waste                             Ore
Period                 Mined           Mined     Strip Ratio          Milled

                        (Kt)            (Kt)                            (Kt)
----------------------------------------------------------------------------
2014                  20,153          53,884            2.67          18,533
----------------------------------------------------------------------------
2015                  24,495          54,003            2.20          20,075
----------------------------------------------------------------------------
2016                  27,021          52,339            1.94          20,130
----------------------------------------------------------------------------
2017                  26,475          48,982            1.85          20,075
----------------------------------------------------------------------------
2018                  23,586          46,148            1.96          20,075
----------------------------------------------------------------------------
2019                  25,450          36,430            1.43          20,075
----------------------------------------------------------------------------
2020                  20,589          40,977            1.99          20,130
----------------------------------------------------------------------------
2021                  17,195          42,279            2.46          20,075
----------------------------------------------------------------------------
2022                  23,618          38,027            1.61          20,075
----------------------------------------------------------------------------
2023                  20,990          38,966            1.86          20,075
----------------------------------------------------------------------------
2024                  14,270          42,384            2.97          20,130
----------------------------------------------------------------------------
2025                  14,676          40,966            2.79          20,075
----------------------------------------------------------------------------
2026                  14,810          40,760            2.75          20,075
----------------------------------------------------------------------------
2027                   7,469          11,606            1.55          20,075
----------------------------------------------------------------------------
2028                      --              --              --           3,594
----------------------------------------------------------------------------
Total/avg            280,797         587,751            2.09         283,267
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                                Attributable                    Attributable
                                   Processed                       Recovered
Period                 Grade            Gold       Recovery             Gold

                       (g/t)           (Koz)            (%)            (Koz)
----------------------------------------------------------------------------
2014                    1.00             598           89.0%             532
----------------------------------------------------------------------------
2015                    1.04             669           88.5%             592
----------------------------------------------------------------------------
2016                    1.09             708           89.1%             631
----------------------------------------------------------------------------
2017                    1.05             664           88.6%             588
----------------------------------------------------------------------------
2018                    1.24             785           89.7%             704
----------------------------------------------------------------------------
2019                    1.06             687           89.5%             615
----------------------------------------------------------------------------
2020                    0.89             576           88.4%             509
----------------------------------------------------------------------------
2021                    1.01             650           88.9%             578
----------------------------------------------------------------------------
2022                    0.95             613           89.0%             546
----------------------------------------------------------------------------
2023                    1.34             857           88.9%             762
----------------------------------------------------------------------------
2024                    1.01             644           89.7%             578
----------------------------------------------------------------------------
2025                    1.04             670           89.8%             602
----------------------------------------------------------------------------
2026                    1.08             697           90.3%             629
----------------------------------------------------------------------------
2027                    0.78             504           88.6%             447
----------------------------------------------------------------------------
2028                    0.44              51           85.5%              44
----------------------------------------------------------------------------
Total/avg               1.03           9,373           89.1%           8,356
----------------------------------------------------------------------------
(1)   Mill feed in a given year may include stockpiled ore. Exclusive of
      Abitibi Royalties' attributable portions of Barnat and Jeffrey,
      representing 44koz of processed gold.

Operating Costs

Cash costs over the life of mine are estimated to average US$525 per ounce, or C$577 per ounce. All-in-sustaining costs for Canadian Malartic are expected to be US$691 per ounce or C$760 per ounce, with all-in costs at Canadian Malartic expected to be US$717 per ounce or C$788 per ounce, as defined by the World Gold Council.


----------------------------------------------------------------------------
                          Life of Mine Cash Costs
----------------------------------------------------------------------------
                         C$ / tonne milled  C$ / tonne mined     C$ / ounce
----------------------------------------------------------------------------
Mining Costs                          7.61              2.48            258
----------------------------------------------------------------------------
Processing Costs                      8.05                --            273
----------------------------------------------------------------------------
General & Administration              2.17                --             73
----------------------------------------------------------------------------
Total before adjustments             17.83              2.48            604
----------------------------------------------------------------------------
Refining & Transport                    --                --              3
----------------------------------------------------------------------------
By-product Credits                      --                --            (19)
----------------------------------------------------------------------------
Capitalized Stripping                   --                --            (23)
----------------------------------------------------------------------------
Royalties                               --                --             12
----------------------------------------------------------------------------
Total                                   --                --            577
----------------------------------------------------------------------------

Capital Costs

Life of mine Sustaining capital is expected to total C$628 million, including mill and mine maintenance, mining equipment purchase, mining fleet major component replacement and tailings management.

Life of mine development capital is expected to total C$233 million, which includes:


--  Expenditure of C$157 million for topographic drilling, overburden
    removal and pre-shear drilling of bench walls.
--  Road deviation (Route 117): C$61 million.
--  Mill capital projects: C$15 million.

Life of mine capitalized stripping activities costs are expected to be C$188 million.

Economic Analysis

The cash flow model for Canadian Malartic is based on a gold price of US$1,350 per ounce and a Canadian dollar exchange rate of 1.10. Based on these parameters, the Canadian Malartic mine is expected to produce pre-tax cash flow of C$6,516 million and after-tax cash flow of C$4,388 million, inclusive of income and mining taxes.

Using a discount rate of 5%, Canadian Malartic generates discounted pre-tax net cash flows of C$4,551 million and after-tax net cash flows of C$3,141 million. This figure excludes the potential for tax savings using existing tax pools at Osisko's other subsidiaries (other Canadian projects) as well as potential tax synergies from the future development of these projects.


----------------------------------------------------------------------------
                      5% NPV Sensitivity to Gold Price
----------------------------------------------------------------------------
Gold Price (US$/oz)                                         5% After-Tax NPV
----------------------------------------------------------------------------
$1,350                                                               C$3,141
----------------------------------------------------------------------------
$1,500                                                               C$3,702
----------------------------------------------------------------------------
$2,000                                                               C$5,556
----------------------------------------------------------------------------

The following table summarizes the value of Canadian Malartic (excluding all of Osisko's other assets) based on consensus P/NAV multiples:


----------------------------------------------------------------------------
Company               P/NAV(1)     Implied Canadian Malartic Value Per Share
----------------------------------------------------------------------------
Agnico Eagle              1.7x                                        $12.16
----------------------------------------------------------------------------
Barrick                   1.6x                                        $11.44
----------------------------------------------------------------------------
Goldcorp                  1.5x                                        $10.73
----------------------------------------------------------------------------
Newmont                   1.5x                                        $10.73
----------------------------------------------------------------------------
New Gold                  1.3x                                         $9.30
----------------------------------------------------------------------------
Randgold                  1.3x                                         $9.30
----------------------------------------------------------------------------
Yamana                    1.2x                                         $8.58
----------------------------------------------------------------------------
Kinross                   1.2x                                         $8.58
----------------------------------------------------------------------------
Average                   1.4x                                        $10.10
----------------------------------------------------------------------------
 (1)  P/NAV multiple represents current share price divided by broker
      consensus net asset value per share (NAVPS) for each company. NAVPS is
      calculated as the median NAVPS for all or most of all equity research
      analysts that provide coverage to the company. The NAVPS calculations
      underlying the above are drawn from the median analysts' report for
      each company. We note that the companies noted above may have
      different geographic and operational portfolios. We also note that
      each such report may include different assumptions for the balance
      sheet position of the company, discount rate and gold price underlying
      the NAVPS calculation. These calculations, and the inputs, may not be
      directly comparable to the basis for the calculation of NAVPS
      undertaken for Osisko.

2014 Outlook

Mill throughput is expected to stabilize at approximately 55,000 tonnes per day in 2014 with the completion of optimization programs currently in progress. Together with increased contribution from higher grade material in the now accessible northern pit wall, it is anticipated that gold production for the current year will increase to between 525,000 to 575,000 ounces (an increase of 11% to 21% over record 2013 production of 475,277 ounces gold).

Cash costs per ounce are estimated between C$580 and C$635, a 24% to 16% reduction in costs from 2013. Cash costs per ounce in US dollars are estimated at US$527 to US$577 using an exchange rate of 1.10.

Capital expenditures for 2014 are estimated at C$148.0 million:


----------------------------------------------------------------------------
(In millions Canadian of dollars)
----------------------------------------------------------------------------
Canadian Malartic(1)                                                   125.8
----------------------------------------------------------------------------
Exploration and evaluation - capitalized                                22.2
----------------------------------------------------------------------------
Capital Expenditures                                                   148.0
----------------------------------------------------------------------------
(1)   Includes C$65.6 million related to stripping and pit preparation
      activities.

Conference Call Information

Osisko will host a conference call on Thursday, March 20, 2014 at 9:00 EDT, where senior management will discuss the updated mine plan and provide an update of the Company's activities. Those interested in participating in the conference call should dial in approximately five to ten minutes before the start of the conference to allow ample time to access at 1-416-981-9000 (Toronto local and international), or 1-800-893-0176 (North American toll free). An operator will direct participants to the call.

The conference call replay will be available from 11:00 EDT on March 20, 2014 until 23:59 EDT on April 3, 2014 with the following dial in number: 1 416 626 4100 or toll-free 800 558 5253, access code 21711924.

Reject the Inadequate Goldcorp Offer

As previously disclosed, the Osisko Board of Directors has unanimously recommended that Osisko shareholders reject the hostile take-over bid initiated by Goldcorp and not tender their Osisko shares to the Goldcorp offer. The Osisko Board determined that the Goldcorp offer fails to adequately compensate Osisko shareholders for, among others things, the strategic value of Osisko's world-class asset base, the significant upside potential of Osisko's Canadian Malartic Mine, or the increased risk inherent in Goldcorp common shares. The full basis for the Osisko Board's recommendation is available in a Directors' Circular, a copy of which is available online at www.osisko.com.

Shareholders who have questions or who may have already tendered their shares to the Goldcorp Offer and wish to withdraw them, may do so by contacting our Information Agent, Laurel Hill Advisory Group at:

North American Toll Free: 1-877-452-7184

Banks, Brokers or collect calls: 416-304-2011

Email: [email protected]

About Osisko Mining Corporation

Osisko Mining Corporation operates the Canadian Malartic Gold Mine in Malartic, Quebec and is pursuing exploration on a number of properties in Ontario and Mexico.

Mr. Luc Lessard, Eng., Senior Vice-President and Chief Operating Officer of Osisko, is the Qualified Person who has reviewed this news release and is responsible for the technical information reported herein, including verification of the data disclosed.

For further information on Canadian Malartic, please see at www.osisko.com or at www.sedar.com "Updated resource and reserve estimates for the Canadian Malartic Project Malartic, Quebec", dated May 10, 2011 and prepared by Belzile Solutions Inc. and G Mining Services Inc., as updated by press releases dated February 19, 2013 and March 12, 2014.

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that further work on the stated resources will lead to mineral reserves that can be mined economically.

Forward-Looking Statements

Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that Osisko expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur including, without limitation, the mining of the Barnat and Jeffrey zones commencing in 2017, the stabilization of mill throughput, the completion of optimization programs, the decrease of costs and increase of grade and gold production, the production of strong free cash flow for a long time, the Corporation's view on the quality and the potential of its Canadian Malartic asset and on Goldcorp common shares, and that mining of the deposits identified in this press release will be executed timely and fully, and will return values identified in the foregoing updated estimate. Although Osisko believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation, that all technical, political and financial conditions will be met in order to continue mining operations at Canadian Malartic to allow for the full extraction of the mining reserves, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements.

Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, Osisko's limited experience with production and mining operations, uninsured risks, validity of estimates, regulatory framework and changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in Osisko's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Osisko cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Osisko believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

Contacts:
John Burzynski
Vice-President Corporate Development
(416) 363-8653
www.osisko.com

Sylvie Prud'homme
Director of Investor Relations
(514) 735-7131
Toll Free: 1-888-674-7563

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
The 4th International DevOps Summit, co-located with16th International Cloud Expo – being held June 9-11, 2015, at the Javits Center in New York City, NY – announces that its Call for Papers is now open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's large...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at Internet of @ThingsExpo, James Kirkland, Chief Ar...
Connected devices and the Internet of Things are getting significant momentum in 2014. In his session at Internet of @ThingsExpo, Jim Hunter, Chief Scientist & Technology Evangelist at Greenwave Systems, examined three key elements that together will drive mass adoption of the IoT before the end of 2015. The first element is the recent advent of robust open source protocols (like AllJoyn and WebRTC) that facilitate M2M communication. The second is broad availability of flexible, cost-effective ...
Scott Jenson leads a project called The Physical Web within the Chrome team at Google. Project members are working to take the scalability and openness of the web and use it to talk to the exponentially exploding range of smart devices. Nearly every company today working on the IoT comes up with the same basic solution: use my server and you'll be fine. But if we really believe there will be trillions of these devices, that just can't scale. We need a system that is open a scalable and by using ...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
"SAP had made a big transition into the cloud as we believe it has significant value for our customers, drives innovation and is easy to consume. When you look at the SAP portfolio, SAP HANA is the underlying platform and it powers all of our platforms and all of our analytics," explained Thorsten Leiduck, VP ISVs & Digital Commerce at SAP, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
SAP is delivering break-through innovation combined with fantastic user experience powered by the market-leading in-memory technology, SAP HANA. In his General Session at 15th Cloud Expo, Thorsten Leiduck, VP ISVs & Digital Commerce, SAP, discussed how SAP and partners provide cloud and hybrid cloud solutions as well as real-time Big Data offerings that help companies of all sizes and industries run better. SAP launched an application challenge to award the most innovative SAP HANA and SAP HANA...
Fundamentally, SDN is still mostly about network plumbing. While plumbing may be useful to tinker with, what you can do with your plumbing is far more intriguing. A rigid interpretation of SDN confines it to Layers 2 and 3, and that's reasonable. But SDN opens opportunities for novel constructions in Layers 4 to 7 that solve real operational problems in data centers. "Data center," in fact, might become anachronistic - data is everywhere, constantly on the move, seemingly always overflowing. Net...
What do a firewall and a fortress have in common? They are no longer strong enough to protect the valuables housed inside. Like the walls of an old fortress, the cracks in the firewall are allowing the bad guys to slip in - unannounced and unnoticed. By the time these thieves get in, the damage is already done and the network is already compromised. Intellectual property is easily slipped out the back door leaving no trace of forced entry. If we want to reign in on these cybercriminals, it's hig...
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
How do APIs and IoT relate? The answer is not as simple as merely adding an API on top of a dumb device, but rather about understanding the architectural patterns for implementing an IoT fabric. There are typically two or three trends: Exposing the device to a management framework Exposing that management framework to a business centric logic Exposing that business layer and data to end users. This last trend is the IoT stack, which involves a new shift in the separation of what stuff happe...