SYS-CON MEDIA Authors: Ian Khan, Liz McMillan, AppDynamics Blog, Harry Trott, Blue Box Blog

News Feed Item

Denison Intersects High Grade Uranium at a New Target Area at Wheeler River

TORONTO, ONTARIO -- (Marketwired) -- 03/20/14 -- Denison Mines Corp. (TSX:DML)(NYSE MKT:DNN) ("Denison" or the "Company") is pleased to announce that high grade, basement hosted uranium mineralization averaging 9.7% eU3O8 over 4.6 metres has been intersected in drill hole WR-556 at the K North target area 3.0 kilometres northwest of the Phoenix deposit at Wheeler River. This new zone of mineralization has been named the Gryphon zone.

Gryphon Zone

Drill hole WR-556 targeted the down-dip extension of weak mineralization in two historic drill holes in the K North area. WR-556 intersected a basement wedge that has been faulted up into the sandstone, and then encountered a large interval of graphitic basement, within which is a zone of alteration and mineralization 140 metres down-dip of the old drill holes. From down-hole total gamma probe results, the high grade portion of the mineralization averages 9.7% eU3O8 over 4.6 meters, using a cut-off grade of 1% eU3O8. The high grade mineralization is flanked by lower grade mineralization on both sides, and the entire interval averages 3.7% eU3O8 over 12.6 metres, using a cut-off grade of 0.1% eU3O8. Figure 1 shows the location of WR-556 relative to the Phoenix deposit and other target areas at Wheeler River.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/934493-F1.pdf.

Gryphon Zone Discovery Intersection


Hole-ID             From (m)          To (m)      Length (m)     eU3O8(1)(%)
----------------------------------------------------------------------------
WR-556(2)              691.0           703.6            12.6             3.7
(includes)(3)          696.1           700.7             4.6             9.7
----------------------------------------------------------------------------
Notes:                                                                      

1.  eU3O8 is radiometric equivalent uranium from a total gamma down-hole
    probe 
2.  Intersection interval is composited above a cut-off grade of 0.1% eU3O8 
3.  Intersection interval is composited above a cut-off grade of 1.0% eU3O8 

The mineralization at the Gryphon zone is approximately 200 metres beneath the sub-Athabasca unconformity and is open in both strike directions and down-dip. As WR-556 is a vertical drill hole and the mineralization is expected to dip moderately, the true thickness is approximately 70% of the intersection length.

The Wheeler River property lies between the McArthur River Mine and Key Lake mill complex in the Athabasca Basin in northern Saskatchewan. Denison is the operator and holds a 60% interest in the project. Cameco Corporation holds a 30% interest and JCU (Canada) Exploration Company, Limited holds the remaining 10% interest.

Qualified Person

The disclosure of a scientific or technical nature contained in this news release was prepared by Steve Blower, P.Geo., Denison's Vice President, Exploration, who is a Qualified Person in accordance with the requirements of NI 43-101. For a description of the quality assurance program and quality control measures applied by Denison, please see Denison's Annual Information Form dated March 14, 2014 filed under the Company's profile on SEDAR at www.sedar.com.

About Denison

Denison is a uranium exploration and development company with interests in exploration and development projects in Canada, Zambia, Namibia, and Mongolia. Including the high grade Phoenix deposits, located on its 60% owned Wheeler project, Denison's exploration project portfolio includes 43 projects and totals approximately 584,000 hectares in the Eastern Athabasca Basin region of Saskatchewan. Denison's interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake joint venture, which includes several uranium deposits and the McClean Lake uranium mill, one of the world's largest uranium processing facilities, plus a 25.17% interest in the Midwest deposit and a 60% interest in the J Zone deposit on the Waterbury property. Both the Midwest and J Zone deposits are located within 20 kilometres of the McClean Lake mill. Internationally, Denison owns 100% of the conventional heap leach Mutanga project in Zambia, 100% of the uranium/copper/silver Falea project in Mali, a 90% interest in the Dome project in Namibia, and an 85% interest in the in-situ recovery projects held by the Gurvan Saihan joint venture ("GSJV") in Mongolia.

Denison is engaged in mine decommissioning and environmental services through its DES division and is the manager of UPC, a publicly traded company which invests in uranium oxide and uranium hexafluoride.

Cautionary Statements

Certain information contained in this press release constitutes "forward-looking information", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and similar Canadian legislation concerning the business, operations and financial performance and condition of Denison.

Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to".

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. Denison believes that the expectations reflected in this forward-looking information are reasonable but no assurance can be given that these expectations will prove to be correct and such forward-looking information included in this press release should not be unduly relied upon. This information speaks only as of the date of this press release. In particular, this press release may contain forward-looking information pertaining to the following: the likelihood of completing and benefits to be derived from corporate transactions; the estimates of Denison's mineral reserves and mineral resources; expectations regarding the toll milling of Cigar Lake ores; capital expenditure programs, estimated exploration and development expenditures and reclamation costs; expectations of market prices and costs; supply and demand for uranium ("U3O8"); possible impacts of litigation and regulatory actions on Denison; exploration, development and expansion plans and objectives; expectations regarding adding to its mineral reserves and resources through acquisitions and exploration; and receipt of regulatory approvals, permits and licenses under governmental regulatory regimes.

There can be no assurance that such statements will prove to be accurate, as Denison's actual results and future events could differ materially from those anticipated in this forward-looking information as a result of the factors discussed in or referred to under the heading "Risk Factors" in Denison's Annual Information Form dated March 14, 2014 available at http://www.sedar.com, and in its Form 40-F available at http://www.sec.gov/edgar.shtml.

Accordingly, readers should not place undue reliance on forward-looking statements. These factors are not, and should not be construed as being, exhaustive. Statements relating to "mineral reserves" or "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.

Contacts:
Denison Mines Corp.
Ron Hochstein
President and Chief Executive Officer
(416) 979-1991 ext 232

Denison Mines Corp.
Sophia Shane
Investor Relations
(604) 689-7842
www.denisonmines.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
DevOps Summit, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long developmen...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
Application metrics, logs, and business KPIs are a goldmine. It’s easy to get started with the ELK stack (Elasticsearch, Logstash and Kibana) – you can see lots of people coming up with impressive dashboards, in less than a day, with no previous experience. Going from proof-of-concept to production tends to be a bit more difficult, unfortunately, and it tends to gobble up our attention, time, and money. In his session at DevOps Summit, Otis Gospodnetić, co-author of Lucene in Action and founder...
While Docker continues to be the darling of startups, enterprises and IT innovators around the world, networking continues to be a real mess. Indeed, managing the interaction between Docker containers and networks has always been fraught with complications. Without automation in networking, the vision of running Docker at scale and letting IT run the same apps unchanged on the laptop and in the data center or for any cloud cannot be realized.
“The year of the cloud – we have no idea when it's really happening but we think it's happening now. For those technology providers like Zentera that are helping enterprises move to the cloud - it's been fun to watch," noted Mike Loftus, VP Product Management and Marketing at Zentera Systems, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
“We are a managed services company. We have taken the key aspects of the cloud and the purposed data center and merged the two together and launched the Purposed Cloud about 18–24 months ago," explained Chetan Patwardhan, CEO of Stratogent, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that CenturyLink, Inc., a leader in the network services market, has been named “Platinum Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. CenturyLink is the third largest telecommunications company in the United States and is recognized as a leader in the network services market by technology industry analyst firms. The company is a global leader in cloud infrastructure and ...
Database apps on mobile devices shouldn't stop working when there's limited or no network connectivity. In his session at 16th Cloud Expo, Bradley Holt, a Developer Advocate for IBM Cloudant, will discuss how to bring data stored in a cloud database to the edge of the network (and back again), whenever an Internet connection is available. He will demonstrate techniques for replicating cloud databases with mobile devices in order to build offline-enabled mobile apps that can provide a better,...
In his session at 16th Cloud Expo, Simone Brunozzi, VP and Chief Technologist of Cloud Services at VMware, will review the changes that the cloud computing industry has gone through over the last five years and share insights into what the next five will bring. He will chronicle the challenges enterprise companies are facing as they move to the public cloud. He will delve into the “Hybrid Cloud” space and explain why every CIO should consider ‘hybrid cloud’ as part of their future strategy to a...
"Blue Box has been around for 10-11 years, and last year we launched Blue Box Cloud. We like the term 'Private Cloud as a Service' because we think that embodies what we are launching as a product - it's a managed hosted private cloud," explained Giles Frith, Vice President of Customer Operations at Blue Box, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Puppet Labs on Wednesday released the DevOps Salary Report, based on salary data gathered from Puppet Labs' industry-recognized State of DevOps Report. The data confirms that market demand for DevOps skills is growing, and that DevOps engineers are among the highest paid IT practitioners today. That's because IT organizations today are grappling with how to be more agile and responsive to the business, while maintaining the stability of their infrastructure. DevOps practices, such as continuous ...
"SOASTA built the concept of cloud testing in 2008. It's grown from rather meager beginnings to where now we are provisioning hundreds of thousands of servers on a daily basis on behalf of customers around the world to test their applications," explained Tom Lounibos, CEO of SOASTA, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Docker is becoming very popular--we are seeing every major private and public cloud vendor racing to adopt it. It promises portability and interoperability, and is quickly becoming the currency of the Cloud. In his session at DevOps Summit, Bart Copeland, CEO of ActiveState, discussed why Docker is so important to the future of the cloud, but will also take a step back and show that Docker is actually only one piece of the puzzle. Copeland will outline the bigger picture of where Docker fits a...
“This win means a great deal to us because it is decided by the readers – the people who understand how use of our technology enables new insights that drive the business,” said Matt Davies, senior director, EMEA marketing, Splunk. “Splunk Enterprise enables organizations to improve service levels, reduce operations costs, mitigate security risks, enhance DevOps collaboration, create new product and service offerings and obtain deeper insight into customer behavior. Being named Best Business App...