Newcrest Mining Limited - Quarterly Report for the three months ending 31 March 2014

MELBOURNE, Australia, April 23, 2014 /CNW/ - Newcrest Mining Limited (ASX: NCM) - Quarterly Report for the three months ending 31 March 2014 (these figures are unaudited)

Key Points

  • Quarterly gold production of 551,590 ounces
  • Quarterly copper production of 21,012  tonnes
  • Average realised gold price for the quarter of A$1,450/oz
  • Group All-In Sustaining Cost(1) for the quarter of A$988/oz (US$886/oz)(2)
  • All-In Sustaining Cost(1) at each operation was below the average realised gold price for the quarter
  • Full year guidance maintained with gold production expected to be around the top of the guidance range (2.3Moz) and Group All-In Sustaining Costs expected to be at or below the lower end of the guidance range(3)
  • Cadia Valley production ahead of FY2014(4) guidance but FY2015(4) production is expected to be below 2014(4) with Ridgeway ore grades expected to be lower in 2015(3). Cadia East Panel Cave 2 west crusher commissioned ahead of schedule. Cadia Valley gold production expected to be around 700,000 ounces in FY2016 with a further increase in production expected in FY2017.(3),(4)
  • Lihir will continue to feed the process plant with predominantly stockpile material in FY2015(3),(4)
  • Newcrest's operational priority remains on maximising free cash flow, not maximising production ounces

Overview

Newcrest is on track to deliver full year gold production around the top end of the guidance range following production of 551,590 ounces of gold and 21,012 tonnes of copper for the March 2014 quarter with the All-In Sustaining Cost (AISC) of sales being A$988 per ounce (US$886 per ounce).

Gold production for the quarter was 11% lower than the previous quarter, primarily due to lower mill throughput associated with increased maintenance activity, which included a conveyor belt replacement at Ridgeway, a shutdown to complete the Cadia East west crusher tie-in and processing plant maintenance at Lihir. Lower production at Telfer, Ridgeway and Lihir for the quarter was partially offset by the production ramp-up at Cadia East.

Development of Cadia East Panel Cave 2 continued with the commissioning of the Panel Cave 2 west crusher and associated materials handling infrastructure completed ahead of schedule during the quarter. The additional crushing capacity will enable the production ramp-up at Cadia East to continue.

All-In Sustaining Cost of A$988 per ounce was 7% higher than the previous quarter primarily due to a 24% increase in sustaining capital expenditure per ounce and a 15% reduction in by-product credits per ounce compared to the previous quarter, partially offset by lower site operating costs. Each operation again had an All-In Sustaining Cost below the average realised gold price for the quarter of A$1,450 per ounce.

Newcrest Managing Director and Chief Executive Officer, Greg Robinson, said: "Newcrest continues to maintain a sharp focus on cost reduction initiatives across the entire business. Our year-to-date All-In Sustaining Cost of A$998 per ounce is A$285 per ounce lower than last financial year which has enabled us to expand our All-In Sustaining Cost operating margin to A$462 per ounce this quarter despite the lower gold price environment."

Exploration activities continued during the March 2014 quarter with positive drilling results at Wafi-Golpu and Gosowong.

During the quarter the Company announced that it had completed arrangements to extend the tenor of its existing bilateral bank loan facilities providing a smoother and longer average maturity profile with no material change to terms and conditions and no increase in interest cost.

(1)  All-In Sustaining Cost metrics as per World Gold Council Guidance Note on Non-GAAP Metrics, released 27 June 2013. Newcrest Group All-In Sustaining Cost will vary from quarter to quarter as a result of various factors including production performance, timing of sales, the level of sustaining capital and the relative contribution of each asset.
(2) March 2014 quarter All-In Sustaining Costs in USD terms are converted to USD at an average A$:US$ exchange rate for the quarter of $0.896.
(3) Subject to market and operating conditions - refer to Newcrest's Forward Looking Statements disclaimer on page 22.
(4) Refers to financial years ending 30 June.

Guidance(5)

Subject to market and operating conditions(5)

  • Full year production guidance is maintained for both gold and copper, with gold production expected to be around the top end of the guidance range (2.3 million ounces); and
  • Full Year Group All-In Sustaining Cost $M - including exploration, production stripping and sustaining capital expenditure - is expected to be at or below the lower end of the guidance range.

Guidance for the 2015 financial year will be provided in due course following completion of the budgeting process for 2015 which will be around the time of release of the June 2014 Quarterly results. At this stage, subject to completion of the budgeting process and market and operating conditions:

  • Cadia Valley production for the 2015 financial year is likely to be below that of the 2014 financial year principally due to lower gold and copper grades at Ridgeway, subject also to Cadia East Panel Cave 2 development rates. For the 2014 financial year, Cadia Valley is expected to produce above the guidance range(3) (480,000 to 530,000), principally due to unexpectedly higher grades at the Ridgeway operations, which are not expected to continue in the 2015 financial year. Overall, Cadia Valley gold production is expected to be around 700,000 ounces in the 2016 financial year with a further increase in production expected in the 2017 financial year(3); and
  • as part of its focus on cash maximisation, Lihir is likely to again have an elevated level of stockpile feed in the 2015 financial year such that production in the 2015 financial year is likely to be in the same range as for the 2014 financial year(3).

(5) Refer to Newcrest's Forward Looking Statements disclaimer on page 22 of the report

Forward Looking Statements

These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

Forward looking statements are based on the company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company's business and operations in the future.  The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company's control.

Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the company.  Accordingly, readers are cautioned not to place undue reliance on forward looking statements.  Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

Ore Reserves and Mineral Resources Reporting Requirements

As an Australian company with securities listed on the Australian Securities Exchange ("ASX"), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") and that Newcrest's ore reserve and mineral resource estimates comply with the JORC Code. Newcrest ceased its listing on the Toronto Stock Exchange ("TSX") on 4 September 2013, but will remain subject to certain Canadian disclosure requirements and standards until it ceases to be an Ontario Securities Commission registrant. Prior to that, Newcrest will continue, in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators, to report its ore reserves and mineral resources estimates in compliance with the JORC Code, along with a reconciliation to the material differences between the JORC Code and the applicable definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Definition Standards). In relation to the December 2013 Resources and Reserves Statement, released to the ASX on 14 February 2014, the reconciliation is set out in Newcrest's Canadian News Release dated 14 February 2014, and is available at www.sedar.com and at Newcrest's website www.newcrest.com.au.  Except as otherwise noted in that document, there are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources, and Proven and Probable Reserves, under the CIM Definition Standards and the equivalent or corresponding definitions in the JORC Code.

Competent Person's Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves and other scientific and technical information, is based on information compiled by Mr C. Moorhead. Mr Moorhead is the Executive General Manager Minerals and a full-time employee of Newcrest Mining Limited. He is a shareholder in Newcrest Mining Limited and is entitled to participate in Newcrest's executive equity long term incentive plan, details of which are included in Newcrest's 2013 Remuneration Report. Ore Reserves growth is one of the performance measures under that plan. He is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in The JORC Code 2012 and is a Qualified Person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). Mr Moorhead consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including sampling, analytical and test data underlying the results.

A copy of the release be found on Newcrest's website: www.newcrest.com.au and on SEDAR: www.sedar.com.

SOURCE Newcrest Mining Limited

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
Verizon Enterprise Solutions is simplifying the cloud-purchasing experience for its clients, with the launch of Verizon Cloud Marketplace, a key foundational component of the company's robust ecosystem of enterprise-class technologies. The online storefront will initially feature pre-built cloud-based services from AppDynamics, Hitachi Data Systems, Juniper Networks, PfSense and Tervela. Available globally to enterprises using Verizon Cloud, Verizon Cloud Marketplace provides a one-stop shop fo...
AppZero has announced that its award-winning application migration software is now fully qualified within the Microsoft Azure Certified program. AppZero has undergone extensive technical evaluation with Microsoft Corp., earning its designation as Microsoft Azure Certified. As a result of AppZero's work with Microsoft, customers are able to easily find, purchase and deploy AppZero from the Azure Marketplace. With just a few clicks, users have an Azure-based solution for moving applications to the...
“In the past year we've seen a lot of stabilization of WebRTC. You can now use it in production with a far greater degree of certainty. A lot of the real developments in the past year have been in things like the data channel, which will enable a whole new type of application," explained Peter Dunkley, Technical Director at Acision, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
SYS-CON Events announced today that IDenticard will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. IDenticard™ is the security division of Brady Corp (NYSE: BRC), a $1.5 billion manufacturer of identification products. We have small-company values with the strength and stability of a major corporation. IDenticard offers local sales, support and service to our customers across the United States and Canada...
SYS-CON Events announced today that AIC, a leading provider of OEM/ODM server and storage solutions, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. AIC is a leading provider of both standard OTS, off-the-shelf, and OEM/ODM server and storage solutions. With expert in-house design capabilities, validation, manufacturing and production, AIC's broad selection of products are highly flexible and are conf...
Leysin American School is an exclusive, private boarding school located in Leysin, Switzerland. Leysin selected an OpenStack-powered, private cloud as a service to manage multiple applications and provide development environments for students across the institution. Seeking to meet rigid data sovereignty and data integrity requirements while offering flexible, on-demand cloud resources to users, Leysin identified OpenStack as the clear choice to round out the school's cloud strategy. Additional...
The BPM world is going through some evolution or changes where traditional business process management solutions really have nowhere to go in terms of development of the road map. In this demo at 15th Cloud Expo, Kyle Hansen, Director of Professional Services at AgilePoint, shows AgilePoint’s unique approach to dealing with this market circumstance by developing a rapid application composition or development framework.
The cloud is becoming the de-facto way for enterprises to leverage common infrastructure while innovating and one of the biggest obstacles facing public cloud computing is security. In his session at 15th Cloud Expo, Jeff Aliber, a global marketing executive at Verizon, discussed how the best place for web security is in the cloud. Benefits include: Functions as the first layer of defense Easy operation –CNAME change Implement an integrated solution Best architecture for addressing network-l...
“We help people build clusters, in the classical sense of the cluster. We help people put a full stack on top of every single one of those machines. We do the full bare metal install," explained Greg Bruno, Vice President of Engineering and co-founder of StackIQ, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The major cloud platforms defy a simple, side-by-side analysis. Each of the major IaaS public-cloud platforms offers their own unique strengths and functionality. Options for on-site private cloud are diverse as well, and must be designed and deployed while taking existing legacy architecture and infrastructure into account. Then the reality is that most enterprises are embarking on a hybrid cloud strategy and programs. In this Power Panel at 15th Cloud Expo (http://www.CloudComputingExpo.com...
"BSQUARE is in the business of selling software solutions for smart connected devices. It's obvious that IoT has moved from being a technology to being a fundamental part of business, and in the last 18 months people have said let's figure out how to do it and let's put some focus on it, " explained Dave Wagstaff, VP & Chief Architect, at BSQUARE Corporation, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The move in recent years to cloud computing services and architectures has added significant pace to the application development and deployment environment. When enterprise IT can spin up large computing instances in just minutes, developers can also design and deploy in small time frames that were unimaginable a few years ago. The consequent move toward lean, agile, and fast development leads to the need for the development and operations sides to work very closely together. Thus, DevOps become...
SYS-CON Media announced today that Aruna Ravichandran, VP of Marketing, Application Performance Management and DevOps at CA Technologies, has joined DevOps Journal’s authors. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Aruna's inaugural article "Four Essential Cultural Hacks for DevOps Newbies" discusses how to demonstrate the...
"Our premise is Docker is not enough. That's not a bad thing - we actually love Docker. At ActiveState all our products are based on open source technology and Docker is an up-and-coming piece of open source technology," explained Bart Copeland, President & CEO of ActiveState Software, in this SYS-CON.tv interview at DevOps Summit at Cloud Expo®, held Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.