SYS-CON MEDIA Authors: Pat Romanski, Elizabeth White, Yeshim Deniz, Nikita Ivanov, Sean Houghton

News Feed Item

Columbus Gold Announces Additional Drilling Results from Montagne d'Or Including 7.35 g/t Gold over 7.8 Meters; Second Drill Rig in Transit

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 04/30/14 -- Columbus Gold Corporation (TSX VENTURE: CGT) ("Columbus Gold") reports on the progress of the Phase II diamond drilling campaign currently underway at its Montagne d'Or gold deposit, Paul Isnard Project, French Guiana.

Forty-seven (47) drill holes (106 to 152) have been completed, for a total of 5,900 metres, as part as of a 26,600 metre (135 holes) drilling program. In addition, six (6) large diameter HQ-calibre core holes (1,000 m) were completed for detailed metallurgical testing as part of a preliminary economic assessment study (PEA). A second track-mounted diamond drill rig has been shipped from Canada and is expected to arrive on site in May with the aim of completing the Phase II program in September.

The holes drilled to date in the current program are short holes at the northern base of the Montagne d'Or deposit, designed to test the near surface projection of the secondary Lower Favorable Zone ("LFZ") and Footwall Zone ("FWZ"). Some of the holes were collared into the principal Upper Felsic Zone ("UFZ") to reach the LFZ. All holes intersected sulphide-gold mineralised intervals.

Gold assay results were previously released for 18 holes (106 to 123) and results have been received for an additional 18 holes (124 to 141). Notable intersections received in the 18 holes include:


Drill Hole Intercept        Grade           Length       (True Width - "TW")

MO-14-124  48.0 to 67.2 m   1.59 g/t gold   over 19.2 m  (14.7 m TW)
M0-14-125  52.4 to 65.5 m   2.25 g/t gold   over 13.1 m  (10.0 m TW)
           105.0 to 112.8 m 7.35 g/t gold   over 7.8 m   (6.2 m TW)
MO-14-127  80.0 to 90.0 m   5.28 g/t gold   over 10.0 m  (7.8 m TW)
MO-14-132  7.7 to 37.0 m    0.94 g/t gold   over 29.3 m  (23.1 m TW)
           44.4 to 47.0 m   6.22 g/t gold   over 3.0 m   (2.4 m TW)
MO-14-134  33.3 to 55.6 m   2.80 g/t gold   over 22.3 m  (17.2 m TW)
MO-14-135  71.5 to 88.8 m   1.60 g/t gold   over 17.3 m  (13.5 m TW)
MO-14-137  117.1 to 123.0 m 4.42 g/t gold   over 6.0 m   (4.7 m TW)
MO-14-138  33.0 to 49.0 m   1.50 g/t gold   over 16.0 m  (12.5 m TW)
MO-14-141  21.5 to 32.5 m   2.93 g/t gold   over 11.0 m  (8.4 m TW)

Highlights of the new results include:


--  The intersections in holes 124, 125 and 127 have extended the LFZ over a
    strike extent of 200 metres to the west and the zone remains open in
    that direction;
--  The intersections in holes 132, 134 and 135 and 137 served to better
    define a well-mineralised section of the LFZ located in the east-central
    part of the Montagne d'Or deposit;
--  The intersection in hole 141 has opened-up the potential to extend the
    LFZ to the east and the zone remains open in that direction.

A drill plan and full assay results are available at the following links:

www.columbusgoldcorp.com/i/nr/2014-04-30_drillplan.pdf

www.columbusgoldcorp.com/i/nr/2014-04-30_assays.pdf

The drilling is being funded by Nord Gold N.V. as part of a 3 year minimum US$30 million exploration and development program pursuant to which Nord Gold can earn a 50.01% interest in Montagne d'Or and certain Paul Isnard mineral claims, by completing a bankable feasibility study.

The Montagne d'Or deposit contains a NI 43-101 compliant inferred gold resource using a cut-off grade of 0.3 grams per tonne gold of 5.37 million ounces within 117.1 million tonnes at an average grade of 1.43 grams per tonne gold. The resources are defined within a gold mineralized area of 2,250 meters by 400 meters and to an average depth of 250 meters from surface. The mineralized zones remain open in part along strike and at depth.

The objectives of the Phase II drilling program are to:


--  complete a 50-meter spacing array to a vertical depth of 200 meters from
    surface, and select 25-meter in-fill, focused on mineralisation
    potentially amenable to open pit mining;
--  internally increase current mineralized tonnage;
--  increase confidence in the gold grade-width distribution;
--  convert inferred resources to the indicated category in accordance with
    NI 43-101 standards;
--  acquire a better distribution of copper assays for added value to the
    deposit.

Qualified Person, Technical Info and QA/QC

Diamond drill holes were bored with HQ-size core in the upper oxidized saprolitic zone and NQ-size core in fresh rock. The core was placed in plastic core boxes with covers and delivered by the drilling contractor, Performax Drilling Inc., a Canadian company with qualified personnel, to the Citron camp logging facilities, located 5 km from Montagne d'Or. Columbus Gold personnel are present at the camp at all times during the drilling program.

The core was photographed for reference, logged (geotechnical and geological) and identified sulphide mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Individual half core samples were placed in canvas bags and sealed by batch of 9 samples in polypropylene bags for air transport to the Cayenne and trucking to Filab Amsud laboratory in Paramaribo, Suriname, an ISO 9001 and ISO / IEC 17025 accredited laboratory. The remaining half core is stored in core racks on site at Citron camp for reference. Samples were assayed for gold by fire-assay method using an atomic absorption finish on a 50-gram pulp split.

A quality assurance and quality control program (QA/QC) was implemented by Columbus Gold and Filab Amsud to insure the accuracy and reproducibility of the analytical method and results are maintained. The QA/QC program includes the insertion of standards, blanks and field duplicates in each laboratory assay batch and systematic re-assaying of samples returning values above 5 g/t Au by the fire-assay method using a gravimetric finish on a 50-gram pulp split. As well, 10% of random sample pulps are sent to SGS del Peru S.A.C. laboratory for gold check assaying.

The drilling program is being conducted under the supervision of Rock Lefrancois, P.Geo. (OGQ), Chief Operating Officer for Columbus Gold and Qualified Person under National Instrument 43-101. Mr. Lefrancois, the Qualified Person, has reviewed this news release and is responsible for the technical information reported herein, including verification of the data disclosed.

ON BEHALF OF THE BOARD,

Robert F. Giustra, Chairman & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release contains forward-looking information and statements, as defined by law including without limitation Canadian securities laws and the "safe harbor" provisions of the US Private Securities Litigation Reform Act of 1995 ("forward-looking statements"), respecting Columbus Gold's: proposed drilling programs; projected funding of drilling programs by Nord Gold N.V. pursuant to the terms of the option agreement and the related completion of a bankable feasibility study and general exploration plans. Forward-looking statements involve risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by the forward-looking statements, including: the ability to acquire necessary permits and other authorizations; environmental compliance; cost increases; availability of qualified workers and drill equipment; competition for mining properties; risks associated with exploration projects, mineral reserve and resource estimates (including the risk of assumption and methodology errors); dependence on third parties for services; non-performance by contractual counterparties; title risks; risks associated with Nord Gold N.V. electing not to exercise its option and make the related option payments; and general business and economic conditions. Forward-looking statements are based on a number of assumptions that may prove to be incorrect, including without limitation assumptions about: that the design of the drill plan is appropriate for the site; general business and economic conditions; the timing and receipt of required approvals; availability of financing; power prices; ability to procure equipment and supplies including without limitation drill rigs; and ongoing relations with employees, partners, optionees and joint venturers. The foregoing list is not exhaustive and Columbus Gold undertakes no obligation to update any of the foregoing except as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
In her General Session at 15th Cloud Expo, Anne Plese, Senior Consultant, Cloud Product Marketing, at Verizon Enterprise, focused on finding the right mix of renting vs. buying Oracle capacity to scale to meet business demands, and offer validated Oracle database TCO models for Oracle development and testing environments. Anne Plese is a marketing and technology enthusiast/realist with over 19+ years in high tech. At Verizon Enterprise, she focuses on driving growth for the Verizon Cloud platfo...
The Internet of Things will put IT to its ultimate test by creating infinite new opportunities to digitize products and services, generate and analyze new data to improve customer satisfaction, and discover new ways to gain a competitive advantage across nearly every industry. In order to help corporate business units to capitalize on the rapidly evolving IoT opportunities, IT must stand up to a new set of challenges. In his session at @ThingsExpo, Jeff Kaplan, Managing Director of THINKstrateg...
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
There's Big Data, then there's really Big Data from the Internet of Things. IoT is evolving to include many data possibilities like new types of event, log and network data. The volumes are enormous, generating tens of billions of logs per day, which raise data challenges. Early IoT deployments are relying heavily on both the cloud and managed service providers to navigate these challenges. In her session at Big Data Expo®, Hannah Smalltree, Director at Treasure Data, discussed how IoT, Big D...
SYS-CON Events announced today that Gridstore™, the leader in hyper-converged infrastructure purpose-built to optimize Microsoft workloads, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Gridstore™ is the leader in hyper-converged infrastructure purpose-built for Microsoft workloads and designed to accelerate applications in virtualized environments. Gridstore’s hyper-converged infrastructure is the ...
The 4th International DevOps Summit, co-located with16th International Cloud Expo – being held June 9-11, 2015, at the Javits Center in New York City, NY – announces that its Call for Papers is now open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's large...
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at Internet of @ThingsExpo, James Kirkland, Chief Ar...
Connected devices and the Internet of Things are getting significant momentum in 2014. In his session at Internet of @ThingsExpo, Jim Hunter, Chief Scientist & Technology Evangelist at Greenwave Systems, examined three key elements that together will drive mass adoption of the IoT before the end of 2015. The first element is the recent advent of robust open source protocols (like AllJoyn and WebRTC) that facilitate M2M communication. The second is broad availability of flexible, cost-effective ...
Scott Jenson leads a project called The Physical Web within the Chrome team at Google. Project members are working to take the scalability and openness of the web and use it to talk to the exponentially exploding range of smart devices. Nearly every company today working on the IoT comes up with the same basic solution: use my server and you'll be fine. But if we really believe there will be trillions of these devices, that just can't scale. We need a system that is open a scalable and by using ...