SYS-CON MEDIA Authors: Roberto Medrano, Dmitriy Stepanov, Gilad Parann-Nissany, Srinivasan Sundara Rajan, Sean Houghton

News Feed Item

Foran Completes Winter Exploration Program

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/01/14 -- Foran Mining Corporation (TSX VENTURE:FOM) ("Foran" or the "Company") has completed the previously announced winter exploration program (the "Program") on its McIlvenna Bay and Bigstone properties in east-central Saskatchewan. Exploration activities included initial diamond drilling on Target A, as well as geophysical surveys on both the McIlvenna Bay and Bigstone properties.

Patrick Soares, President and CEO of Foran commented "In the recently completed Program we conducted an initial drill test of Target A. The single hole completed to a depth sufficient to reach the principal conductor appears to have hit a late, potentially crosscutting intrusive unit at our target depth. The results of surface and borehole geophysics continue to point to a strong conductor in this area of similar character and size to that associated with our large McIlvenna Bay deposit". Mr. Soares continued "Although we are disappointed that our initial test did not intersect massive sulphides, Target A remains a high-priority target for further drill testing."

McIlvenna Bay Property

On the McIlvenna Bay property the Program included large loop time-domain electromagnetic ("TDEM") surveying in advance of drilling two diamond drill holes. Borehole electromagnetic ("EM") surveys were also conducted to track the EM response downhole.

Both drill holes were collared from a common platform and designed to test Target A, a group of conductors located approximately 2 kilometres ("km") southeast of the McIlvenna Bay deposit (the "Deposit"). As discussed in the Foran news release dated October 31, 2013, Target A was identified by a regional scale TDEM survey in 2013. Target A has a similar geophysical response to the Deposit, and at 1.6 km in length, is similar in size.

The first hole was abandoned at 211 metres ("m") due to excessive flattening. The second hole was drilled to a depth of 1,683 m and encountered geology consistent with the hangingwall stratigraphy above the McIlvenna Bay deposit, including several key marker units. A felsic fragmental with chlorite-pyrrhotite and a quartz feldspar porphyry ("QFP") body were encountered at the targeted depth of the main conductor. The QFP unit is interpreted to have cut the volcanics and displaced the conductive source at this location. Minor base metal sulphides were observed in hole MR-14-08; however no significant assay values were returned.

Preliminary modelling of the borehole EM survey data indicates a strong off-hole conductor below the trace of the drill hole at approximately 1,200 m downhole. This is interpreted to be the source of the principal Target A conductor.

A total of 17.1 line km of detailed large loop TDEM surveying at 100 m line spacing was conducted over Target A using an HT Squid B-field sensor. Data from this survey was interpreted on site to refine targets in advance of drilling. Borehole EM surveys were conducted with a DigiAtlantis B-field probe at intermediate to final depths on drill hole MR-14-08 to track the EM response downhole. Borehole EM surveying indicates a strong off-hole EM conductor at a downhole depth of approximately 1,200 m with exceptional late-time decay characteristics. This decay profile suggests a source other than graphitic zones, which give early to mid-time EM responses. The final interpretation of this data is in progress, but it is clear that the source of the strong conductor associated with the Target A anomaly remains unexplained and additional drilling to identify the source is warranted.

Table 1. Target A Drillhole data


----------------------------------------------------------------------------
                              Elevation          Azimuth          Dip  Depth
Hole #    Easting   Northing        (m)    UTM (degrees)    (degrees)    (m)
----------------------------------------------------------------------------
MR-14-07  643,594  6,055,490        336            204.8          -70    211
----------------------------------------------------------------------------
MR-14-08  643,594  6,055,490        336            204.8          -77  1,683
----------------------------------------------------------------------------
Total Meterage                                                         1,894
----------------------------------------------------------------------------

Bigstone Property

Foran's Bigstone property, located 10 km west of the McIlvenna Bay property, contains several occurrences of volcanogenic massive sulphide ("VMS") mineralization associated with extensive zinc-rich felsic volcanic stratigraphy. In 1990, past operators estimated an historic mineral resource for the Bigstone deposit of 3.75 million tonnes grading 2.03% Cu and 0.33 g/t Au using a 1.0% Cu cut-off(1).

On the Bigstone property the Program included 45 line km of TDEM surveying over and along strike from the historic resource using an HT Squid B-field sensor. Preliminary interpretation of the survey results indicate the historic resource is effectively defined by the TDEM. Detailed modeling of the survey data will be conducted to delineate targets for drill testing.

(1) Foran is not treating the historic estimate as current; a Qualified Person within the meaning of National Instrument 43-101 has not completed sufficient work to classify the historic estimate as current; additional work, including re-surveying, re-logging and drill core QA/QC would be required to verify and upgrade the historic estimate to current. For additional information see the Foran news release dated Feb. 18, 2014.

About Foran Mining

Foran is a diversified exploration and development company with projects in the Flin Flon Mining Belt. The Company's flagship McIlvenna Bay Deposit, located in east-central Saskatchewan, 65 kilometres west of Flin Flon, Manitoba, is one of the largest undeveloped VMS deposits in Canada.

On March 27, 2013, Foran announced an increased mineral resource estimate for the McIlvenna Bay Deposit, with indicated resources of 13.9 million tonnes grading 1.96% copper equivalent or 13.19% zinc equivalent (1.28% Cu, 2.67% Zn, 0.49 g/t Au, 17 g/t Ag) and an inferred resource of 11.3 million tonnes grading 2.01% copper equivalent or 13.52% zinc equivalent (1.32% Cu, 2.97% Zn, 0.43 g/t Au, 17 g/t Ag). For additional information, see the Foran news release dated March 27, 2013 or the report entitled "Technical Report on the McIlvenna Bay Project, Saskatchewan, Canada" dated December 9, 2011 at www.sedar.com or www.foranmining.com.

As at December 31, 2013 Foran had a treasury of $4.3 million in cash and cash equivalents. Subsequently, on February 11, 2014, the Company announced the closing of a non-brokered flow-through financing for proceeds of $1.2M.

David Fleming, VP Exploration for Foran and a Qualified Person within the meaning of National Instrument 43-101, has reviewed and approved the technical information in this release.

Foran trades on the TSX.V under the symbol "FOM".

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, Foran's objectives, goals or future plans, statements regarding the estimation of mineral resources, exploration results, potential mineralization, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in Foran's public documents filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo – to be held June 9-11, 2015, at the Javits Center in New York City, NY – is now accepting Hackathon proposals. Hackathon sponsorship benefits include general brand exposure and increasing engagement with the developer ecosystem. At Cloud Expo 2014 Silicon Valley, IBM held the Bluemix Developer Playground on November 5 and ElasticBox held the DevOps Hackathon on November 6. Both events took place on the expo fl...
We are reaching the end of the beginning with WebRTC, and real systems using this technology have begun to appear. One challenge that faces every WebRTC deployment (in some form or another) is identity management. For example, if you have an existing service – possibly built on a variety of different PaaS/SaaS offerings – and you want to add real-time communications you are faced with a challenge relating to user management, authentication, authorization, and validation. Service providers will w...
The term culture has had a polarizing effect among DevOps supporters. Some propose that culture change is critical for success with DevOps, but are remiss to define culture. Some talk about a DevOps culture but then reference activities that could lead to culture change and there are those that talk about culture change as a set of behaviors that need to be adopted by those in IT. There is no question that businesses successful in adopting a DevOps mindset have seen departmental culture change, ...
There's Big Data, then there's really Big Data from the Internet of Things. IoT is evolving to include many data possibilities like new types of event, log and network data. The volumes are enormous, generating tens of billions of logs per day, which raise data challenges. Early IoT deployments are relying heavily on both the cloud and managed service providers to navigate these challenges. In her session at Big Data Expo®, Hannah Smalltree, Director at Treasure Data, discussed how IoT, Big D...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
The security devil is always in the details of the attack: the ones you've endured, the ones you prepare yourself to fend off, and the ones that, you fear, will catch you completely unaware and defenseless. The Internet of Things (IoT) is nothing if not an endless proliferation of details. It's the vision of a world in which continuous Internet connectivity and addressability is embedded into a growing range of human artifacts, into the natural world, and even into our smartphones, appliances, a...
The Internet of Things will put IT to its ultimate test by creating infinite new opportunities to digitize products and services, generate and analyze new data to improve customer satisfaction, and discover new ways to gain a competitive advantage across nearly every industry. In order to help corporate business units to capitalize on the rapidly evolving IoT opportunities, IT must stand up to a new set of challenges. In his session at @ThingsExpo, Jeff Kaplan, Managing Director of THINKstrateg...
Fundamentally, SDN is still mostly about network plumbing. While plumbing may be useful to tinker with, what you can do with your plumbing is far more intriguing. A rigid interpretation of SDN confines it to Layers 2 and 3, and that's reasonable. But SDN opens opportunities for novel constructions in Layers 4 to 7 that solve real operational problems in data centers. "Data center," in fact, might become anachronistic - data is everywhere, constantly on the move, seemingly always overflowing. Net...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
The 3rd International Internet of @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that its Call for Papers is now open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.