SYS-CON MEDIA Authors: Srinivasan Sundara Rajan, Pat Romanski, Elizabeth White, Yeshim Deniz, Andreas Grabner

News Feed Item

Petro One Books 124,800 bbl Reserves at J5 Milton

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/08/14 -- Petro One Energy Corp. (TSX VENTURE: POP)(PINKSHEETS: CUDBF) (FRANKFURT: C6K1) and Goldstrike Resources Ltd. (TSX VENTURE: GSR) (PINKSHEETS: APRAF) (FRANKFURT: KCG1) are pleased to report that based on existing production from two vertical wells, McDaniel and Associates Consultants Ltd. has estimated Petro One's gross proved plus probable NI 51-101 reserves on Section 15 of its J5 Milton Saskatchewan property at 124,800 bbl of light Viking oil, including 23,700 bbl of proved reserves and 101,100 bbl of probable.

The recent reserves estimate has been based on two producing wells of the five wells drilled at Milton to date and two undeveloped locations. Two wells are currently on production and, based on results from Well 10A-15 in particular, Petro One's technical team has recommended that Well 6A-15 be re-opened and tested with a view to doing the same with at least one other previously drilled well if water cuts and gas volumes have gone down as projected. In addition, management has identified 45 horizontal Viking net drilling locations on the Milton property, with the potential to substantially add to the Company's production and reserves. Core from 15-15-30 -27W3 shows that the Viking sand on the property is thick, with a strong oil show over 10 metres, and that the reservoir quality is excellent, with an average porosity of 21.7% and an average permeability of 16.89 mD.

Twelve horizontal wells recently drilled in the new Marengo Viking oil field located just 3.2 kilometres south of Petro One's Milton property had a 100% success rate, with three month initial production rates that ranged up to 75.5 bopd, and averaged 56.2 bopd of largely water-free oil based on information published by the Saskatchewan government. Petro One's independent consulting engineers have recommended horizontal drilling based on the thickness and continuity of the Viking sand on Petro One's property. McDaniel has recognized probable undeveloped reserves for two horizontal locations in section 15 based on analogy to offsetting developments. A successful horizontal well would add significantly to the Company's reserve base and set the stage for multi well development drill program. Petro One is engaged in discussions for such a program with several companies that have expressed interest in the property.

"We are excited that long-term stable production has been achieved from our 10A-15 well, with an 9 month average netback of $46.84/bbl for the period ending January 31, 2014", said Petro One President Peter Bryant. "We have identified 45 net drill locations on three sections of prime Viking land that provide an excellent opportunity to grow production and reserves with the drill bit. These locations are in a thicker part of the formation only two miles north of the new Marengo field.

There is currently a tremendous amount of interest in Western Canadian oil properties, and the Fraser Institute has rated Saskatchewan as the third best jurisdiction in the world for oil investment. As a result, Petro One has received numerous expressions of interest from a variety of senior companies on many of its properties, discussions are under way, and the Company is considering a wide range of possibilities on how best to exploit our assets."

Pursuant to clause 5.8 of NI 51-101, Petro One advises that the estimates of reserves for individual properties may not reflect the same confidence level as estimates of reserves and future net revenue for all properties, due to the effects of aggregation. In addition, Petro One refers readers to Petro One's news release issued June 24, 2013 regarding its other proven and probable reserves (1,000 bbl proved and 99,000 probable at J10 Bromhead as of April 30, 3013).

Pursuant to clause 5.7 of NI 51-101, Petro One advises that McDaniel and Associates Consultants Ltd. has consented to the disclosure of the reserves information contained in this news release and to disclosure of its identity as the qualified reserves evaluator having prepared the estimate of reserves, and has advised Petro One that:


i.   the effective date of the estimate is April 30, 2014;
ii.  the estimate was prepared by a qualified reserves evaluator;
iii. the estimate was prepared in accordance with the COGE Handbook;
iv.  the estimate was prepared assuming the development of J5 Milton without
     regard to the availability to Petro One of funding required for that
     development.

POP/GSR J4 South Reston well, Manitoba

The SR-1 wildcat at South Reston, Manitoba (5-17-6-26W1) remains standing, pending further testing. This vertical well was drilled as a joint venture by Petro One and Goldstrike and was successful in intersecting a large Waulsortian Mound in the Lodgepole Formation with a strong oil show over a 20 metre interval at the top of the structure. Cuttings from 790 to 810 metres drill depth had medium brown oil stain, vivid fluorescence and fluorescent cut, and emitted a strong petroliferous odour during sample wash. Reservoir parameters calculated by an independent petrophysicist are 17 metres net pay, 10.34 per cent porosity, 50.89 per cent water saturation, and 0.63 mD permeability.

Petro One has recently received expressions of interest in this property, and management is of the view that a farmout is the preferred way to test the economic potential of the property. Having secured their interests in the property, Petro One and Goldstrike will have the ability to conduct further production testing in the future if a deal is not concluded with one of the prospective farmees.

POP/GSR J5 Milton Saskatchewan

On the advice of Petro One's technical team, and having regard to the referenced expressions of interest, Petro One and Goldstrike have agreed to defer completion of Well #SR1 for the time being and forego drilling a test well at Kirkella in favour of a lower risk, lower cost target at Petro One's J5 Milton property, which was originally designated as the third stage of the joint venture (news release dated November 26, 2013).

Petro One's 10A-15-30 -27W3 discovery well is currently producing at approximately 22.5 barrels of oil per day (bopd) from the Viking, and has produced over 10,000 bbl of oil since July, 2011. The consulting engineers have stated that the decline curve for this well has flattened out, and it is projected to continue producing at a similar rate for several years. The production history of this well has demonstrated that the Lower Viking conglomerate in this area is an underpressured reservoir with a strong gas drive, and limited water that is drawn down by continuous production, reducing the water cut to as low as 65%. Based on this evidence the Petro One technical team has recommended re-opening the suspended wells on the property, starting with 6A-15.

A three month production test is therefore planned for 6A-15-30 -27W3 starting June 1, 2014. This well initially flowed only gas and water to surface, but oil production rose steadily over a two month to 7.4 bopd over a 48 day period, and the water cut dropped from 97 to 85.7% before it was suspended. The gas drive is now believed to be at a level that is amenable to oil production. The 6A-15 well is located 560 metres southwest of the 10A-15 producer. The two wells are at approximately the same structural elevation, and an initial pressure test showed that they are connected to the same reservoir, making the 6A-15 well a prime candidate for additional production. If re-opening the 6A-15 well proves successful, it will add materially to Petro One's oil production and reserves, and opens the door to re-starting the other suspended wells, providing for significant upside.

To date, Petro One and Goldstrike have incurred expenses of $210,000 and $502,000 respectively in drilling, testing and partially completing Well #SR1,and the cost of drilling and completing a well at Kirkella has been estimated at approximately, $860,000 whereas the cost of re-opening and testing Well 6A-15 at Milton is estimated to be only $55,000 and, assuming success, the cost of equipping the well is estimated to be only an additional $170,000. Since Well 6A-15 has already been drilled and completed by Petro One, under the joint venture terms, Goldstrike will pay 100% of the testing and equipping costs to earn a 50% working interest in that well. Work is scheduled to commence on June 1, 2014. If Petro One determines to re-open another of its previously drilled wells at Milton, Goldstrike will have the option to earn a 50% working interest in that well on the same terms. Goldstrike will also have a two year option to earn a 50% working interest in one horizontal or one vertical well at one of several named locations to be specified by Petro One at Milton, in either case by paying 100% of all costs relating to such well. If it elects a vertical well, will have the right to drill up to three additional vertical wells.

Goldstrike will also retain the right for two years to complete Well #SR1 at South Reston and, as contemplated by the joint venture agreement, the right to drill option wells at South Reston if Well #SR1 is brought into production by Goldstrike.

To ensure that Petro One has the ability to deal with the entirety of the South Reston and/or Milton property as a package for a financial partner or purchaser, Goldstrike has agreed that Petro One will have the right to sell or farm-out any portion of South Reston or Milton to a third party during the option period. If it does so, Goldstrike will be entitled, in lieu of its right to drill additional wells, to 10% of any cash (or equivalent) paid to Petro One, 50% of any royalty payable to Petro One and/or 50% of Petro One's post-closing working interest in the first well (in addition to Well #SR1) at South Reston or Milton, as the case may be.

NATIONAL INSTRUMENT 51-101 DISCLOSURE

BOE means barrels of oil equivalent. It may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf:1 bbl is based on an energy equivalency conversion method primarily applicable at the burner tip, and does not represent a value equivalency at the wellhead.

Oil production during a period is generally expressed in terms of "barrels per day" ("bbl" or "BBL"), which indicates the total oil produced during a period divided by the number of hours that the well was in production during that period. "Barrels per day" is indicative of flow rate while a well is in production and does not mean that such well was in constant production during such period.

Proved reserves are those reserves that can be estimated with a high degree of certainty to be recoverable. It is likely that the actual remaining quantities recovered will exceed the estimated proved reserves.

Probable reserves are those additional reserves that are less certain to be recovered than proved reserves. It is equally likely that the actual remaining quantities recovered will be greater or less than the sum of the estimated proved plus probable reserves.

Pursuant to s. 5.8 of NI 51-101, the Company advises that reserves disclosed in this release are credited to section 15 of the Milton property and that the Company has other oil and gas properties, and, therefore, that the estimates of reserves and future net revenue for individual properties may not reflect the same confidence level as estimates of reserves for all properties, due to the effects of aggregation.

ON BEHALF OF THE BOARD

PETRO ONE ENERGY CORP.

Peter Bryant, President & Director

ON BEHALF OF THE BOARD

GOLDSTRIKE RESOURCES LTD.

Terrence E. King, President & Director

For further information, please visit the company's website at www.PetroOneEnergy.com, follow the Company's tweets at www.Twitter.com/PetroOneEnergy and contact Jeff Stuart of King James Capital Corporation, handling Investor Relations for the Company, by telephone at (604) 805 0375 or by email at [email protected].

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Certain statements contained herein constitute forward-looking statements or information (collectively "forward-looking statements") within the meaning of applicable securities legislation, including, but not limited to management's assessment of future plans and operations, including: drilling plans and potential locations; expected production levels; development plans; reserves growth; production and operating sales and expenses; reservoir characteristics; the results of applying certain operational development techniques; certain economic factors; and capital expenditures.

Forward looking statements are typically identified by words such as "anticipate", "estimate", "expect", "forecast", "may", "will", "project" and similar words suggesting future events or performance or may be identified by reference to a future date. In addition, statements relating to oil and gas reserves and resources are deemed to be forward-looking statements as they involve the implied assessment, based on certain estimates and assumptions, that the reserves or resources described, as the case may be, exist in the quantities predicted or estimated and can be profitably produced in the future. With respect to forward looking statements herein, the Company has made assumptions regarding, among other things; future capital expenditure levels; future oil and natural gas prices; ability to obtain equipment and services in a timely manner to carry out development activities; ability to market oil and natural gas successfully to current and new customers; the ability to obtain financing on acceptable terms; and the ability to add production and reserves through development and exploitation activities. Although the Company believes that the expectations reflected in the forward-looking statements contained herein, and the assumptions on which such forward-looking statements are made, are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking statements included herein, as there can be no assurance that the plans, intentions or expectations upon which the forward-looking statements are based will occur. By their nature, forward-looking statements involve numerous risks and uncertainties that contribute to the possibility that the forward-looking statements will not occur, which may cause the Company's actual performance and financial results in future periods to differ materially from any estimates or projections. The forward-looking statements contained herein are made as of the date hereof. The Company does not undertake any obligation to, nor does it intend to, publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The forward-looking statements contained herein are expressly qualified by this cautionary statement. In addition, readers are cautioned that historical results are not necessarily indicative of future performance.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
“The year of the cloud – we have no idea when it's really happening but we think it's happening now. For those technology providers like Zentera that are helping enterprises move to the cloud - it's been fun to watch," noted Mike Loftus, VP Product Management and Marketing at Zentera Systems, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
BMC Software plans to acquire assets of CDB Software, Inc., a mainframe data management company that has developed utilities for managing IBM DB2 databases with virtually no outage. Focusing on the availability of mission-critical applications is strategic for BMC as it continues to help its customers transform IT into a competitive advantage for their business. CDB's technology complements BMC's existing mainframe data management portfolio, which includes software utilities for DB2 administrat...
The Internet of Things (IoT) promises to evolve the way the world does business; however, understanding how to apply it to your company can be a mystery. Most people struggle with understanding the potential business uses or tend to get caught up in the technology, resulting in solutions that fail to meet even minimum business goals. In his session at @ThingsExpo, Jesse Shiah, CEO / President / Co-Founder of AgilePoint Inc., showed what is needed to leverage the IoT to transform your business. ...
IoT is still a vague buzzword for many people. In his session at @ThingsExpo, Mike Kavis, Vice President & Principal Cloud Architect at Cloud Technology Partners, discussed the business value of IoT that goes far beyond the general public's perception that IoT is all about wearables and home consumer services. He also discussed how IoT is perceived by investors and how venture capitalist access this space. Other topics discussed were barriers to success, what is new, what is old, and what th...
The Internet of Things (IoT) is rapidly in the process of breaking from its heretofore relatively obscure enterprise applications (such as plant floor control and supply chain management) and going mainstream into the consumer space. More and more creative folks are interconnecting everyday products such as household items, mobile devices, appliances and cars, and unleashing new and imaginative scenarios. We are seeing a lot of excitement around applications in home automation, personal fitness,...
"ElasticBox is an enterprise company that makes it very easy for developers and IT ops to collaborate to develop, build and deploy applications on any cloud - private, public or hybrid," stated Monish Sharma, VP of Customer Success at ElasticBox, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Dale Kim is the Director of Industry Solutions at MapR. His background includes a variety of technical and management roles at information technology companies. While his experience includes work with relational databases, much of his career pertains to non-relational data in the areas of search, content management, and NoSQL, and includes senior roles in technical marketing, sales engineering, and support engineering. Dale holds an MBA from Santa Clara University, and a BA in Computer Science f...
Software AG and Wipro Ltd. have announced a joint solution platform for streaming analytics that provides real-time actionable intelligence for the Internet of Things (IoT) market. “The key to successfully addressing the IoT market is the ability to rapidly build and evolve apps that tap into, analyze and make smart decisions on fast, big data”, said John Bates, Global Head of Industry Solutions and CMO, Software AG. To address the huge market potential created by streaming analytics in conj...
OneCloud Software has launched the OneCloud Partner Program. Responding to demand from prospective partners, the Program offers managed service providers (MSPs) and resellers the resources they need to grow their business with the OneCloud Recovery solution. OneCloud Recovery is an automated solution for disaster recovery/business continuity (DR/BC), which leverages Amazon Web Services as the disaster recovery site. “This is a tremendous opportunity with an innovative hybrid cloud-based DR pro...
Cloud Technology Partners on Wednesday announced it has been recognized by the Modern Infrastructure Impact Awards as one of the Best Amazon Web Services (AWS) Consulting Partners. Selected by the editors of TechTarget's SearchDataCenter.com, and by votes from customers and strategic channel partners, the companies acknowledged by the Modern Infrastructure Impact Awards represent the top providers of cloud consulting services for AWS including application migration, application development, inf...
MapR Technologies on Tuesday announced the availability of free Hadoop On-Demand Training for developers, analysts and administrators which represents a $50M in-kind contribution* to the broad Hadoop community. The Hadoop training program is a multi-course curriculum designed to expand worldwide adoption of Hadoop technology. The curriculum provides engaging and interactive video lessons, hands-on exercises, labs and quizzes, enabling professionals to acquire valuable Hadoop skills and knowledge...
“We help people build clusters, in the classical sense of the cluster. We help people put a full stack on top of every single one of those machines. We do the full bare metal install," explained Greg Bruno, Vice President of Engineering and co-founder of StackIQ, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Axios Systems on Tuesday announced it has selected CenturyLink Cloud as the hosting platform for Axios Systems’ IT Service Management (ITSM) solutions in Canada. CenturyLink, a global provider of communications and IT services, joins other leading technology providers across North America, Europe and APAC to help Axios’ international customers drive efficiencies and innovation across their service management provision. The arrangement with CenturyLink enables Axios to further strengthen its pres...
"People are a lot more knowledgeable about APIs now. There are two types of people who work with APIs - IT people who want to use APIs for something internal and the product managers who want to do something outside APIs for people to connect to them," explained Roberto Medrano, Executive Vice President at SOA Software, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
"Blue Box has been around for 10-11 years, and last year we launched Blue Box Cloud. We like the term 'Private Cloud as a Service' because we think that embodies what we are launching as a product - it's a managed hosted private cloud," explained Giles Frith, Vice President of Customer Operations at Blue Box, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.