Click here to close now.

SYS-CON MEDIA Authors: Liz McMillan, Dana Gardner, Elizabeth White, Carmen Gonzalez, PagerDuty Blog

News Feed Item

Maya Gold & Silver Announces First Mineral Reserves at Zgounder Silver Mine and Files a Pre-Feasibility Study (PFS)

BLAINVILLE, QUEBEC -- (Marketwired) -- 05/22/14 -- Maya Gold & Silver Inc. ("Maya" or the "Corporation") (TSX VENTURE: MYA) announces that it has filed on SEDAR today the Pre-Feasibility Study ("PFS") for its Zgounder Silver Mine in Morocco. The results from the PFS demonstrate the economic viability of the Zgounder Mine based on the mineral reserves derived from resources that were outlined by GoldMinds Geoservices Inc. The PFS highlighted that a significant amount of inferred resources are present which have the potential to be converted to reserves with additional drilling, and there remains an excellent exploration potential to further expand the size of the existing mineral inventory. The PFS also provided a more conservative estimate of profitability than the Preliminary Economic Assessment (PEA) due to the exclusion of the inferred resources; conversely, thereby the PFS provides estimates that have a lower geological risk, which is key element for financing purposes.

Highlights of the Zgounder Silver Mine PFS Study include:


--  An anticipated mine life of 6 years with the current reserves with
    Internal rate of return of 128 per cent;

--  First year silver production of 582,600 ounces, followed by two years at
    885,400 ounces, and the final three years at 914,000 ounces per year;

--  Mill feed grade estimated at 317 g/t Ag;

--  Total operating cost of USD109.50 per tonne (averaged over the expected
    mine's life);

--  Additional capex requirements total USD3.8 million, which include the
    proposed concentrator expansion;

--  Net present value of USD27.9 million (discounted at 6.5 per cent) at
    silver price of USD20.50 per ounce;

--  The Zgounder PFS was prepared as a strictly underground mine based
    solely on the measured and indicated mineral resources reported on
    February 19, 2014.


               Mineral Reserve Estimate as at March 21st, 2014
----------------------------------------------------------------------------
         Proven                 Probable              Proven + Probable
----------------------------------------------------------------------------
         Ag                       Ag                         Ag
 Tonnes  g/t   Ounces    Tonnes   g/t   Ounces     Tonnes   g/t     Ounces
----------------------------------------------------------------------------
152,000  281  1,371,000  421,000  330  4,474,000  573,000  317.3  5,845,000
----------------------------------------------------------------------------

Notes:

The reserves have been estimated in accordance with the definitions and guidelines adopted from the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Standards on Mineral Resources and Reserves). The reserves are based entirely on measured and indicated resources and were converted as probable and proven respectively. Since the material is from underground mining operations, the cut-off grade includes the costs of production, processing and the general & administration (G&A).

Parameters of cut-off grade estimation (the exchange rate has been set at 7.63 MAD = $1.00, as of December 29, 2013.)


                     ----------------------------------
                     Parameters          Unit      Data
                     ----------------------------------
                     Mining             USD/t     32.79
                     Mining dilution        %     10.00
                     Development        USD/t     10.79
                     Processing         USD/t     45.89
                     G&A                USD/t      8.54
                     Metal price       USD/oz     20.50
                     Metal price          U/g      0.66
                     Process recovery       %      0.90
                     Cut-off grade        g/t       166
                     ----------------------------------

Details of the mineral resource estimate and the previously completed Preliminary Economic Assessment (PEA) can be found in the Company's new release dated March 5 th, 2014 which has been filed and is available for viewing and download on www.sedar.com or on Maya's website (http://mayagoldsilver.com/wp-content/uploads/2014/03/2014-19-03_MayaPEA_Final-Report.pdf). It is clear that the results of the PEA are significantly better than those presented herein due to the exclusion of the inferred resources. Maya anticipates that further drilling of the deposit could convert a significant portion of the inferred tonnage and potential structures into mineral resources of better categories and translate into additional years of production and revenue.

Additional to the mineral resource and reserves described herein and within previous press releases, a Mineral Potential between 1.5 to 2.0 million tonnes grading 300 to 400 g/t Ag has been estimated. The "Mineral Potential" is the tonnage which could be contained between elevations 1975 and 1750 (225m vertical panel) along the existing mine openings. This represents the historical amount processed by the previous operator plus the current NI 43-101 mineral resource disclosure between the surface and level 1925. It does not consider the eastern extension (276400E) where surface medieval workings extent for another 200 meters eastward with no drilling beneath. The potential quantity and grade reported as "Mineral Potential", is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource.

The report, titled "NI 43-101 Technical Report, Pre-Feasibility Study of the Zgounder Silver Deposit, Kingdom of Morocco" is dated May 16, 2014 with an effective date of March 21, 2014. It was prepared in conformity with NI 43-101 by Claude Duplessis, Eng. of Goldminds Geoservices Inc. and Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. of SGS Canada Inc.; each is an "Independent Qualified Person" under NI 43-101.

Qualified Persons

The technical content of this news release has been reviewed by Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. from SGS Canada Inc. and by Claude Duplessis Eng. Sr. Geological Engineer from GoldMinds Geoservices Inc.: all independent Qualified Persons under NI 43-101 standards.

ABOUT MAYA

Maya Gold & Silver Inc. is a Canadian listed mining focused on the exploration and development of gold and silver deposits in Morocco. Maya recently initiated mining at its Zgounder Mine. The Corporation's shares trade on the TSX Venture Exchange under the symbol "MYA".

For further information on Maya visit www.mayagoldsilver.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production and the uncertainty of the availability of capital). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

Contacts:
Maya Gold & Silver Inc.
Guy Goulet
Chief Executive Officer
450-435-0700 ext. 204

Nathalie Dion
Investor Relations
450-435-0700 ext. 202

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Media announced today that @WebRTCSummit Blog, the largest WebRTC resource in the world, has been launched. @WebRTCSummit Blog offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. @WebRTCSummit Blog can be bookmarked ▸ Here @WebRTCSummit conference site can be bookmarked ▸ Here
SYS-CON Events announced today that Cisco, the worldwide leader in IT that transforms how people connect, communicate and collaborate, has been named “Gold Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Cisco makes amazing things happen by connecting the unconnected. Cisco has shaped the future of the Internet by becoming the worldwide leader in transforming how people connect, communicate and collaborat...
WSM International is launching a DevOps services division that offers assessment, consulting and implementation to large enterprises and organizations with complex infrastructures. This is the first independent services company to create a dedicated practice to help organizations looking to transition to the DevOps model. The concept of DevOps is to blend information technology (IT) software development with operations to optimize the computing infrastructure according to the specific needs of ...
SYS-CON Events announced today that the DevOps Institute has been named “Association Sponsor” of SYS-CON's DevOps Summit, which will take place on June 9–11, 2015, at the Javits Center in New York City, NY. The DevOps Institute provides enterprise level training and certification. Working with thought leaders from the DevOps community, the IT Service Management field and the IT training market, the DevOps Institute is setting the standard in quality for DevOps education and training.
SYS-CON Events announced today that robomq.io will exhibit at SYS-CON's @ThingsExpo, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. robomq.io is an interoperable and composable platform that connects any device to any application. It helps systems integrators and the solution providers build new and innovative products and service for industries requiring monitoring or intelligence from devices and sensors.
Temasys has announced senior management additions to its team. Joining are David Holloway as Vice President of Commercial and Nadine Yap as Vice President of Product. Over the past 12 months Temasys has doubled in size as it adds new customers and expands the development of its Skylink platform. Skylink leads the charge to move WebRTC, traditionally seen as a desktop, browser based technology, to become a ubiquitous web communications technology on web and mobile, as well as Internet of Things...
Wearable technology was dominant at this year’s International Consumer Electronics Show (CES) , and MWC was no exception to this trend. New versions of favorites, such as the Samsung Gear (three new products were released: the Gear 2, the Gear 2 Neo and the Gear Fit), shared the limelight with new wearables like Pebble Time Steel (the new premium version of the company’s previously released smartwatch) and the LG Watch Urbane. The most dramatic difference at MWC was an emphasis on presenting we...
Hosted PaaS providers have given independent developers and startups huge advantages in efficiency and reduced time-to-market over their more process-bound counterparts in enterprises. Software frameworks are now available that allow enterprise IT departments to provide these same advantages for developers in their own organization. In his workshop session at DevOps Summit, Troy Topnik, ActiveState’s Technical Product Manager, will show how on-prem or cloud-hosted Private PaaS can enable organ...
Today, IT is not just a cost center. IT is an enabler and driver of business. With the emergence of the hybrid cloud paradigm, IT now has increasingly more capabilities to create new strategic opportunities for a business. Hybrid cloud allows an organization to utilize multi-tenant public clouds, dedicated private clouds, bare metal hosting, and the associated support and services for the right use cases through an on-demand, XaaS model. This model of IT creates tremendous opportunities for busi...
Docker is an excellent platform for organizations interested in running microservices. It offers portability and consistency between development and production environments, quick provisioning times, and a simple way to isolate services. In his session at DevOps Summit at 16th Cloud Expo, Shannon Williams, co-founder of Rancher Labs, will walk through these and other benefits of using Docker to run microservices, and provide an overview of RancherOS, a minimalist distribution of Linux designed...
Business as usual for IT is evolving into a “Make or Buy” decision on a service-by-service conversation with input from the LOBs. How does your organization move forward with cloud? In his general session at 16th Cloud Expo, Paul Maravei, Regional Sales Manager, Hybrid Cloud and Managed Services at Cisco, discusses how Cisco and its partners offer a market-leading portfolio and ecosystem of cloud infrastructure and application services that allow you to uniquely and securely combine cloud busi...
SYS-CON Events announced today that Akana, formerly SOA Software, has been named “Bronze Sponsor” of SYS-CON's 16th International Cloud Expo® New York, which will take place June 9-11, 2015, at the Javits Center in New York City, NY. Akana’s comprehensive suite of API Management, API Security, Integrated SOA Governance, and Cloud Integration solutions helps businesses accelerate digital transformation by securely extending their reach across multiple channels – mobile, cloud and Internet of Thi...
Businesses are looking to empower employees and departments to do more, go faster, and streamline their processes. For all workers – but mobile workers especially – utilizing the cloud to reconnect documents and improve processes without destructing existing workflows can have a dramatic impact on productivity. In his session at 16th Cloud Expo, Mark Grilli, vice president of Acrobat Solutions marketing at Adobe Systems Incorporated, will outline new ways that the cloud is changing the way peo...
SYS-CON Events announced today that Vitria Technology, Inc. will exhibit at SYS-CON’s @ThingsExpo, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Vitria will showcase the company’s new IoT Analytics Platform through live demonstrations at booth #330. Vitria’s IoT Analytics Platform, fully integrated and powered by an operational intelligence engine, enables customers to rapidly build and operationalize advanced analytics to deliver timely business outcomes ...
Are your applications getting in the way of your business strategy? It’s time to rethink your IT approach. In his session at 16th Cloud Expo, Madhukar Kumar, Vice President, Product Management at Liaison Technologies, will discuss a new data-centric approach to IT that allows your data, not applications, to inform business strategy. By moving away from an application-centric IT model where data integration and analysis are subservient to the constraints of applications, your organization will b...