SYS-CON MEDIA Authors: Roberto Medrano, Dmitriy Stepanov, Gilad Parann-Nissany, Srinivasan Sundara Rajan, Sean Houghton

News Feed Item

Crocodile Gold Files Technical Reports for Fosterville and Cosmo Gold Mines and Provides Annual General Meeting Information

TORONTO, ONTARIO -- (Marketwired) -- 05/27/14 -- Crocodile Gold Corp. (TSX: CRK)(OTCQX: CROCF)(FRANKFURT: XGC) ("Crocodile Gold" or the "Company) has filed technical reports prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") for the Fosterville Gold Mine and the Cosmo Gold Mine. These filings are in support of the May 21, 2014 news release which outlined the updates to the estimated Mineral Reserves and Mineral Resources of the operating mines.

The Technical Reports are available on SEDAR at www.sedar.com and on Crocodile Gold's website at www.crocgold.com.

Highlights from the Technical Reports included:


--  Fosterville Gold Mine had a positve 30% increase in total estimated
    Measured and Indicated Mineral Resources of 16.6 million tonnes at 3.87
    g/t Au for 2.1 million ounces of gold and had an 84% increase in
    Inferred Mineral Resources of 6.4 million tonnes at 3.78 g/t Au for
    777,000 ounces of gold.

--  Cosmo Gold Mine had a positive increase of 69% in the Measured Mineral
    Resources category and a total increase of 4% in the total Measured and
    Indicated Mineral Resources categories of 4.5 million tonnes at 3.43 g/t
    Au for 500,000 ounces of gold.

At Fosterville, drilling in 2013 was focused on near term targets in the Central and Harrier Areas and resulted in the successful delineation of zones of mineralization that have led to growth in total Measured and Indicated Mineral Resources to over 2 million ounces of gold. This increase in Mineral Resources has extended the current Life of Mine plan and an infill drilling program is planned for 2014 to further increase the Mineral Reserves at Fosterville.

At Cosmo, the Mineral Resources reported are contained within both the Eastern and Western Lodes of the deposit. Drilling in 2013 was focused on near-term targets and was successful in increasing the Mineral Resources to 500,000 ounces of gold in the Measured and Indicated categories, while the mine also produced 57,500 ounces since June 2013. These positive changes to the resources demonstrate a better understanding of the mineralized structures and a 2014 exploration drilling programs will focus on the down plunge extent of the deposit to potentially expand mineral resources.

A full summary of the Mineral Reserve and Resource update is included in Tables 1 through 5 at the end of this release.

Annual General Meeting Information

Crocodile Gold will be holding its Annual General Meeting on June 5th at 10:00am ET at the Sheraton Centre Toronto Hotel in the Kent Room.

The Company will be webcasting the AGM and has provided a link for interested parties to register for the event on the Crocodile Gold home page. Please visit www.crocgold.com/investors/events for more details.

Notes/Technical Disclosure/Disclaimers

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Environmental, permitting, legal, title, taxation, socio political, marketing, or other relevant issues may materially affect the estimates of Mineral Resources.

The quantity and grade of reported Inferred Mineral Resources in the above estimations are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.

The reports supporting the Mineral Resource and Reserve outlined in this press release will be filed concurrently under the titles: REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE FOSTERVILLE GOLD MINE VICTORIA, AUSTRALIA dated December 31, 2013 and prepared by Troy Fuller, MAIG, and Geology Manager, Fosterville Gold Mine; Simon Hitchman, FAusIMM, Exploration Manager, Victoria and Murray Smith, MAusIMM and Principal Mining Consultant of Mining Plus Pty LTD. REPORT ON THE MINERAL RESOURCES & MINERAL RESERVES OF THE COSMO DEEPS GOLD PROJECT In the Northern Territory, Australia dated December 31, 2013 and prepared by Craig Pridmore, MAusIMM, and Geology Manager of Crocodile Gold Corp. and Murray Smith, MAusIMM, and Principal Mining Consultant of Mining Plus Pty LTD.

Qualified Person

F. W. Nielsen, P.Geo, Technical Consultant to Crocodile Gold, is a "qualified person" as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data included in this press release.

About Crocodile Gold

Crocodile Gold is a Canadian gold mining and exploration company with three operating mines in the Northern Territory and the State of Victoria, Australia. The Company has a combined land package in excess of 4,000 sq. km. The objective of Crocodile Gold is to continue production from its three operating mines, Cosmo, Stawell and Fosterville, while also advancing development programs to further organic growth. For additional information, please visit our website www.crocgold.com.

Follow us on Twitter @crocgold_crk or Facebook facebook.com/CrocodileGoldCorp.

Cautionary Note

Certain information set forth in this press release contains "forward-looking statements", and "forward-looking information under applicable securities laws. Except for statements of historical fact, certain information contained herein constitutes forward-looking statements, which include the Company's expectations for future performance based on current drill results and past production, expected gold prices, and mineral resource and mineral reserve estimates, and are based on Crocodile Gold's current internal expectations, estimates, projections, assumptions and beliefs, which may prove to be incorrect. Some of the forward-looking statements may be identified by words such as "expects" "anticipates", "believes", "projects", "plans", and similar expressions. These statements are not guarantees of future performance and undue reliance should not be placed on them. Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Crocodile Gold's actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to: liabilities inherent in mine development and production; geological, mining and processing technical problems; Crocodile Gold's inability to obtain required mine licences, mine permits and regulatory approvals required in connection with mining and mineral processing operations; competition for, among other things, capital, acquisitions of reserves, undeveloped lands and skilled personnel; incorrect assessments of the value of acquisitions; changes in commodity prices and exchange rates; currency and interest rate fluctuations; various events that could disrupt operations and/or the transportation of mineral products, including labour stoppages and severe weather conditions; the demand for and availability of rail, port and other transportation services; the ability to secure adequate financing and management's ability to anticipate and manage the foregoing factors and risks. There can be no assurance that forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Crocodile Gold undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

To view the tables associated with this press release, please visit the following link: http://media3.marketwire.com/docs/948428Tables.pdf.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today Isomorphic Software, the global leader in high-end, web-based business applications, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Isomorphic Software is the global leader in high-end, web-based business applications. We develop, market, and support the SmartClient & Smart GWT HTML5/Ajax platform, combining the productivity and performance of traditional desktop software ...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo – to be held June 9-11, 2015, at the Javits Center in New York City, NY – is now accepting Hackathon proposals. Hackathon sponsorship benefits include general brand exposure and increasing engagement with the developer ecosystem. At Cloud Expo 2014 Silicon Valley, IBM held the Bluemix Developer Playground on November 5 and ElasticBox held the DevOps Hackathon on November 6. Both events took place on the expo fl...
We are reaching the end of the beginning with WebRTC, and real systems using this technology have begun to appear. One challenge that faces every WebRTC deployment (in some form or another) is identity management. For example, if you have an existing service – possibly built on a variety of different PaaS/SaaS offerings – and you want to add real-time communications you are faced with a challenge relating to user management, authentication, authorization, and validation. Service providers will w...
The term culture has had a polarizing effect among DevOps supporters. Some propose that culture change is critical for success with DevOps, but are remiss to define culture. Some talk about a DevOps culture but then reference activities that could lead to culture change and there are those that talk about culture change as a set of behaviors that need to be adopted by those in IT. There is no question that businesses successful in adopting a DevOps mindset have seen departmental culture change, ...
There's Big Data, then there's really Big Data from the Internet of Things. IoT is evolving to include many data possibilities like new types of event, log and network data. The volumes are enormous, generating tens of billions of logs per day, which raise data challenges. Early IoT deployments are relying heavily on both the cloud and managed service providers to navigate these challenges. In her session at Big Data Expo®, Hannah Smalltree, Director at Treasure Data, discussed how IoT, Big D...
The Internet of Things is tied together with a thin strand that is known as time. Coincidentally, at the core of nearly all data analytics is a timestamp. When working with time series data there are a few core principles that everyone should consider, especially across datasets where time is the common boundary. In his session at Internet of @ThingsExpo, Jim Scott, Director of Enterprise Strategy & Architecture at MapR Technologies, discussed single-value, geo-spatial, and log time series dat...
The Internet of Things promises to transform businesses (and lives), but navigating the business and technical path to success can be difficult to understand. In his session at @ThingsExpo, Sean Lorenz, Technical Product Manager for Xively at LogMeIn, demonstrated how to approach creating broadly successful connected customer solutions using real world business transformation studies including New England BioLabs and more.
The security devil is always in the details of the attack: the ones you've endured, the ones you prepare yourself to fend off, and the ones that, you fear, will catch you completely unaware and defenseless. The Internet of Things (IoT) is nothing if not an endless proliferation of details. It's the vision of a world in which continuous Internet connectivity and addressability is embedded into a growing range of human artifacts, into the natural world, and even into our smartphones, appliances, a...
Fundamentally, SDN is still mostly about network plumbing. While plumbing may be useful to tinker with, what you can do with your plumbing is far more intriguing. A rigid interpretation of SDN confines it to Layers 2 and 3, and that's reasonable. But SDN opens opportunities for novel constructions in Layers 4 to 7 that solve real operational problems in data centers. "Data center," in fact, might become anachronistic - data is everywhere, constantly on the move, seemingly always overflowing. Net...
The Internet of Things will put IT to its ultimate test by creating infinite new opportunities to digitize products and services, generate and analyze new data to improve customer satisfaction, and discover new ways to gain a competitive advantage across nearly every industry. In order to help corporate business units to capitalize on the rapidly evolving IoT opportunities, IT must stand up to a new set of challenges. In his session at @ThingsExpo, Jeff Kaplan, Managing Director of THINKstrateg...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
"There is a natural synchronization between the business models, the IoT is there to support ,” explained Brendan O'Brien, Co-founder and Chief Architect of Aria Systems, in this SYS-CON.tv interview at the 15th International Cloud Expo®, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.