Click here to close now.

SYS-CON MEDIA Authors: VictorOps Blog, Tim Hinds, Mike Kavis, Peter Silva, Glenn Rossman

News Feed Item

Detour Gold Reports High Grade Gold Intersections in the Lower Detour Area of Its Detour Lake Property

TORONTO, ONTARIO -- (Marketwired) -- 06/02/14 -- Detour Gold Corporation (TSX:DGC) ("Detour Gold" or the "Company") reports assay results from its 2014 exploration drilling program in the Lower Detour Lake area located approximately 6 kilometres south of the Detour Lake gold mine on its 100% owned Detour Lake property. The Company extended its initial 8,000 metre drilling program to nearly 15,000 metres as a result of encouraging results and a longer winter drilling season. The Company completed 14,874 metres in 40 holes and has received assay results for all significant intersections of the program.

The Company has identified a significant mineralized system to the north of Zone 75 in following up a high-grade intercept of 17.3 g/t over 4.4 metres (DLD-13-075, last hole of the 2013 drilling program). This east-west mineralized zone (referred to as Zone 58N) was tested over a length of 450 metres by 28 holes totaling 10,888 metres. The mineralized system has a maximum width of 120 metres and narrows to less than 15 metres to the west and east. It has been tested from surface to a depth of approximately 300 metres and it remains open to the west and down dip. The gold mineralization is mainly found within the southern portion of a strongly sheared and altered feldspar porphyry intrusive containing quartz and/or quartz-tourmaline veins with up to 10% pyrite and multiple occurrences of visible gold. The results suggest that the grade and continuity of the gold mineralization may improve at depth.

"Confirming high-grade potential within trucking distance of the processing plant only after our second exploration drilling program and with minimal expenditures demonstrates the tremendous potential of our large land package," said Paul Martin, President and CEO of Detour Gold. "Our team is excited about the prospects for success over the coming years. In the coming months, the Company will complete a detailed geological and structural interpretation exercise of the Lower Detour area in preparation for the next winter drilling campaign."

Highlights from Zone 58N include (uncut assays reported) (from west to east):


--  9.69 g/t over 30.3 metres (hole DLD-14-105) 
--  11.82 g/t over 32.4 metres (hole DLD-14-103)  
--  12.74 g/t over 28.0 metres (hole DLD-14-110, 80 metres up dip from DLD-
    14-103) 
--  5.67 g/t over 23.0 metres and 5.04 g/t over 16.0 metres (hole DLD-14-
    112) 
--  9.20 g/t over 22.0 metres (hole DLD-14-116) 
--  2.55 g/t over 31.1 metres (hole DLD-14-120) 

Gold mineralization was also encountered in Zone 75 (20 to 50 metres south of Zone 58N described above). This mineralized zone is characterized by strongly sheared and altered mafic volcanics and feldspar porphyry dykes containing quartz veins and up to 25% sulphides.

Highlights from Zone 75 include:


--  4.31 g/t over 7.3 metres (hole DLD-14-111) 
--  10.82 g/t over 7.0 metres (hole DLD-14-088) 
--  7.41 g/t over 5.1 metres (hole DLD-14-100) 

The Company has also completed 3,985 metres in 12 holes testing mainly geophysical (IP) anomalies over a strike length of 5 kilometres in the Lower Detour area. With only partial assays available, only minor pyrite and/or pyrrhotite with no significant gold mineralization were encountered in the holes.

All drill hole data, including drill hole location map and cross sections are posted on the Company's website under Projects/Detour Lake Exploration: Regional.

Detour Gold's drilling program is being managed by its Exploration Manager, Guy MacGillivray, P.Geo., a Qualified Person within the meaning of National Instrument 43-101. Mr. MacGillivray has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The true width of the reported intercepts is estimated to be 65 to 75% of the drilled length. No significant gold mineralization was intersected in the other drill holes. Samples are prepared at ALS Laboratories in Timmins and Sudbury and assayed at their Vancouver, B.C. laboratory. Analysis for gold is done on sawn half core samples (size NQ) using 50 grams fire assay (AA finish). Samples with higher grade gold (greater than 3 g/t) or with visible gold are re-assayed using the pulp and metallics procedures. The Company's quality control checks include the insertion of standard reference materials and blank samples to monitor the accuracy of the assay data.

About Detour Gold

Detour Gold is an emerging mid-tier gold producer in Canada. In 2014, the Company is completing the ramp-up of its 100% owned Detour Lake mine to a long life, large scale open pit operation.

Forward-Looking Information Forward-Looking Information

This press release contains certain forward-looking information as defined in applicable securities laws (referred to herein as "forward-looking statements"). Specifically, this press release contains forward-looking statements regarding the Company's plans to complete a detailed geological and structural interpretation exercise of the Lower Detour area in preparation for the next winter drilling campaign. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold's ability to predict or control and may cause Detour Gold's actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled "Description of Business - Risk Factors" in Detour Gold's 2012 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the Company's ability to attract and retain skilled staff; the mine development schedule; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; timing of the receipt of regulatory and governmental approvals for development projects and other operations; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.


  Lower Detour Area - Significant Assay Results from 2014 Drilling Program  
   Shown by sections from West to East and Drill Holes from South to North  
----------------------------------------------------------------------------
                                          Au g/t  Mineralized Zone          
                                  Au g/t (cut to  (IFP = intermediate       
Hole No.      From     To Length (uncut) 30 g/t)  feldspar porphyry)        
            --------------------                                            
               (m)    (m)    (m)                                            
----------------------------------------------------------------------------
Section 595730E                                                             
----------------------------------------------------------------------------
DLD-14-091   229.2  235.0    5.8    4.06    4.06  75 silicified shear zone; 
                                                  quartz veins; VG          
----------------------------------------------------------------------------
Section 595680E                                                             
----------------------------------------------------------------------------
DLD-14-089   231.6  241.0    9.4    1.12    1.12  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
DLD-14-108   151.0  154.1    3.1    2.94    2.94  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
Section 595630E - Zone 58 N from 2 to 10 m (core length)                    
----------------------------------------------------------------------------
DLD-14-087   301.4  304.0    2.6    3.63    3.63  75 silicified, sericitized
                                                  shear zone                
----------------------------------------------------------------------------
DLD-14-113    94.0   96.3    2.3    7.05    7.05  75 silicified shear zone  
----------------------------------------------------------------------------
DLD-14-125    22.0   30.0    8.0    2.66    2.66  58N sheared mafic         
                                                  volcanics; quartz veins;  
                                                  VG                        
----------------------------------------------------------------------------
Section 595580E - Zone 58N from 10 to 30 m (core length)                    
----------------------------------------------------------------------------
DLD-14-105   370.9  401.2   30.3    9.69    8.14  58N silicified IFP;       
                                                  quartz-tourmaline veins;  
                                                  VG                        
            ----------------------------------------------------------------
             Incl.  388.5   11.5   19.68   16.27  IFP; quartz-tourmaline    
             377.0                                veins; VG                 
----------------------------------------------------------------------------
DLD-14-090   231.0  235.0    4.0    4.10    4.10  75 sheared quartz feldspar
                                                  porphyry; quartz veins; VG
----------------------------------------------------------------------------
DLD-14-100   141.8  146.9    5.1    7.41    7.41  75 IFP; quartz veins; VG  
----------------------------------------------------------------------------
DLD-14-088    87.0   94.0    7.0   10.82    4.07  75 silicified shear zone; 
                                                  quartz veins; VG          
----------------------------------------------------------------------------
Section 595530E - Zone 58N from 60 to 130 m (core length)                   
----------------------------------------------------------------------------
DLD-14-103   320.5  352.9   32.4   11.82    3.08  58N sericitized IFP;      
                                                  quartz-tourmaline veins;  
                                                  VG                        
            ----------------------------------------------------------------
             376.7  387.0   10.3    3.46    3.46  58N IFP; quartz-tourmaline
                                                  veins; VG                 
----------------------------------------------------------------------------
DLD-14-110   165.0  181.0   16.0    1.55    1.55  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             215.0  243.0   28.0   12.74    2.81  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             261.0  296.0   35.0    1.03    1.03  58N IFP; quartz-tourmaline
                                                  veins                     
----------------------------------------------------------------------------
DLD-14-115    86.0  121.0   35.0    1.55    1.55  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             165.0  186.0   21.0    1.72    1.72  58N IFP/mafic volcanics;  
                                                  quartz-tourmaline veins;  
                                                  VG                        
----------------------------------------------------------------------------
Section 595480E - Zone 58N from 115 to 160 m (core length)                  
----------------------------------------------------------------------------
DLD-14-112   253.0  276.0   23.0    5.67    3.43  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             296.0  312.0   16.0    5.04    3.06  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             320.0  334.0   14.0    2.72    2.72  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             344.0  351.5    7.5    4.96    2.59  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
----------------------------------------------------------------------------
DLD-14-111   135.2  142.5    7.3    4.31    4.31  75 silicified shear zone; 
                                                  quartz veins; VG          
            ----------------------------------------------------------------
             157.0  205.0   48.0    1.00    1.00  58N IFP; quartz veins; VG 
            ----------------------------------------------------------------
             216.0  226.0   10.0    1.06    1.06  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             309.0  316.0    7.0    8.92    5.51  58N IFP; quartz veins; VG 
----------------------------------------------------------------------------
DLD-14-116    55.5   57.5    2.0   15.03    8.33  75 sheared IFP; quartz    
                                                  veins; VG                 
            ----------------------------------------------------------------
             103.0  125.0   22.0    9.20    4.42  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             153.0  156.5    3.5    5.62    5.25  58N IFP; quartz veins; VG 
            ----------------------------------------------------------------
             275.3  283.0    7.7    3.25    2.78  58N IFP; quartz veins; VG 
----------------------------------------------------------------------------
Section 595430E - Zone 58N from 20 to 30 m (core length)                    
----------------------------------------------------------------------------
DLD-14-120    97.3   99.0    1.7    2.80    2.80  75 silicified shear zone; 
                                                  quartz veins              
            ----------------------------------------------------------------
             169.4  200.5   31.1    2.55    2.19  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             Incl.  179.0    9.6    6.49    5.35  IFP; quartz-tourmaline    
             169.4                                veins; VG                 
----------------------------------------------------------------------------
DLD-14-122    50.0   58.2    8.2    1.69    1.69  58N IFP; quartz-tourmaline
                                                  veins                     
            ----------------------------------------------------------------
             215.0  221.0    6.0    1.94    1.94  Mafic volcanics; quartz-  
                                                  carbonate veins           
----------------------------------------------------------------------------
Section 595330E - Zone 58N from 20 to 45 m (core length)                    
----------------------------------------------------------------------------
DLD-14-123   352.7  386.0   33.3    1.22    1.22  58N mafic volcanics/ IFP; 
                                                  quartz veins              
            ----------------------------------------------------------------
             Incl.  381.0   14.1    2.45    2.45  IFP; quartz-tourmaline    
             366.9                                veins                     
----------------------------------------------------------------------------
DLD-14-121   251.0  266.0   15.0    0.98    0.98  58N IFP; quartz veins     
            ----------------------------------------------------------------
             276.0  293.3   17.3    0.95    0.95  58N IFP; quartz veins     
----------------------------------------------------------------------------
DLD-14-119    77.4   85.5    8.1    2.10    2.10  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
Section 595230E - Zone 58N approx. 25 m (core length)                       
----------------------------------------------------------------------------
DLD-14-097   270.0  295.0   25.0    0.88    0.88  58N IFP; quartz veins     
----------------------------------------------------------------------------

Note: True width is estimated to be 65 to 75% of the drilled length. No significant gold mineralization was intersected in the other drill holes. Reported intervals are also shown with an assay cap of 30 g/t. Reported average gold grade is over core length widths.

Contacts:
Detour Gold Corporation
Paul Martin
President and CEO
(416) 304.0800

Detour Gold Corporation
Laurie Gaborit
Director Investor Relations
(416) 304.0581

Detour Gold Corporation
Royal Bank Plaza, South Tower
200 Bay Street, Suite 2200
Toronto, Ontario M5J 2J1
www.detourgold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
VictorOps is making on-call suck less with the only collaborative alert management platform on the market. With easy on-call scheduling management, a real-time incident timeline that gives you contextual relevance around your alerts and powerful reporting features that make post-mortems more effective, VictorOps helps your IT/DevOps team solve problems faster.
Skeuomorphism usually means retaining existing design cues in something new that doesn’t actually need them. However, the concept of skeuomorphism can be thought of as relating more broadly to applying existing patterns to new technologies that, in fact, cry out for new approaches. In his session at DevOps Summit, Gordon Haff, Senior Cloud Strategy Marketing and Evangelism Manager at Red Hat, will discuss why containers should be paired with new architectural practices such as microservices ra...
Roberto Medrano, Executive Vice President at SOA Software, had reached 30,000 page views on his home page - http://RobertoMedrano.SYS-CON.com/ - on the SYS-CON family of online magazines, which includes Cloud Computing Journal, Internet of Things Journal, Big Data Journal, and SOA World Magazine. He is a recognized executive in the information technology fields of SOA, internet security, governance, and compliance. He has extensive experience with both start-ups and large companies, having been ...
The industrial software market has treated data with the mentality of “collect everything now, worry about how to use it later.” We now find ourselves buried in data, with the pervasive connectivity of the (Industrial) Internet of Things only piling on more numbers. There’s too much data and not enough information. In his session at @ThingsExpo, Bob Gates, Global Marketing Director, GE’s Intelligent Platforms business, to discuss how realizing the power of IoT, software developers are now focu...
Operational Hadoop and the Lambda Architecture for Streaming Data Apache Hadoop is emerging as a distributed platform for handling large and fast incoming streams of data. Predictive maintenance, supply chain optimization, and Internet-of-Things analysis are examples where Hadoop provides the scalable storage, processing, and analytics platform to gain meaningful insights from granular data that is typically only valuable from a large-scale, aggregate view. One architecture useful for capturing...
SYS-CON Events announced today that Vitria Technology, Inc. will exhibit at SYS-CON’s @ThingsExpo, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. Vitria will showcase the company’s new IoT Analytics Platform through live demonstrations at booth #330. Vitria’s IoT Analytics Platform, fully integrated and powered by an operational intelligence engine, enables customers to rapidly build and operationalize advanced analytics to deliver timely business outcomes ...
DevOps is about increasing efficiency, but nothing is more inefficient than building the same application twice. However, this is a routine occurrence with enterprise applications that need both a rich desktop web interface and strong mobile support. With recent technological advances from Isomorphic Software and others, it is now feasible to create a rich desktop and tuned mobile experience with a single codebase, without compromising performance or usability.
SYS-CON Events announced today Arista Networks will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place June 9-11, 2015, at the Javits Center in New York City, NY. Arista Networks was founded to deliver software-driven cloud networking solutions for large data center and computing environments. Arista’s award-winning 10/40/100GbE switches redefine scalability, robustness, and price-performance, with over 3,000 customers and more than three million cloud networking ports depl...
Application metrics, logs, and business KPIs are a goldmine. It’s easy to get started with the ELK stack (Elasticsearch, Logstash and Kibana) – you can see lots of people coming up with impressive dashboards, in less than a day, with no previous experience. Going from proof-of-concept to production tends to be a bit more difficult, unfortunately, and it tends to gobble up our attention, time, and money. In his session at DevOps Summit, Otis Gospodnetić, co-author of Lucene in Action and founder...
The speed of software changes in growing and large scale rapid-paced DevOps environments presents a challenge for continuous testing. Many organizations struggle to get this right. Practices that work for small scale continuous testing may not be sufficient as the requirements grow. In his session at DevOps Summit, Marc Hornbeek, Sr. Solutions Architect of DevOps continuous test solutions at Spirent Communications, will explain the best practices of continuous testing at high scale, which is r...
SYS-CON Events announced today that Open Data Centers (ODC), a carrier-neutral colocation provider, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place June 9-11, 2015, at the Javits Center in New York City, NY. Open Data Centers is a carrier-neutral data center operator in New Jersey and New York City offering alternative connectivity options for carriers, service providers and enterprise customers.
Thanks to Docker, it becomes very easy to leverage containers to build, ship, and run any Linux application on any kind of infrastructure. Docker is particularly helpful for microservice architectures because their successful implementation relies on a fast, efficient deployment mechanism – which is precisely one of the features of Docker. Microservice architectures are therefore becoming more popular, and are increasingly seen as an interesting option even for smaller projects, instead of bein...
Security can create serious friction for DevOps processes. We've come up with an approach to alleviate the friction and provide security value to DevOps teams. In her session at DevOps Summit, Shannon Lietz, Senior Manager of DevSecOps at Intuit, will discuss how DevSecOps got started and how it has evolved. Shannon Lietz has over two decades of experience pursuing next generation security solutions. She is currently the DevSecOps Leader for Intuit where she is responsible for setting and driv...
The explosion of connected devices / sensors is creating an ever-expanding set of new and valuable data. In parallel the emerging capability of Big Data technologies to store, access, analyze, and react to this data is producing changes in business models under the umbrella of the Internet of Things (IoT). In particular within the Insurance industry, IoT appears positioned to enable deep changes by altering relationships between insurers, distributors, and the insured. In his session at @Things...
In his session at DevOps Summit, Tapabrata Pal, Director of Enterprise Architecture at Capital One, will tell a story about how Capital One has embraced Agile and DevOps Security practices across the Enterprise – driven by Enterprise Architecture; bringing in Development, Operations and Information Security organizations together. Capital Ones DevOpsSec practice is based upon three "pillars" – Shift-Left, Automate Everything, Dashboard Everything. Within about three years, from 100% waterfall, C...