SYS-CON MEDIA Authors: Craig Ferril, Xenia von Wedel, Peter Silva, Glenn Rossman, Ava Smith

News Feed Item

Detour Gold Reports High Grade Gold Intersections in the Lower Detour Area of Its Detour Lake Property

TORONTO, ONTARIO -- (Marketwired) -- 06/02/14 -- Detour Gold Corporation (TSX:DGC) ("Detour Gold" or the "Company") reports assay results from its 2014 exploration drilling program in the Lower Detour Lake area located approximately 6 kilometres south of the Detour Lake gold mine on its 100% owned Detour Lake property. The Company extended its initial 8,000 metre drilling program to nearly 15,000 metres as a result of encouraging results and a longer winter drilling season. The Company completed 14,874 metres in 40 holes and has received assay results for all significant intersections of the program.

The Company has identified a significant mineralized system to the north of Zone 75 in following up a high-grade intercept of 17.3 g/t over 4.4 metres (DLD-13-075, last hole of the 2013 drilling program). This east-west mineralized zone (referred to as Zone 58N) was tested over a length of 450 metres by 28 holes totaling 10,888 metres. The mineralized system has a maximum width of 120 metres and narrows to less than 15 metres to the west and east. It has been tested from surface to a depth of approximately 300 metres and it remains open to the west and down dip. The gold mineralization is mainly found within the southern portion of a strongly sheared and altered feldspar porphyry intrusive containing quartz and/or quartz-tourmaline veins with up to 10% pyrite and multiple occurrences of visible gold. The results suggest that the grade and continuity of the gold mineralization may improve at depth.

"Confirming high-grade potential within trucking distance of the processing plant only after our second exploration drilling program and with minimal expenditures demonstrates the tremendous potential of our large land package," said Paul Martin, President and CEO of Detour Gold. "Our team is excited about the prospects for success over the coming years. In the coming months, the Company will complete a detailed geological and structural interpretation exercise of the Lower Detour area in preparation for the next winter drilling campaign."

Highlights from Zone 58N include (uncut assays reported) (from west to east):


--  9.69 g/t over 30.3 metres (hole DLD-14-105) 
--  11.82 g/t over 32.4 metres (hole DLD-14-103)  
--  12.74 g/t over 28.0 metres (hole DLD-14-110, 80 metres up dip from DLD-
    14-103) 
--  5.67 g/t over 23.0 metres and 5.04 g/t over 16.0 metres (hole DLD-14-
    112) 
--  9.20 g/t over 22.0 metres (hole DLD-14-116) 
--  2.55 g/t over 31.1 metres (hole DLD-14-120) 

Gold mineralization was also encountered in Zone 75 (20 to 50 metres south of Zone 58N described above). This mineralized zone is characterized by strongly sheared and altered mafic volcanics and feldspar porphyry dykes containing quartz veins and up to 25% sulphides.

Highlights from Zone 75 include:


--  4.31 g/t over 7.3 metres (hole DLD-14-111) 
--  10.82 g/t over 7.0 metres (hole DLD-14-088) 
--  7.41 g/t over 5.1 metres (hole DLD-14-100) 

The Company has also completed 3,985 metres in 12 holes testing mainly geophysical (IP) anomalies over a strike length of 5 kilometres in the Lower Detour area. With only partial assays available, only minor pyrite and/or pyrrhotite with no significant gold mineralization were encountered in the holes.

All drill hole data, including drill hole location map and cross sections are posted on the Company's website under Projects/Detour Lake Exploration: Regional.

Detour Gold's drilling program is being managed by its Exploration Manager, Guy MacGillivray, P.Geo., a Qualified Person within the meaning of National Instrument 43-101. Mr. MacGillivray has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The true width of the reported intercepts is estimated to be 65 to 75% of the drilled length. No significant gold mineralization was intersected in the other drill holes. Samples are prepared at ALS Laboratories in Timmins and Sudbury and assayed at their Vancouver, B.C. laboratory. Analysis for gold is done on sawn half core samples (size NQ) using 50 grams fire assay (AA finish). Samples with higher grade gold (greater than 3 g/t) or with visible gold are re-assayed using the pulp and metallics procedures. The Company's quality control checks include the insertion of standard reference materials and blank samples to monitor the accuracy of the assay data.

About Detour Gold

Detour Gold is an emerging mid-tier gold producer in Canada. In 2014, the Company is completing the ramp-up of its 100% owned Detour Lake mine to a long life, large scale open pit operation.

Forward-Looking Information Forward-Looking Information

This press release contains certain forward-looking information as defined in applicable securities laws (referred to herein as "forward-looking statements"). Specifically, this press release contains forward-looking statements regarding the Company's plans to complete a detailed geological and structural interpretation exercise of the Lower Detour area in preparation for the next winter drilling campaign. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold's ability to predict or control and may cause Detour Gold's actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled "Description of Business - Risk Factors" in Detour Gold's 2012 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the Company's ability to attract and retain skilled staff; the mine development schedule; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; timing of the receipt of regulatory and governmental approvals for development projects and other operations; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.


  Lower Detour Area - Significant Assay Results from 2014 Drilling Program  
   Shown by sections from West to East and Drill Holes from South to North  
----------------------------------------------------------------------------
                                          Au g/t  Mineralized Zone          
                                  Au g/t (cut to  (IFP = intermediate       
Hole No.      From     To Length (uncut) 30 g/t)  feldspar porphyry)        
            --------------------                                            
               (m)    (m)    (m)                                            
----------------------------------------------------------------------------
Section 595730E                                                             
----------------------------------------------------------------------------
DLD-14-091   229.2  235.0    5.8    4.06    4.06  75 silicified shear zone; 
                                                  quartz veins; VG          
----------------------------------------------------------------------------
Section 595680E                                                             
----------------------------------------------------------------------------
DLD-14-089   231.6  241.0    9.4    1.12    1.12  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
DLD-14-108   151.0  154.1    3.1    2.94    2.94  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
Section 595630E - Zone 58 N from 2 to 10 m (core length)                    
----------------------------------------------------------------------------
DLD-14-087   301.4  304.0    2.6    3.63    3.63  75 silicified, sericitized
                                                  shear zone                
----------------------------------------------------------------------------
DLD-14-113    94.0   96.3    2.3    7.05    7.05  75 silicified shear zone  
----------------------------------------------------------------------------
DLD-14-125    22.0   30.0    8.0    2.66    2.66  58N sheared mafic         
                                                  volcanics; quartz veins;  
                                                  VG                        
----------------------------------------------------------------------------
Section 595580E - Zone 58N from 10 to 30 m (core length)                    
----------------------------------------------------------------------------
DLD-14-105   370.9  401.2   30.3    9.69    8.14  58N silicified IFP;       
                                                  quartz-tourmaline veins;  
                                                  VG                        
            ----------------------------------------------------------------
             Incl.  388.5   11.5   19.68   16.27  IFP; quartz-tourmaline    
             377.0                                veins; VG                 
----------------------------------------------------------------------------
DLD-14-090   231.0  235.0    4.0    4.10    4.10  75 sheared quartz feldspar
                                                  porphyry; quartz veins; VG
----------------------------------------------------------------------------
DLD-14-100   141.8  146.9    5.1    7.41    7.41  75 IFP; quartz veins; VG  
----------------------------------------------------------------------------
DLD-14-088    87.0   94.0    7.0   10.82    4.07  75 silicified shear zone; 
                                                  quartz veins; VG          
----------------------------------------------------------------------------
Section 595530E - Zone 58N from 60 to 130 m (core length)                   
----------------------------------------------------------------------------
DLD-14-103   320.5  352.9   32.4   11.82    3.08  58N sericitized IFP;      
                                                  quartz-tourmaline veins;  
                                                  VG                        
            ----------------------------------------------------------------
             376.7  387.0   10.3    3.46    3.46  58N IFP; quartz-tourmaline
                                                  veins; VG                 
----------------------------------------------------------------------------
DLD-14-110   165.0  181.0   16.0    1.55    1.55  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             215.0  243.0   28.0   12.74    2.81  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             261.0  296.0   35.0    1.03    1.03  58N IFP; quartz-tourmaline
                                                  veins                     
----------------------------------------------------------------------------
DLD-14-115    86.0  121.0   35.0    1.55    1.55  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             165.0  186.0   21.0    1.72    1.72  58N IFP/mafic volcanics;  
                                                  quartz-tourmaline veins;  
                                                  VG                        
----------------------------------------------------------------------------
Section 595480E - Zone 58N from 115 to 160 m (core length)                  
----------------------------------------------------------------------------
DLD-14-112   253.0  276.0   23.0    5.67    3.43  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             296.0  312.0   16.0    5.04    3.06  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             320.0  334.0   14.0    2.72    2.72  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
            ----------------------------------------------------------------
             344.0  351.5    7.5    4.96    2.59  58N sheared IFP; quartz-  
                                                  tourmaline veins; VG      
----------------------------------------------------------------------------
DLD-14-111   135.2  142.5    7.3    4.31    4.31  75 silicified shear zone; 
                                                  quartz veins; VG          
            ----------------------------------------------------------------
             157.0  205.0   48.0    1.00    1.00  58N IFP; quartz veins; VG 
            ----------------------------------------------------------------
             216.0  226.0   10.0    1.06    1.06  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             309.0  316.0    7.0    8.92    5.51  58N IFP; quartz veins; VG 
----------------------------------------------------------------------------
DLD-14-116    55.5   57.5    2.0   15.03    8.33  75 sheared IFP; quartz    
                                                  veins; VG                 
            ----------------------------------------------------------------
             103.0  125.0   22.0    9.20    4.42  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             153.0  156.5    3.5    5.62    5.25  58N IFP; quartz veins; VG 
            ----------------------------------------------------------------
             275.3  283.0    7.7    3.25    2.78  58N IFP; quartz veins; VG 
----------------------------------------------------------------------------
Section 595430E - Zone 58N from 20 to 30 m (core length)                    
----------------------------------------------------------------------------
DLD-14-120    97.3   99.0    1.7    2.80    2.80  75 silicified shear zone; 
                                                  quartz veins              
            ----------------------------------------------------------------
             169.4  200.5   31.1    2.55    2.19  58N IFP; quartz-tourmaline
                                                  veins; VG                 
            ----------------------------------------------------------------
             Incl.  179.0    9.6    6.49    5.35  IFP; quartz-tourmaline    
             169.4                                veins; VG                 
----------------------------------------------------------------------------
DLD-14-122    50.0   58.2    8.2    1.69    1.69  58N IFP; quartz-tourmaline
                                                  veins                     
            ----------------------------------------------------------------
             215.0  221.0    6.0    1.94    1.94  Mafic volcanics; quartz-  
                                                  carbonate veins           
----------------------------------------------------------------------------
Section 595330E - Zone 58N from 20 to 45 m (core length)                    
----------------------------------------------------------------------------
DLD-14-123   352.7  386.0   33.3    1.22    1.22  58N mafic volcanics/ IFP; 
                                                  quartz veins              
            ----------------------------------------------------------------
             Incl.  381.0   14.1    2.45    2.45  IFP; quartz-tourmaline    
             366.9                                veins                     
----------------------------------------------------------------------------
DLD-14-121   251.0  266.0   15.0    0.98    0.98  58N IFP; quartz veins     
            ----------------------------------------------------------------
             276.0  293.3   17.3    0.95    0.95  58N IFP; quartz veins     
----------------------------------------------------------------------------
DLD-14-119    77.4   85.5    8.1    2.10    2.10  75 silicified shear zone; 
                                                  quartz veins              
----------------------------------------------------------------------------
Section 595230E - Zone 58N approx. 25 m (core length)                       
----------------------------------------------------------------------------
DLD-14-097   270.0  295.0   25.0    0.88    0.88  58N IFP; quartz veins     
----------------------------------------------------------------------------

Note: True width is estimated to be 65 to 75% of the drilled length. No significant gold mineralization was intersected in the other drill holes. Reported intervals are also shown with an assay cap of 30 g/t. Reported average gold grade is over core length widths.

Contacts:
Detour Gold Corporation
Paul Martin
President and CEO
(416) 304.0800

Detour Gold Corporation
Laurie Gaborit
Director Investor Relations
(416) 304.0581

Detour Gold Corporation
Royal Bank Plaza, South Tower
200 Bay Street, Suite 2200
Toronto, Ontario M5J 2J1
www.detourgold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Windstream, a leading provider of advanced network and cloud communications, has been named “Silver Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9–11, 2015, at the Javits Center in New York, NY. Windstream (Nasdaq: WIN), a FORTUNE 500 and S&P 500 company, is a leading provider of advanced network communications, including cloud computing and managed services, to businesses nationwide. The company also offers broadband, p...
The 4th International DevOps Summit, co-located with16th International Cloud Expo – being held June 9-11, 2015, at the Javits Center in New York City, NY – announces that its Call for Papers is now open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's large...
"There is a natural synchronization between the business models, the IoT is there to support ,” explained Brendan O'Brien, Co-founder and Chief Architect of Aria Systems, in this SYS-CON.tv interview at the 15th International Cloud Expo®, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Verizon Enterprise Solutions is simplifying the cloud-purchasing experience for its clients, with the launch of Verizon Cloud Marketplace, a key foundational component of the company's robust ecosystem of enterprise-class technologies. The online storefront will initially feature pre-built cloud-based services from AppDynamics, Hitachi Data Systems, Juniper Networks, PfSense and Tervela. Available globally to enterprises using Verizon Cloud, Verizon Cloud Marketplace provides a one-stop shop fo...
Leysin American School is an exclusive, private boarding school located in Leysin, Switzerland. Leysin selected an OpenStack-powered, private cloud as a service to manage multiple applications and provide development environments for students across the institution. Seeking to meet rigid data sovereignty and data integrity requirements while offering flexible, on-demand cloud resources to users, Leysin identified OpenStack as the clear choice to round out the school's cloud strategy. Additional...
The major cloud platforms defy a simple, side-by-side analysis. Each of the major IaaS public-cloud platforms offers their own unique strengths and functionality. Options for on-site private cloud are diverse as well, and must be designed and deployed while taking existing legacy architecture and infrastructure into account. Then the reality is that most enterprises are embarking on a hybrid cloud strategy and programs. In this Power Panel at 15th Cloud Expo (http://www.CloudComputingExpo.com...
We are all here because we are sold on the transformative promise of The Cloud. But what good is all of this ephemeral, on-demand infrastructure if your usage doesn't actually improve the agility and speed of your business? How must Operations adapt in order to avoid stifling your Cloud initiative? In his session at DevOps Summit, Damon Edwards, co-founder and managing partner of the DTO Solutions, will highlight the successful organizational, process, and tooling patterns of high-performing c...
The definition of IoT is not new, in fact it’s been around for over a decade. What has changed is the public's awareness that the technology we use on a daily basis has caught up on the vision of an always on, always connected world. If you look into the details of what comprises the IoT, you’ll see that it includes everything from cloud computing, Big Data analytics, “Things,” Web communication, applications, network, storage, etc. It is essentially including everything connected online from ha...
Software-driven innovation is becoming a primary approach to how businesses create and deliver new value to customers. A survey of 400 business and IT executives by the IBM Institute for Business Value showed businesses that are more effective at software delivery are also more profitable than their peers nearly 70 percent of the time (1). DevOps provides a way for businesses to remain competitive, applying lean and agile principles to software development to speed the delivery of software that ...
Docker offers a new, lightweight approach to application portability. Applications are shipped using a common container format and managed with a high-level API. Their processes run within isolated namespaces that abstract the operating environment independently of the distribution, versions, network setup, and other details of this environment. This "containerization" has often been nicknamed "the new virtualization." But containers are more than lightweight virtual machines. Beyond their small...
The move in recent years to cloud computing services and architectures has added significant pace to the application development and deployment environment. When enterprise IT can spin up large computing instances in just minutes, developers can also design and deploy in small time frames that were unimaginable a few years ago. The consequent move toward lean, agile, and fast development leads to the need for the development and operations sides to work very closely together. Thus, DevOps become...
Cloud Expo 2014 TV commercials will feature @ThingsExpo, which was launched in June, 2014 at New York City's Javits Center as the largest 'Internet of Things' event in the world.

ARMONK, N.Y., Nov. 20, 2014 /PRNewswire/ --  IBM (NYSE: IBM) today announced that it is bringing a greater level of control, security and flexibility to cloud-based application development and delivery with a single-tenant version of Bluemix, IBM's

An entirely new security model is needed for the Internet of Things, or is it? Can we save some old and tested controls for this new and different environment? In his session at @ThingsExpo, New York's at the Javits Center, Davi Ottenheimer, EMC Senior Director of Trust, reviewed hands-on lessons with IoT devices and reveal a new risk balance you might not expect. Davi Ottenheimer, EMC Senior Director of Trust, has more than nineteen years' experience managing global security operations and asse...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at Internet of @ThingsExpo, James Kirkland, Chief Ar...