Click here to close now.

SYS-CON MEDIA Authors: Elizabeth White, Adrian Bridgwater, Mike Kavis, Jnan Dash, Liz McMillan

News Feed Item

Rubicon Minerals Infill Drilling Program Continues to Increase Confidence in the F2 Deposit at the Phoenix Gold Project

TORONTO, ONTARIO -- (Marketwired) -- 06/23/14 -- Rubicon Minerals Corporation (TSX: RMX)(NYSE MKT: RBY) ("Rubicon" or the "Company") provides initial results from its 38,000-metre infill drilling program, which continue to confirm the Company's expectations of the F2 Deposit at the Phoenix Gold Project ("Project").

"The results from our infill drilling program are encouraging to-date, confirming our expectations of the F2 deposit at the Phoenix Gold Project," said Michael A. Lalonde, President and Chief Executive Officer of Rubicon. "The results demonstrate continuity of mineralization in areas of the deposit where we had anticipated continuity. The program is still in its early stages and we have recently commenced the underground drilling portion of the program."

Infill Drilling Program

Rubicon plans to complete 38,000 metres of infill drilling in 2014. The main purpose is to convert inferred mineral resource ounces to the drill indicated category. The area being concentrated on lies between surface and the 610 metre level. This drill program is being carried out on 25 metre spaced holes over the entire length of the F2 deposit. Many of these holes will be located at the extremities of the deposit, or in areas within the deposit that are presently believed to be outside the current mineral resource. For stope planning purposes, it is important to better establish the economic resource boundaries, and better define where the known gaps occur in the mineral resource.

Rubicon completed a total of 39 holes for 7,047 metres of drilling from this program as of May 31, 2014. The majority of the drill holes are currently being logged, sampled, cut, or assayed. Drilling from the ice surface provided an effective platform to target the upper portion of the deposit. Table 1 summarizes assay results from the infill drilling program as of May 31, 2014.

Notable assay results include:


--  GT-2014-07: 14.19 grams of gold per tonne (g/t "Au") over 6.8 m
--  GT-2014-08: 10.52 g/t Au over 8.0 m

Underground drilling started in early May, with two drills working on the 244-metre level. Current drilling has focused on areas that are sparsely drilled, specifically outside the core of the deposit and the Hanging Wall Zone.

Please see figures 1, 2, and 3 at the end of this release to see the plan and long section views of the infill drilling program. Results from the infill drilling program have confirmed expectations of the deposit so far. The Company is also encountering some additional economic intercepts within previously anticipated gaps in the resource.

Once the infill program is completed, Rubicon will follow up with a second drilling phase called definition drilling. This drilling will be on a tighter pattern of 12.5 metres or less. The second phase of drilling will be more focused and will be carried out only within the known mineral resource blocks, to better define the grade and geometry of individual stopes. The goal is to have tightly defined drilling sufficient for detailed stope planning for the first three years of potential production.

About Rubicon Minerals Corporation

Rubicon Minerals Corporation is an advanced stage gold development company. The Company is focused on responsible and environmentally sustainable development of its Phoenix Gold Project in Red Lake, Ontario. The start of potential gold production is projected in mid-2015, based on current forecasts. The Phoenix Gold Project is fully permitted for initial production at 1,250 tonnes per day. In addition, Rubicon controls over 100 square miles of prime exploration ground in the prolific Red Lake gold district which hosts Goldcorp's high-grade, world class Red Lake Mine. Rubicon's shares are listed on the NYSE MKT (RBY) and the Toronto Stock Exchange (RMX).

RUBICON MINERALS CORPORATION

Mike Lalonde, President and Chief Executive Officer

The content of this news release has been read and approved by Daniel Labine, P.Eng., Vice President of Operations and Mark Ross, B.Sc., P.Geo., Chief Mine Geologist, for Rubicon. Both are Qualified Persons as defined by NI 43-101.

Forward Looking Statements

This news release contains statements that constitute "forward-looking statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934 and "forward looking information" within the meaning of applicable Canadian provincial securities legislation (collectively, "forward-looking statements"). Forward-looking statements often, but not always, are identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect", "targeting", "look forward" and "intend" and statements that an event or result "may", "will", "would", "should", "could", or "might" occur or be achieved and other similar expressions.

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management's best judgment based on facts and assumptions that management considers reasonable. The material assumptions upon which such forward-looking statements are based include, among others; that the demand for gold and base metal deposits will develop as anticipated; that the price of gold will remain at levels that will render the Phoenix Gold Project economic; that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, or adverse weather conditions; that Rubicon will meet its estimated timeline for the development of the Phoenix Gold Project; that Rubicon will continue to have the ability to attract and retain skilled staff; that the mineral resource estimate as disclosed in the New Preliminary Economic Assessment with an effective date of June 25, 2013 and with an issue date of February 28, 2014 ("New PEA") will be realized; and that there are no material unanticipated variations in the cost of energy or supplies, or in the pre-production capital and operating cost estimate as disclosed in the New PEA. Rubicon makes no representation that reasonable business people in possession of the same information would reach the same conclusions.

Capital expenditures and time required to develop new mines are considerable and changes in cost or construction schedules can significantly increase both the time and capital required to build and complete a development project. Additional capital costs may be to be incurred in respect of the Phoenix Gold Project.

The New PEA is preliminary in nature as it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the New PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The quantity and grade of reported inferred resources referred to in the New PEA are uncertain in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource category.

Forward-looking statements in this news release include, but are not limited to statements regarding potential production being achieved in mid-2015.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: future prices of gold and other metals; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; actual results of reclamation activities; conclusions of future economic evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays and other risks related to joint venture operations; timing and receipt of regulatory approvals of operations; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the availability of financing for proposed transactions and programs on reasonable terms; the ability of third-party service providers to deliver services on reasonable terms and in a timely manner; and delays in the completion of development or construction activities. Other factors that could cause the actual results to differ include market prices, results of exploration, availability of capital and financing on acceptable terms, inability to obtain required regulatory approvals, unanticipated difficulties or costs in any rehabilitation which may be necessary, market conditions and general business, economic, competitive, political and social conditions.

It is important to note that the information provided in this news release is preliminary in nature. There is no certainty that a potential mine will be realized. A mine production decision that is made without a bankable feasibility study carries additional potential risks which include, but are not limited to, the inclusion of inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mine design and mining schedules, metallurgical flow sheets and process plant designs may require additional detailed work to ensure satisfactory operational conditions.

Forward-looking statements contained herein are made as of the date of this news release and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. Readers Regarding Estimates of Indicated and Inferred Resources

This news release uses the terms "indicated mineral resources" and "inferred resources". The Company advises U.S. investors that while these terms are recognized and required by Canadian securities administrators, they are not recognized by the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred" or "indicated mineral resource" will ever be upgraded to a higher category.

Under Canadian rules, estimates of "inferred mineral resources" may not form the basis of feasibility studies, pre-feasibility studies or other economic studies, except in prescribed cases, such as in a preliminary economic assessment under certain circumstances. The SEC normally only permits issuers to report mineralization that does not constitute "reserves" as in-place tonnage and grade without reference to unit measures. Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of an indicated or inferred resource exists or is economically or legally mineable. Information concerning descriptions of mineralization and resources contained herein may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release

To view Figures 1-3, click on the following link: http://media3.marketwire.com/docs/953348p.pdf



Table 1: Infill Drilling Assay Results Above 610-Metre level
Includes intervals at greater than 5.0 g/t Au over 1.0 m minimum width, no
 assay cut

---------------------------------------------------------------------------
                                      Total
Drill hole                            depth    From      To   Width    Gold
number              Elevation           (m)     (m)     (m)     (m)   (g/t)
---------------------------------------------------------------------------
GT-2014-03A         Ice Surface       125.0    86.4    88.9     2.5    5.65
---------------------------------------------------------------------------
GT-2014-07          Ice Surface       239.0    69.0    72.0     3.0   14.11
---------------------------------------------------------------------------
                                              119.0   120.0     1.0    9.26
---------------------------------------------------------------------------
                                              126.1   128.6     2.5   15.93
---------------------------------------------------------------------------
                                              143.0   149.8     6.8   14.19
---------------------------------------------------------------------------
GT-2014-08          Ice Surface       134.0   106.0   114.0     8.0   10.52
---------------------------------------------------------------------------
                                              117.0   119.0     2.0    8.62
---------------------------------------------------------------------------
F2-2014-01          Ice Surface       457.0   287.0   288.0     1.0   10.58
---------------------------------------------------------------------------
F2-2014-03          Ice Surface       424.0   262.1   264.9     2.8    5.07
---------------------------------------------------------------------------
F2-2014-05          Ice Surface       390.0   310.8   312.2     1.4    6.73
---------------------------------------------------------------------------
F2-2014-06          Ice Surface       347.0   308.0   309.5     1.5   20.72
---------------------------------------------------------------------------
                                              331.2   332.3     1.1   10.24
---------------------------------------------------------------------------
F2-2014-08          Ice Surface       360.0   261.6   264.0     2.4    5.81
---------------------------------------------------------------------------
                                              279.0   280.0     1.0   21.59
---------------------------------------------------------------------------

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
While DevOps most critically and famously fosters collaboration, communication, and integration through cultural change, culture is more of an output than an input. In order to actively drive cultural evolution, organizations must make substantial organizational and process changes, and adopt new technologies, to encourage a DevOps culture. Moderated by Andi Mann, panelists will discuss how to balance these three pillars of DevOps, where to focus attention (and resources), where organizations m...
SYS-CON Events announced today the IoT Bootcamp – Jumpstart Your IoT Strategy, being held June 9–10, 2015, in conjunction with 16th Cloud Expo and Internet of @ThingsExpo at the Javits Center in New York City. This is your chance to jumpstart your IoT strategy. Combined with real-world scenarios and use cases, the IoT Bootcamp is not just based on presentations but includes hands-on demos and walkthroughs. We will introduce you to a variety of Do-It-Yourself IoT platforms including Arduino, Ras...
SYS-CON Events announced today that AIC, a leading provider of OEM/ODM server and storage solutions, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. AIC is a leading provider of both standard OTS, off-the-shelf, and OEM/ODM server and storage solutions. With expert in-house design capabilities, validation, manufacturing and production, AIC's broad selection of products are highly flexible and are conf...
Deploying and operating cloud technology is difficult and falls outside the core competencies of most organizations. As a result, many on-premises private cloud installations falter, casting doubt on private cloud as a solution in general. Yet private clouds come with a unique set of benefits that continue to drive widespread interest. There must be a better way. This session will give participants a clear roadmap of private cloud implementation challenges and offer actionable ideas for...
@ThingsExpo has been named the Top 5 Most Influential Internet of Things Brand by Onalytica in the ‘The Internet of Things Landscape 2015: Top 100 Individuals and Brands.' Onalytica analyzed Twitter conversations around the #IoT debate to uncover the most influential brands and individuals driving the conversation. Onalytica captured data from 56,224 users. The PageRank based methodology they use to extract influencers on a particular topic (tweets mentioning #InternetofThings or #IoT in this ...
WebRTC is an up-and-coming standard that enables real-time voice and video to be directly embedded into browsers making the browser a primary user interface for communications and collaboration. WebRTC runs in a number of browsers today and is currently supported in over a billion installed browsers globally, across a range of platform OS and devices. Today, organizations that choose to deploy WebRTC applications and use a host machine that supports audio through USB or Bluetooth can use Plantro...
SYS-CON Events announced today that the DevOps Institute has been named “Association Sponsor” of SYS-CON's DevOps Summit, which will take place on June 9–11, 2015, at the Javits Center in New York City, NY. The DevOps Institute provides enterprise level training and certification. Working with thought leaders from the DevOps community, the IT Service Management field and the IT training market, the DevOps Institute is setting the standard in quality for DevOps education and training.
How do you securely enable access to your applications in AWS without exposing any attack surfaces? The answer is usually very complicated because application environments morph over time in response to growing requirements from your employee base, your partners and your customers. In his session at 16th Cloud Expo, Haseeb Budhani, CEO and Co-founder of Soha, will share five common approaches that DevOps teams follow to secure access to applications deployed in AWS, Azure, etc., and the frict...
Buzzword alert: Microservices and IoT at a DevOps conference? What could possibly go wrong? Join this panel of experts as they peel away the buzz and discuss the important architectural principles behind implementing IoT solutions for the enterprise. As remote IoT devices and sensors become increasingly intelligent, they become part of our distributed cloud environment, and we must architect and code accordingly. At the very least, you’ll have no problem filling in your buzzword bingo cards.
IoT is still a vague buzzword for many people. In his session at @ThingsExpo, Mike Kavis, Vice President & Principal Cloud Architect at Cloud Technology Partners, discussed the business value of IoT that goes far beyond the general public's perception that IoT is all about wearables and home consumer services. He also discussed how IoT is perceived by investors and how venture capitalist access this space. Other topics discussed were barriers to success, what is new, what is old, and what th...
Containers and microservices have become topics of intense interest throughout the cloud developer and enterprise IT communities. Accordingly, attendees at the upcoming 16th Cloud Expo at the Javits Center in New York June 9-11 will find fresh new content in a new track called PaaS | Containers & Microservices Containers are not being considered for the first time by the cloud community, but a current era of re-consideration has pushed them to the top of the cloud agenda. With the launch ...
So I guess we’ve officially entered a new era of lean and mean. I say this with the announcement of Ubuntu Snappy Core, “designed for lightweight cloud container hosts running Docker and for smart devices,” according to Canonical. “Snappy Ubuntu Core is the smallest Ubuntu available, designed for security and efficiency in devices or on the cloud.” This first version of Snappy Ubuntu Core features secure app containment and Docker 1.6 (1.5 in main release), is available on public clouds, ...
Internet of Things (IoT) will be a hybrid ecosystem of diverse devices and sensors collaborating with operational and enterprise systems to create the next big application. In their session at @ThingsExpo, Bramh Gupta, founder and CEO of robomq.io, and Fred Yatzeck, principal architect leading product development at robomq.io, will discuss how choosing the right middleware and integration strategy from the get-go will enable IoT solution developers to adapt and grow with the industry, while at...
The only place to be June 9-11 is Cloud Expo & @ThingsExpo 2015 East at the Javits Center in New York City. Join us there as delegates from all over the world come to listen to and engage with speakers & sponsors from the leading Cloud Computing, IoT & Big Data companies. Cloud Expo & @ThingsExpo are the leading events covering the booming market of Cloud Computing, IoT & Big Data for the enterprise. Speakers from all over the world will be hand-picked for their ability to explore the economic...
SYS-CON Events announced today that Column Technologies, a global technology solutions company, will exhibit at SYS-CON's DevOps Summit 2015 New York, which will take place June 9-11, 2015, at the Javits Center in New York City, NY. Established in 1998, Column Technologies is a leader in application performance and infrastructure management for commercial and federal markets. The company is headquartered in the United States, with a diverse and talented team of more than 350 employees around th...