SYS-CON MEDIA Authors: Elizabeth White, Liz McMillan, Pat Romanski, Esmeralda Swartz, Kevin Jackson

News Feed Item

Eagle Hill Announces Positive Drill Results and Initiation of a Preliminary Economic Assessment Study at the Windfall Lake Gold Project

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/24/14 -- Eagle Hill Exploration Corporation (TSX VENTURE: EAG)(OTCQX: EHECF) ("Eagle Hill" or the "Company") is pleased to announce that the Company is initiating a Preliminary Economic Assessment Study ("PEA") for the Windfall Lake Gold Project ("Windfall Lake"). The Company is also pleased to announce the results of its 2014 Winter Drill Program, and its drilling plans for the remainder of 2014.

Preliminary Economic Assessment

Eagle Hill's Board of Directors is very encouraged with the drill results obtained to date at Windfall Lake, including a 38% increase to the indicated mineral resource as outlined in the March 2014 updated resource estimate prepared by SRK Consulting (Canada) Inc. (Table 1). Eagle Hill's Board of Directors has determined that completing the environmental, engineering and economic studies associated with a PEA will provide further clarity on the potential of advancing this promising, high-grade deposit to production.

The Board has appointed Eagle Hill's new director, Paul-Henri Girard, as the lead director to manage the PEA process. Mr. Girard is a Mining Engineer with extensive hands-on experience planning and operating Canadian mines. Mr. Girard started his career with Falconbridge Copper as a mining engineer in 1980, and moved to Agnico Eagle Mines in 1987 as Chief Engineer of LaRonde Mine in Quebec. Mr. Girard held increasingly senior positions with Agnico Eagle over a 25-year period, eventually retiring from the position of Vice President Canadian Operations in 2012. Mr. Girard's engineering and mining experience will be invaluable as Eagle Hill undertakes a PEA on the Windfall Lake Gold Project.

"Initiating a Preliminary Economic Assessment Study clearly indicates the Board's intention to advance the Windfall Lake Gold Project," said John Proust, Chairman and Chief Executive Officer of Eagle Hill. "We welcome Paul-Henri Girard to the Board of Directors and look forward to his input as we advance this high-grade gold deposit one step closer to production."

Results of 2014 Winter Drill Program

"The 2014 Winter Program drill results confirmed continuity of the gold mineralization of Zone 27. This zone hosts the majority of the indicated mineral resource, and the fact that it can be traced further laterally is encouraging," said Dr. Mike Andrews, Director and President of Eagle Hill.

The Winter 2014 diamond drill program had the objective of testing for gold mineralization below shallow lakes. The Company drilled extensions of Zone 27 at shallow depths, and also tested the western extension of the IP anomaly associated with the Main Zone, some 800 metres to the southwest of the current mineral resource.

A total of 3,333 metres in 16 drill holes was completed (Table 2, Figure 1). Several drill intercepts demonstrated the presence of pyritic stockwork similar to other lenses of the Main Zone. The results indicate that the upper portion of Zone 27 continues for up to 100 metres to the ENE and WSW from the modelled lenses. Highlight intersections include:


East Lake (expanding shallower portion of Zone 27 up to 100 m to the ENE)

EAG-14-538                    18.5 g/t gold over 3.38 m from 196.5 m
    incl.                     7.04 g/t gold over 6.2 m from 208.8 m

EAG-14-542                    20.45 g/t gold over 2.6 m from 226.4 m

EAG-14-543                    41.8 g/t gold over 1.0 m from 193.7 m

EAG-14-544                    20.1 g/t gold over 0.5 m from 231.0 m

Central Lake (expanding shallower portion of Zone 27 up to 100 m to the WSW)

EAG-14-533                    8.36 g/t gold over 1.2 m from 106.8 m

EAG-14-534                    10.6 g/t gold over 0.9 m from 81.8 m

West Lake (800 metres SW of Main Zone)

EAG-14-547                    53.6 g/t gold over 0.3 m from 120.2 m

EAG-14-548                    4.78 g/t gold over 4.1 m from 62.7 m
    and                       12.55 g/t gold over 1.0 m from 219.0 m

Drill Program for Remainder of 2014

Eagle Hill's Board of Directors has approved a 2,800-metre drill program targeting the extension of Zone 27 to the northeast below Red Dog. Eagle Hill plans to deepen six existing drill holes in a target zone that is currently untested. The Board has also approved an additional hole-to-hole IP survey to further define drill targets at depth.

Geological studies indicate that the gold mineralization hosted by Zone 27 and the Caribou Zone may have been displaced as much as 600 metres below the Red Dog dike, which coincides with the IP anomaly identified below Red Dog. The Fall 2013 drilling program confirmed continuity of gold mineralization below the Red Dog intrusion and delineated an inferred mineral resource of 455,000 tonnes at a grade of 8.21 g/t gold for 120,000 contained ounces of gold. This highlights the potential to significantly increase the mineral resource below the Red Dog intrusion.


On Behalf of the Board of Directors

"John Proust"

Chairman and Interim CEO

About Eagle Hill Exploration Corporation

Eagle Hill Exploration Corporation is a Canadian mineral exploration company focused on the exploration and development of the high-grade Windfall Lake gold deposit, located between Val-d'Or and Chibougamau in Quebec, Canada. The current mineral resource comprises 2,375,000 tonnes at 9.75 g/t gold (744,000 ounces) in the indicated category and 3,084,000 tonnes at 7.37 g/t gold (731,000 ounces) in the inferred category (Technical Report for the Windfall Lake Gold Project, Quebec prepared by SRK Consulting (Canada) Inc., dated March 3, 2014). These grades make Windfall Lake one of the highest grade resource-stage gold projects in the world. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1,400 metres long. The deposit remains open at depth and along strike, with additional drilling and technical work planned for 2014. More information is available at www.eaglehillexploration.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Qualified Person

The technical information in this document has been reviewed by Eagle Hill's Vice President Exploration, Jean-Philippe Desrochers, PhD, PGeo, who has sufficient experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101. The drill program and sampling protocol is managed by Eagle Hill under the supervision of Jean-Philippe Desrochers. The diamond drill holes are drilled at NQ sizes and core recovery to date has averaged better than 95.0%. Half core is cut by rock saw and is generally sampled using nominal 1-metre intervals; however, sample intervals vary according to geological contacts and have ranged between 0.3 to 1.5 metres in length. Two quality control samples (one blank and one certified reference material) are inserted into each batch of 20 samples. All assays were performed by ALS Chemex Laboratory Group, in Val d'Or, Quebec. The half core samples are securely transported from the project site to the ALS Chemex laboratory by Eagle Hill personnel. Gold analyses reported in this release were performed by standard fire assay using a 30-gram charge with atomic absorption finish and a gravimetric finish for assays greater than 10 grams per tonne and by metallic sieve method for samples containing significant amounts of pyrite or visible gold. In addition, an Aqua regia digestion with ICP-AES finish is used to analyse a full suite of elements including silver and base metals.

Cautionary Note Regarding Forward-looking Statements

This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively "forward-looking statements"). The use of any of the words "will", "plans", "objective", "expand", "potential" and similar expressions are intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. Such forward-looking statements should not be unduly relied upon. This document contains forward-looking statements and assumptions pertaining to the following: uncertainty involving resource estimates and the ability to extract those resources economically, or at all; uncertainty involving drilling programs and the Company's ability to expand and upgrade existing resource estimates; the regulatory process and actions; the need to work with local communities and authorities to advance the properties; the need to work with Dundee and Southern Arc to advance the property; technical issues; new legislation; competitive factors and conditions; uncertainties resulting from potential delays or changes in plans; the occurrence of unexpected events; and the Company's ability to execute and implement future plans. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors, including uncertainty related to drill results and the inclusion of drill results in future resource estimates for the property. The Company believes the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct.


Table 1 - Mineral Resource Statement, Windfall Lake Gold Project, Quebec SRK
                 Consulting (Canada) Inc., February 28, 2014

----------------------------------------------------------------------------
      Resource                               Grade          Contained Gold
   Classification         Tonnes             (g/t)             (ounces)
----------------------------------------------------------------------------
     Indicated          2,375,000             9.75             744,000
----------------------------------------------------------------------------
      Inferred          3,084,000             7.37             731,000
----------------------------------------------------------------------------

1.  Prepared by SRK Consulting (Canada), Inc. with an effective date of
    February 28, 2014.
2.  Mineral resources are not mineral reserves and do not have demonstrated
    economic viability. There is no certainty that all or any part of the
    mineral resources will be converted into mineral reserves.
3.  All figures have been rounded to reflect the relative accuracy of the
    estimates.
4.  Reported at a cut-off grade of 3.0 g/t gold, assuming an underground
    extraction scenario, a gold price of US$1,200 per ounce and
    metallurgical recovery of 91.7%.
5.  The National Instrument 43-101 technical report for this resource
    statement was filed by Eagle Hill on SEDAR at www.SEDAR.com on April 17,
    2014.

Table 2 - Windfall Lake Gold Deposit Winter 2014 Drill Program -Summary Results



----------------------------------------------------------------------------
       East-  North- Eleva-                         Au
DDH     ing    ing    tion  From   To     Length   g/t    Comments
----------------------------------------------------------------------------


                                                                     Central
EAG-                                                                  Lake
 14-                               No significant
 531  451798 5434630   398            results
--------------------------------------------------------------------
EAG-
 14-                               No significant
 532  451808 5434610   398            results
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 14-                                                    West by 100
 533  451818 5434590   398  106.8 108.0    1.2     8.36      m
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 14-                                                     West by 30
 534  451861 5434620   398  81.8  82.7     0.9     10.6      m
--------------------------------------------------------------------
EAG-
 14-                                Abandoned in
 535  451863 5434616   398           overburden
--------------------------------------------------------------------
EAG-
 14-                               No significant
 536  451863 5434616   398            results
----------------------------------------------------------------------------










                                                                      East
                                                                      Lake






EAG-
 14-                                Abandoned in
 537  452372 5434780  398.7          overburden
--------------------------------------------------------------------
                                                          Expands
EAG-                                                      Zone 27
 14-                                                    slightly to
 538  452372 5434780  398.7 196.5 215.0    18.5    3.38   the East
--------------------------------------------------------------------
                                                          Expands
                                                          Zone 27
                                                        slightly to
 incl.                      206.2 215.0    8.8     5.79   the East
--------------------------------------------------------------------
                                                          Expands
                                                          Zone 27
                                                        slightly to
                            208.8 215.0    6.2     7.04   the East
--------------------------------------------------------------------
EAG-
 14-
 539  452394 5434840  398.7 25.0  26.0      1      3.57
--------------------------------------------------------------------
EAG-
 14-
 540  452413 5434810  398.7 48.2  49.3     1.1     4.51
--------------------------------------------------------------------
                            89.1  90.0     0.9     5.55
--------------------------------------------------------------------
                            289.8 290.8     1      3.1
--------------------------------------------------------------------
EAG-
 14-
 541  452472 5434910  398.7 171.2 174.0    2.8     3.58
--------------------------------------------------------------------
EAG-
 14-
 542  452492 5434870  398.7 129.7 130.1    0.4    18.85
                                                          Extends
                                                         Zone 27 to
                                                        the East by
                            226.4 229.0    2.6    20.45    100 m
--------------------------------------------------------------------
                            245.1 246.7    1.6     8.59
--------------------------------------------------------------------
EAG-
 15-
 543  452457 5434830  398.7 68.0  68.6     0.6     3.24
--------------------------------------------------------------------
                            123.8 124.6    0.8     3.52
--------------------------------------------------------------------
                            193.7 194.7     1      41.8
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 15-                                                    the East by
 544  452479 5434790  398.7 231.0 231.5    0.5     20.1     70 m
--------------------------------------------------------------------
                            242.6 243.9    1.3     3.15
--------------------------------------------------------------------
                            264.0 265.0     1      5.52
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 545  452385 5434750  398.7          overburden
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 546  452385 5434750  398.7          overburden
----------------------------------------------------------------------------



                                                                      West
                                                                      Lake
EAG-                                                      Northern
 15-                                                     contact of
 547  451017 5434330  398.5 120.2 120.5    0.3     53.6  IP anomaly
--------------------------------------------------------------------
EAG-                                                       South
 15-                                                     contact of
 548  451046 5434277  398.5 48.5  49.3     0.8     4.43  IP anomaly
--------------------------------------------------------------------
                                                         On western
                            62.7  66.8     4.1     4.78  Ip anomaly
--------------------------------------------------------------------
 incl.                      65.7  66.8     1.1    10.85
--------------------------------------------------------------------
                            219.0 220.0     1     12.55
--------------------------------------------------------------------
EAG-
 15-                               No significant
 549  451095 5434401  398.5           results
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 550  451125 5434347  398.5          overburden
--------------------------------------------------------------------
                                                         Vertically
EAG-                                                       below
 15-                                                     Intercept
 551  451125 5434347  398.5 128.0 128.4    0.4     9.57 of hole 547
----------------------------------------------------------------------------

To view Figure 1 - Windfall Lake Gold Deposit Winter 2014 Drill Program, please visit the following link:

http://media3.marketwire.com/docs/953773.pdf

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
“This win means a great deal to us because it is decided by the readers – the people who understand how use of our technology enables new insights that drive the business,” said Matt Davies, senior director, EMEA marketing, Splunk. “Splunk Enterprise enables organizations to improve service levels, reduce operations costs, mitigate security risks, enhance DevOps collaboration, create new product and service offerings and obtain deeper insight into customer behavior. Being named Best Business App...
The Industrial Internet revolution is now underway, enabled by connected machines and billions of devices that communicate and collaborate. The massive amounts of Big Data requiring real-time analysis is flooding legacy IT systems and giving way to cloud environments that can handle the unpredictable workloads. Yet many barriers remain until we can fully realize the opportunities and benefits from the convergence of machines and devices with Big Data and the cloud, including interoperability, ...
The move in recent years to cloud computing services and architectures has added significant pace to the application development and deployment environment. When enterprise IT can spin up large computing instances in just minutes, developers can also design and deploy in small time frames that were unimaginable a few years ago. The consequent move toward lean, agile, and fast development leads to the need for the development and operations sides to work very closely together. Thus, DevOps become...
SYS-CON Media announced that Cisco, a worldwide leader in IT that helps companies seize the opportunities of tomorrow, has launched a new ad campaign in Cloud Computing Journal. The ad campaign, a webcast titled 'Is Your Data Center Ready for the Application Economy?', focuses on the latest data center networking technologies, including SDN or ACI, and how customers are using SDN and ACI in their organizations to achieve business agility. The Cisco webcast is available on-demand.
Datapipe has acquired GoGrid, a provider of multi-cloud solutions for Big Data deployments. GoGrid’s proprietary orchestration and automation technologies provide 1-Button deployment for Big Data solutions that speed creation and results of new cloud projects. “GoGrid has made it easy for companies to stand up Big Data solutions quickly,” said Robb Allen, CEO, Datapipe. “Datapipe customers will achieve significant value from the speed at which we can now create new Big Data projects in the clou...
IoT is still a vague buzzword for many people. In his session at @ThingsExpo, Mike Kavis, Vice President & Principal Cloud Architect at Cloud Technology Partners, discussed the business value of IoT that goes far beyond the general public's perception that IoT is all about wearables and home consumer services. He also discussed how IoT is perceived by investors and how venture capitalist access this space. Other topics discussed were barriers to success, what is new, what is old, and what th...
The Internet of Things (IoT) is rapidly in the process of breaking from its heretofore relatively obscure enterprise applications (such as plant floor control and supply chain management) and going mainstream into the consumer space. More and more creative folks are interconnecting everyday products such as household items, mobile devices, appliances and cars, and unleashing new and imaginative scenarios. We are seeing a lot of excitement around applications in home automation, personal fitness,...
Security can create serious friction for DevOps processes. We've come up with an approach to alleviate the friction and provide security value to DevOps teams. In her session at DevOps Summit, Shannon Lietz, Senior Manager of DevSecOps at Intuit, will discuss how DevSecOps got started and how it has evolved. Shannon Lietz has over two decades of experience pursuing next generation security solutions. She is currently the DevSecOps Leader for Intuit where she is responsible for setting and driv...
Dale Kim is the Director of Industry Solutions at MapR. His background includes a variety of technical and management roles at information technology companies. While his experience includes work with relational databases, much of his career pertains to non-relational data in the areas of search, content management, and NoSQL, and includes senior roles in technical marketing, sales engineering, and support engineering. Dale holds an MBA from Santa Clara University, and a BA in Computer Science f...
The Internet of Things (IoT) promises to evolve the way the world does business; however, understanding how to apply it to your company can be a mystery. Most people struggle with understanding the potential business uses or tend to get caught up in the technology, resulting in solutions that fail to meet even minimum business goals. In his session at @ThingsExpo, Jesse Shiah, CEO / President / Co-Founder of AgilePoint Inc., showed what is needed to leverage the IoT to transform your business. ...
Things are being built upon cloud foundations to transform organizations. This CEO Power Panel at 15th Cloud Expo, moderated by Roger Strukhoff, Cloud Expo and @ThingsExpo conference chair, addressed the big issues involving these technologies and, more important, the results they will achieve. Rodney Rogers, chairman and CEO of Virtustream; Brendan O'Brien, co-founder of Aria Systems, Bart Copeland, president and CEO of ActiveState Software; Jim Cowie, chief scientist at Dyn; Dave Wagstaff, VP ...
SYS-CON Events announced today that CodeFutures, a leading supplier of database performance tools, has been named a “Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9–11, 2015, at the Javits Center in New York, NY. CodeFutures is an independent software vendor focused on providing tools that deliver database performance tools that increase productivity during database development and increase database performance and scalability during production.
SYS-CON Media announced today that PagerDuty has launched a popular blog feed on DevOps Journal. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done.
Cloud Technology Partners on Wednesday announced it has been recognized by the Modern Infrastructure Impact Awards as one of the Best Amazon Web Services (AWS) Consulting Partners. Selected by the editors of TechTarget's SearchDataCenter.com, and by votes from customers and strategic channel partners, the companies acknowledged by the Modern Infrastructure Impact Awards represent the top providers of cloud consulting services for AWS including application migration, application development, inf...
Today’s enterprise is being driven by disruptive competitive and human capital requirements to provide enterprise application access through not only desktops, but also mobile devices. To retrofit existing programs across all these devices using traditional programming methods is very costly and time consuming – often prohibitively so. In his session at @ThingsExpo, Jesse Shiah, CEO, President, and Co-Founder of AgilePoint Inc., discussed how you can create applications that run on all mobile ...