SYS-CON MEDIA Authors: Sean Houghton, Glenn Rossman, Ignacio M. Llorente, Xenia von Wedel, Peter Silva

News Feed Item

Eagle Hill Announces Positive Drill Results and Initiation of a Preliminary Economic Assessment Study at the Windfall Lake Gold Project

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/24/14 -- Eagle Hill Exploration Corporation (TSX VENTURE: EAG)(OTCQX: EHECF) ("Eagle Hill" or the "Company") is pleased to announce that the Company is initiating a Preliminary Economic Assessment Study ("PEA") for the Windfall Lake Gold Project ("Windfall Lake"). The Company is also pleased to announce the results of its 2014 Winter Drill Program, and its drilling plans for the remainder of 2014.

Preliminary Economic Assessment

Eagle Hill's Board of Directors is very encouraged with the drill results obtained to date at Windfall Lake, including a 38% increase to the indicated mineral resource as outlined in the March 2014 updated resource estimate prepared by SRK Consulting (Canada) Inc. (Table 1). Eagle Hill's Board of Directors has determined that completing the environmental, engineering and economic studies associated with a PEA will provide further clarity on the potential of advancing this promising, high-grade deposit to production.

The Board has appointed Eagle Hill's new director, Paul-Henri Girard, as the lead director to manage the PEA process. Mr. Girard is a Mining Engineer with extensive hands-on experience planning and operating Canadian mines. Mr. Girard started his career with Falconbridge Copper as a mining engineer in 1980, and moved to Agnico Eagle Mines in 1987 as Chief Engineer of LaRonde Mine in Quebec. Mr. Girard held increasingly senior positions with Agnico Eagle over a 25-year period, eventually retiring from the position of Vice President Canadian Operations in 2012. Mr. Girard's engineering and mining experience will be invaluable as Eagle Hill undertakes a PEA on the Windfall Lake Gold Project.

"Initiating a Preliminary Economic Assessment Study clearly indicates the Board's intention to advance the Windfall Lake Gold Project," said John Proust, Chairman and Chief Executive Officer of Eagle Hill. "We welcome Paul-Henri Girard to the Board of Directors and look forward to his input as we advance this high-grade gold deposit one step closer to production."

Results of 2014 Winter Drill Program

"The 2014 Winter Program drill results confirmed continuity of the gold mineralization of Zone 27. This zone hosts the majority of the indicated mineral resource, and the fact that it can be traced further laterally is encouraging," said Dr. Mike Andrews, Director and President of Eagle Hill.

The Winter 2014 diamond drill program had the objective of testing for gold mineralization below shallow lakes. The Company drilled extensions of Zone 27 at shallow depths, and also tested the western extension of the IP anomaly associated with the Main Zone, some 800 metres to the southwest of the current mineral resource.

A total of 3,333 metres in 16 drill holes was completed (Table 2, Figure 1). Several drill intercepts demonstrated the presence of pyritic stockwork similar to other lenses of the Main Zone. The results indicate that the upper portion of Zone 27 continues for up to 100 metres to the ENE and WSW from the modelled lenses. Highlight intersections include:


East Lake (expanding shallower portion of Zone 27 up to 100 m to the ENE)

EAG-14-538                    18.5 g/t gold over 3.38 m from 196.5 m
    incl.                     7.04 g/t gold over 6.2 m from 208.8 m

EAG-14-542                    20.45 g/t gold over 2.6 m from 226.4 m

EAG-14-543                    41.8 g/t gold over 1.0 m from 193.7 m

EAG-14-544                    20.1 g/t gold over 0.5 m from 231.0 m

Central Lake (expanding shallower portion of Zone 27 up to 100 m to the WSW)

EAG-14-533                    8.36 g/t gold over 1.2 m from 106.8 m

EAG-14-534                    10.6 g/t gold over 0.9 m from 81.8 m

West Lake (800 metres SW of Main Zone)

EAG-14-547                    53.6 g/t gold over 0.3 m from 120.2 m

EAG-14-548                    4.78 g/t gold over 4.1 m from 62.7 m
    and                       12.55 g/t gold over 1.0 m from 219.0 m

Drill Program for Remainder of 2014

Eagle Hill's Board of Directors has approved a 2,800-metre drill program targeting the extension of Zone 27 to the northeast below Red Dog. Eagle Hill plans to deepen six existing drill holes in a target zone that is currently untested. The Board has also approved an additional hole-to-hole IP survey to further define drill targets at depth.

Geological studies indicate that the gold mineralization hosted by Zone 27 and the Caribou Zone may have been displaced as much as 600 metres below the Red Dog dike, which coincides with the IP anomaly identified below Red Dog. The Fall 2013 drilling program confirmed continuity of gold mineralization below the Red Dog intrusion and delineated an inferred mineral resource of 455,000 tonnes at a grade of 8.21 g/t gold for 120,000 contained ounces of gold. This highlights the potential to significantly increase the mineral resource below the Red Dog intrusion.


On Behalf of the Board of Directors

"John Proust"

Chairman and Interim CEO

About Eagle Hill Exploration Corporation

Eagle Hill Exploration Corporation is a Canadian mineral exploration company focused on the exploration and development of the high-grade Windfall Lake gold deposit, located between Val-d'Or and Chibougamau in Quebec, Canada. The current mineral resource comprises 2,375,000 tonnes at 9.75 g/t gold (744,000 ounces) in the indicated category and 3,084,000 tonnes at 7.37 g/t gold (731,000 ounces) in the inferred category (Technical Report for the Windfall Lake Gold Project, Quebec prepared by SRK Consulting (Canada) Inc., dated March 3, 2014). These grades make Windfall Lake one of the highest grade resource-stage gold projects in the world. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1,400 metres long. The deposit remains open at depth and along strike, with additional drilling and technical work planned for 2014. More information is available at www.eaglehillexploration.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Qualified Person

The technical information in this document has been reviewed by Eagle Hill's Vice President Exploration, Jean-Philippe Desrochers, PhD, PGeo, who has sufficient experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101. The drill program and sampling protocol is managed by Eagle Hill under the supervision of Jean-Philippe Desrochers. The diamond drill holes are drilled at NQ sizes and core recovery to date has averaged better than 95.0%. Half core is cut by rock saw and is generally sampled using nominal 1-metre intervals; however, sample intervals vary according to geological contacts and have ranged between 0.3 to 1.5 metres in length. Two quality control samples (one blank and one certified reference material) are inserted into each batch of 20 samples. All assays were performed by ALS Chemex Laboratory Group, in Val d'Or, Quebec. The half core samples are securely transported from the project site to the ALS Chemex laboratory by Eagle Hill personnel. Gold analyses reported in this release were performed by standard fire assay using a 30-gram charge with atomic absorption finish and a gravimetric finish for assays greater than 10 grams per tonne and by metallic sieve method for samples containing significant amounts of pyrite or visible gold. In addition, an Aqua regia digestion with ICP-AES finish is used to analyse a full suite of elements including silver and base metals.

Cautionary Note Regarding Forward-looking Statements

This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively "forward-looking statements"). The use of any of the words "will", "plans", "objective", "expand", "potential" and similar expressions are intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. Such forward-looking statements should not be unduly relied upon. This document contains forward-looking statements and assumptions pertaining to the following: uncertainty involving resource estimates and the ability to extract those resources economically, or at all; uncertainty involving drilling programs and the Company's ability to expand and upgrade existing resource estimates; the regulatory process and actions; the need to work with local communities and authorities to advance the properties; the need to work with Dundee and Southern Arc to advance the property; technical issues; new legislation; competitive factors and conditions; uncertainties resulting from potential delays or changes in plans; the occurrence of unexpected events; and the Company's ability to execute and implement future plans. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors, including uncertainty related to drill results and the inclusion of drill results in future resource estimates for the property. The Company believes the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct.


Table 1 - Mineral Resource Statement, Windfall Lake Gold Project, Quebec SRK
                 Consulting (Canada) Inc., February 28, 2014

----------------------------------------------------------------------------
      Resource                               Grade          Contained Gold
   Classification         Tonnes             (g/t)             (ounces)
----------------------------------------------------------------------------
     Indicated          2,375,000             9.75             744,000
----------------------------------------------------------------------------
      Inferred          3,084,000             7.37             731,000
----------------------------------------------------------------------------

1.  Prepared by SRK Consulting (Canada), Inc. with an effective date of
    February 28, 2014.
2.  Mineral resources are not mineral reserves and do not have demonstrated
    economic viability. There is no certainty that all or any part of the
    mineral resources will be converted into mineral reserves.
3.  All figures have been rounded to reflect the relative accuracy of the
    estimates.
4.  Reported at a cut-off grade of 3.0 g/t gold, assuming an underground
    extraction scenario, a gold price of US$1,200 per ounce and
    metallurgical recovery of 91.7%.
5.  The National Instrument 43-101 technical report for this resource
    statement was filed by Eagle Hill on SEDAR at www.SEDAR.com on April 17,
    2014.

Table 2 - Windfall Lake Gold Deposit Winter 2014 Drill Program -Summary Results



----------------------------------------------------------------------------
       East-  North- Eleva-                         Au
DDH     ing    ing    tion  From   To     Length   g/t    Comments
----------------------------------------------------------------------------


                                                                     Central
EAG-                                                                  Lake
 14-                               No significant
 531  451798 5434630   398            results
--------------------------------------------------------------------
EAG-
 14-                               No significant
 532  451808 5434610   398            results
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 14-                                                    West by 100
 533  451818 5434590   398  106.8 108.0    1.2     8.36      m
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 14-                                                     West by 30
 534  451861 5434620   398  81.8  82.7     0.9     10.6      m
--------------------------------------------------------------------
EAG-
 14-                                Abandoned in
 535  451863 5434616   398           overburden
--------------------------------------------------------------------
EAG-
 14-                               No significant
 536  451863 5434616   398            results
----------------------------------------------------------------------------










                                                                      East
                                                                      Lake






EAG-
 14-                                Abandoned in
 537  452372 5434780  398.7          overburden
--------------------------------------------------------------------
                                                          Expands
EAG-                                                      Zone 27
 14-                                                    slightly to
 538  452372 5434780  398.7 196.5 215.0    18.5    3.38   the East
--------------------------------------------------------------------
                                                          Expands
                                                          Zone 27
                                                        slightly to
 incl.                      206.2 215.0    8.8     5.79   the East
--------------------------------------------------------------------
                                                          Expands
                                                          Zone 27
                                                        slightly to
                            208.8 215.0    6.2     7.04   the East
--------------------------------------------------------------------
EAG-
 14-
 539  452394 5434840  398.7 25.0  26.0      1      3.57
--------------------------------------------------------------------
EAG-
 14-
 540  452413 5434810  398.7 48.2  49.3     1.1     4.51
--------------------------------------------------------------------
                            89.1  90.0     0.9     5.55
--------------------------------------------------------------------
                            289.8 290.8     1      3.1
--------------------------------------------------------------------
EAG-
 14-
 541  452472 5434910  398.7 171.2 174.0    2.8     3.58
--------------------------------------------------------------------
EAG-
 14-
 542  452492 5434870  398.7 129.7 130.1    0.4    18.85
                                                          Extends
                                                         Zone 27 to
                                                        the East by
                            226.4 229.0    2.6    20.45    100 m
--------------------------------------------------------------------
                            245.1 246.7    1.6     8.59
--------------------------------------------------------------------
EAG-
 15-
 543  452457 5434830  398.7 68.0  68.6     0.6     3.24
--------------------------------------------------------------------
                            123.8 124.6    0.8     3.52
--------------------------------------------------------------------
                            193.7 194.7     1      41.8
--------------------------------------------------------------------
                                                          Extends
EAG-                                                     Zone 27 to
 15-                                                    the East by
 544  452479 5434790  398.7 231.0 231.5    0.5     20.1     70 m
--------------------------------------------------------------------
                            242.6 243.9    1.3     3.15
--------------------------------------------------------------------
                            264.0 265.0     1      5.52
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 545  452385 5434750  398.7          overburden
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 546  452385 5434750  398.7          overburden
----------------------------------------------------------------------------



                                                                      West
                                                                      Lake
EAG-                                                      Northern
 15-                                                     contact of
 547  451017 5434330  398.5 120.2 120.5    0.3     53.6  IP anomaly
--------------------------------------------------------------------
EAG-                                                       South
 15-                                                     contact of
 548  451046 5434277  398.5 48.5  49.3     0.8     4.43  IP anomaly
--------------------------------------------------------------------
                                                         On western
                            62.7  66.8     4.1     4.78  Ip anomaly
--------------------------------------------------------------------
 incl.                      65.7  66.8     1.1    10.85
--------------------------------------------------------------------
                            219.0 220.0     1     12.55
--------------------------------------------------------------------
EAG-
 15-                               No significant
 549  451095 5434401  398.5           results
--------------------------------------------------------------------
EAG-
 15-                                Abandoned in
 550  451125 5434347  398.5          overburden
--------------------------------------------------------------------
                                                         Vertically
EAG-                                                       below
 15-                                                     Intercept
 551  451125 5434347  398.5 128.0 128.4    0.4     9.57 of hole 547
----------------------------------------------------------------------------

To view Figure 1 - Windfall Lake Gold Deposit Winter 2014 Drill Program, please visit the following link:

http://media3.marketwire.com/docs/953773.pdf

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at Internet of @ThingsExpo, James Kirkland, Chief Ar...
The 3rd International @ThingsExpo, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to th...
In her General Session at 15th Cloud Expo, Anne Plese, Senior Consultant, Cloud Product Marketing, at Verizon Enterprise, focused on finding the right mix of renting vs. buying Oracle capacity to scale to meet business demands, and offer validated Oracle database TCO models for Oracle development and testing environments. Anne Plese is a marketing and technology enthusiast/realist with over 19+ years in high tech. At Verizon Enterprise, she focuses on driving growth for the Verizon Cloud platfo...
The Internet of Things will greatly expand the opportunities for data collection and new business models driven off of that data. In her session at @ThingsExpo, Esmeralda Swartz, CMO of MetraTech, discussed how for this to be effective you not only need to have infrastructure and operational models capable of utilizing this new phenomenon, but increasingly service providers will need to convince a skeptical public to participate. Get ready to show them the money!
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
P2P RTC will impact the landscape of communications, shifting from traditional telephony style communications models to OTT (Over-The-Top) cloud assisted & PaaS (Platform as a Service) communication services. The P2P shift will impact many areas of our lives, from mobile communication, human interactive web services, RTC and telephony infrastructure, user federation, security and privacy implications, business costs, and scalability. In his session at @ThingsExpo, Robin Raymond, Chief Architect...
What do a firewall and a fortress have in common? They are no longer strong enough to protect the valuables housed inside. Like the walls of an old fortress, the cracks in the firewall are allowing the bad guys to slip in - unannounced and unnoticed. By the time these thieves get in, the damage is already done and the network is already compromised. Intellectual property is easily slipped out the back door leaving no trace of forced entry. If we want to reign in on these cybercriminals, it's hig...
We are reaching the end of the beginning with WebRTC, and real systems using this technology have begun to appear. One challenge that faces every WebRTC deployment (in some form or another) is identity management. For example, if you have an existing service – possibly built on a variety of different PaaS/SaaS offerings – and you want to add real-time communications you are faced with a challenge relating to user management, authentication, authorization, and validation. Service providers will w...
"ElasticBox is an enterprise company that makes it very easy for developers and IT ops to collaborate to develop, build and deploy applications on any cloud - private, public or hybrid," stated Monish Sharma, VP of Customer Success at ElasticBox, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
The term culture has had a polarizing effect among DevOps supporters. Some propose that culture change is critical for success with DevOps, but are remiss to define culture. Some talk about a DevOps culture but then reference activities that could lead to culture change and there are those that talk about culture change as a set of behaviors that need to be adopted by those in IT. There is no question that businesses successful in adopting a DevOps mindset have seen departmental culture change, ...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
The definition of IoT is not new, in fact it’s been around for over a decade. What has changed is the public's awareness that the technology we use on a daily basis has caught up on the vision of an always on, always connected world. If you look into the details of what comprises the IoT, you’ll see that it includes everything from cloud computing, Big Data analytics, “Things,” Web communication, applications, network, storage, etc. It is essentially including everything connected online from ha...
The 4th International DevOps Summit, co-located with16th International Cloud Expo – being held June 9-11, 2015, at the Javits Center in New York City, NY – announces that its Call for Papers is now open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's large...
The security devil is always in the details of the attack: the ones you've endured, the ones you prepare yourself to fend off, and the ones that, you fear, will catch you completely unaware and defenseless. The Internet of Things (IoT) is nothing if not an endless proliferation of details. It's the vision of a world in which continuous Internet connectivity and addressability is embedded into a growing range of human artifacts, into the natural world, and even into our smartphones, appliances, a...