Click here to close now.

SYS-CON MEDIA Authors: Pat Romanski, Jason Bloomberg, Liz McMillan, Elizabeth White, Dana Gardner

News Feed Item

Probe Mines Announces High-Grade Infill Drilling Results at Borden Gold

TORONTO, ONTARIO -- (Marketwired) -- 07/07/14 -- Highlights:


-  Results from the preliminary infill drilling program of the recent High-
   Grade Zone ("HGZ") expansion area returned significant intervals of gold
   mineralization, including Hole BL14-621W on Section 2150mSE, with an
   interval of:

   21.0 metres averaging 7.0 g/t gold
     - including 13.0 metres grading 10.5 g/t gold

-  Results continue to confirm the strong continuity of the high-grade
   mineralization

Probe Mines Limited (TSX VENTURE: PRB) ("Probe" or the "Company") is pleased to announce that it has received results for the first five holes of the preliminary infill drilling program within the recently expanded area of the High-Grade Zone ("HGZ") on the Company's Borden Gold project near Chapleau, Ontario. Diamond drill holes BL14-620 to BL14-624 were received and were successful in demonstrating the presence of high-grade gold mineralization, as well as confirming the continuity of the gold mineralization, within the recently expanded HGZ drilled during the last winter program. The drilling confirms that high-grade gold mineralization, similar to that intersected in previous infill drilling programs on previously delineated areas of the HGZ, is present within the new expansion zone.

The infill program is designed to test the new extension of the HGZ between Sections 2050 and 2200, at 50 metre-spacing, in order to better define the high-grade mineralization. The program was successful in identifying grades similar to those observed in previously delineated sections of the HGZ between 900mSE and 2000mSE. Hole BL14-620W, on Section 2150m SE, intersected a thick zone of high-grade gold mineralization, returning an interval of 21 metres averaging 7.0 g/t Au, including a 13-metre wide intercept of 10.5 g/t Au. Significantly, the mineralization was intersected at a vertical depth of only 425 metres depth, suggesting that the mineralization is in fact shallower than previously expected. These preliminary results also suggest that continued improvement in grade is possible with continued infill drilling, the bulk of which will be accomplished during the next winter program.

The following table shows selected drill results for the HGZ expansion drilling, No top-cut was used in calculating the gold intervals, the highest grade in a single sample was 26.4 g/t in Hole BL14-621W. Depths of the mineralized zone ranged between approximately 395 and 425 metres vertical, with the exception of Hole BL14-620, which intersected mineralization at a vertical depth of approximately 620 metres. All drill widths approximate true width. Updated plan and section maps for all holes are also available on the Company's website at http://www.probemines.com/s/Borden_Lake.asp?ReportID=569319.


                    High-Grade Zone Infill Drill Results
----------------------------------------------------------------------------
                                  From           To        Width          Au
DDH               Section          (m)          (m)          (m)       (g/t)
----------------------------------------------------------------------------
BL14-620          2050mSE        636.0        649.7         13.7         2.8
----------------------------------------------------------------------------
                including        637.9        646.9          9.0         3.6
----------------------------------------------------------------------------
BL14-621W        2150m SE        564.4        600.0         35.6         4.5
----------------------------------------------------------------------------
                including        579.0        600.0         21.0         7.0
----------------------------------------------------------------------------
                including        583.0        596.0         13.0        10.5
----------------------------------------------------------------------------
BL14-622         2200m SE        633.0        636.0          3.0         4.9
----------------------------------------------------------------------------
BL14-623          2050mSE        592.0        602.3         10.3         1.3
----------------------------------------------------------------------------
BL14-624          2150mSE        540.0        550.0         10.0         2.5
----------------------------------------------------------------------------
W: Wedge hole

Dr. David Palmer, President and CEO of Probe, comments: "The results of the infill drill program continue to confirm the strong continuity of the high-grade gold system to the southeast. The significant intervals identified in the winter program, and improved upon in this preliminary infill drilling program, indicate a robust gold system in both grade and width that remains open to the southeast. With the potential for increasing grade and further expansion, the HGZ provides significant upside for exploration in addition to its growing momentum as a potential development project. We will be focused on advancing both aspects during the 2014-2015 seasons."

Probe has instituted a strict quality assurance and quality control ("QA-QC") program for the Borden Gold drill core sampling, with each fire assay furnace batch of 40 samples including two certified reference materials (standards), one blank sample and one core duplicate sample. Quality control guidelines and ongoing QAQC monitoring are being carried out by Probe personnel.

About Probe Mines:

Probe Mines Limited is a Canadian precious metals exploration company whose key asset is the Borden Gold Zone in Ontario, Canada. As of January 31, 2014, the Company is well-positioned with approximately $29.4 million in treasury. The Company is actively exploring a significant new gold resource on its Borden Gold Zone near Chapleau, Ontario and has 100% interest in the Black Creek chromite deposit located in Northern Ontario. The Company's shares trade on the TSX Venture Exchange under the symbol PRB.

David Palmer, Ph.D., P.Geo., is the qualified person for all technical information in this release. To find out more about Probe Mines Limited, visit our website at www.probemines.com.

On behalf of Probe Mines Limited,

Dr. David Palmer, President & Chief Executive Officer

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan".

Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Shares Issued: 76,374,727

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Buzzword alert: Microservices and IoT at a DevOps conference? What could possibly go wrong? In this Power Panel at DevOps Summit, moderated by Jason Bloomberg, the leading expert on architecting agility for the enterprise and president of Intellyx, panelists will peel away the buzz and discuss the important architectural principles behind implementing IoT solutions for the enterprise. As remote IoT devices and sensors become increasingly intelligent, they become part of our distributed cloud en...
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
While great strides have been made relative to the video aspects of remote collaboration, audio technology has basically stagnated. Typically all audio is mixed to a single monaural stream and emanates from a single point, such as a speakerphone or a speaker associated with a video monitor. This leads to confusion and lack of understanding among participants especially regarding who is actually speaking. Spatial teleconferencing introduces the concept of acoustic spatial separation between confe...
We are all here because we are sold on the transformative promise of The Cloud. But what good is all of this ephemeral, on-demand infrastructure if your usage doesn't actually improve the agility and speed of your business? How must Operations adapt in order to avoid stifling your Cloud initiative? In his session at DevOps Summit, Damon Edwards, co-founder and managing partner of the DTO Solutions, will highlight the successful organizational, process, and tooling patterns of high-performing c...
Discussions about cloud computing are evolving into discussions about enterprise IT in general. As enterprises increasingly migrate toward their own unique clouds, new issues such as the use of containers and microservices emerge to keep things interesting. In this Power Panel at 16th Cloud Expo, moderated by Conference Chair Roger Strukhoff, panelists will address the state of cloud computing today, and what enterprise IT professionals need to know about how the latest topics and trends affec...
There is no question that the cloud is where businesses want to host data. Until recently hypervisor virtualization was the most widely used method in cloud computing. Recently virtual containers have been gaining in popularity, and for good reason. In the debate between virtual machines and containers, the latter have been seen as the new kid on the block – and like other emerging technology have had some initial shortcomings. However, the container space has evolved drastically since coming on...
T-Mobile has been transforming the wireless industry with its “Uncarrier” initiatives. Today as T-Mobile’s IT organization works to transform itself in a like manner, technical foundations built over the last couple of years are now key to their drive for more Agile delivery practices. In his session at DevOps Summit, Martin Krienke, Sr Development Manager at T-Mobile, will discuss where they started their Continuous Delivery journey, where they are today, and where they are going in an effort ...
The 4th International Internet of @ThingsExpo, co-located with the 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - announces that its Call for Papers is open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than 20 years ago.
SYS-CON Media named Andi Mann editor of DevOps Journal. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Andi Mann, Vice President, Strategic Solutions, at CA Technologies, is an accomplished digital business executive with extensive global expertise as a strategist, technologist, innovator, marketer, communicator, and thought lea...
Even though it’s now Microservices Journal, long-time fans of SOA World Magazine can take comfort in the fact that the URL – soa.sys-con.com – remains unchanged. And that’s no mistake, as microservices are really nothing more than a new and improved take on the Service-Oriented Architecture (SOA) best practices we struggled to hammer out over the last decade. Skeptics, however, might say that this change is nothing more than an exercise in buzzword-hopping. SOA is passé, and now that people are ...
Enterprises are fast realizing the importance of integrating SaaS/Cloud applications, API and on-premises data and processes, to unleash hidden value. This webinar explores how managers can use a Microservice-centric approach to aggressively tackle the unexpected new integration challenges posed by proliferation of cloud, mobile, social and big data projects. Industry analyst and SOA expert Jason Bloomberg will strip away the hype from microservices, and clearly identify their advantages and d...
The Domain Name Service (DNS) is one of the most important components in networking infrastructure, enabling users and services to access applications by translating URLs (names) into IP addresses (numbers). Because every icon and URL and all embedded content on a website requires a DNS lookup loading complex sites necessitates hundreds of DNS queries. In addition, as more internet-enabled ‘Things' get connected, people will rely on DNS to name and find their fridges, toasters and toilets. Acco...
You often hear the two titles of "DevOps" and "Immutable Infrastructure" used independently. In his session at DevOps Summit, John Willis, Technical Evangelist for Docker, will cover the union between the two topics and why this is important. He will cover an overview of Immutable Infrastructure then show how an Immutable Continuous Delivery pipeline can be applied as a best practice for "DevOps." He will end the session with some interesting case study examples.
There is little doubt that Big Data solutions will have an increasing role in the Enterprise IT mainstream over time. 8th International Big Data Expo, co-located with 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - has announced its Call for Papers is open. As advanced data storage, access and analytics technologies aimed at handling high-volume and/or fast moving data all move center stage, aided by the cloud computing bo...
The 5th International DevOps Summit, co-located with 17th International Cloud Expo – being held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the...