SYS-CON MEDIA Authors: Sean Houghton, Glenn Rossman, Ignacio M. Llorente, Xenia von Wedel, Peter Silva

News Feed Item

CJC Intersects 3.54 g/t Au Over 12.00 Metres and 3.58 g/t Au Over 8.55 Metres, Including 5.12 g/t Au Over 4.05 Metres at the Sakami Project

MONTREAL, QUEBEC -- (Marketwired) -- 07/23/14 -- Canada Strategic Metals Inc. ("Strategic Metals" or the "Company") (TSX VENTURE:CJC)(FRANKFURT:YXEN)(OTCBB:CJCFF) and Matamec Explorations Inc. ("Matamec") (TSX VENTURE:MAT)(OTCQX:MHREF) are very pleased to report the results from holes PT-14-81 to PT-14-83, drilled in March and April during the latest exploration program on the Sakami gold property. The new results confirm the extension of the Zone 25 gold mineralization envelope to the west, to the northwest and at depth. The recent results also confirm that the contact corridor between the Opinaca-La Grande volcano-sedimentary sub-provinces is fertile for significantly-enriched gold mineralization. This horizon has now been traced over a strike length of more than 200 metres and to a depth of more than 425 metres along its plunge. The latest drilling program on the Sakami property consisted of a total of 2,913 metres in 11 holes; results for the last three holes, drilled along strike and plunge from Hole PT-14-79, are describe below. The last two drilling programs by Strategic Metals have confirmed and enhanced the potential of the northeast and depth extensions of Zone 25, which remains open in all directions.

The program was aimed at increasing the size of the main gold zone (Zone 25) to the west-northwest, as well as its extension at depth. Zone 25 is in the La Pointe sector of the Sakami property. The program completed the testing of Zone 25 over a strike length of more than 200 metres and to a depth of over 425 metres along its plunge. The holes were spaced at 50 metres. A map showing the hole locations can be found on the Company's website at: www.csmetals.ca.

The Company has received the assay results for three additional holes, PT-14-81 to PT-14-83, drilled in March and April as part of the program. These holes were planned to test the extension of the mineralized zone to the west and northwest, as well as down dip. They all returned gold-bearing intersections with significant gold grades with 2.58 g/t Au over 4.60 metres for hole PT-14-81, 1.43 g/t over 40.25 metres, including 3.58 g/t Au over 8.55 metres and 5.12 g/t Au over 4.05 metres for Hole PT-14-82 and 1.06 g/t Au over 55.50 metres, including 3.54 g/t Au over 12.00 metres for Hole PT-14-83. All the mineralized intersections and assay results are shown below.

"The Company is very pleased to have confirmed the high-grade gold potential of Zone 25 (the main zone) at the Sakami project, as well as its extensions along strike and at depth, and to note that Zone 25 remains open in all directions," said Jean-Sebastien Lavallee, President and Chief Executive Officer of Canada Strategic Metals. "It is also encouraging to see the presence of multiple parallel, highly-anomalous gold zones confirmed. The positive drill results from the last exploration program have once again confirmed the Sakami project's gold potential. We are now in the process of reviewing all the results so that we can plan the next drilling program and increase the size of Zone 25."

Table of mineralized intersections from the recent drilling program


---------------------------------------------------------------------------
---------------------------------------------------------------------------
Hole #                From (m)         To (m)  Length(i) (m)       Au (g/t)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-81                228.00         232.60           4.60           2.58
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-82                231.45         271.70          40.25           1.43
Including               231.45         235.50           4.05           5.12
Including               231.45         240.00           8.55           3.58
Including               256.85         259.00           2.15           3.83
Including               267.50         271.70           4.20           2.38
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-83                240.00         295.50          55.50           1.06
Including               240.00         252.00          12.00           3.54
---------------------------------------------------------------------------
---------------------------------------------------------------------------

(i) Core length: the Company estimates the true width of the mineralized zone at 80 to 95% of the core length.

Table of mineralized intersections from holes drilled on the Sakami project since December 2013


---------------------------------------------------------------------------
---------------------------------------------------------------------------
Hole #                From (m)         To (m)  Length(i) (m)       Au (g/t)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-64                 68.85          69.90           1.05           1.27
                        171.00         171.50           0.50           3.62
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-65                112.50         138.00          25.50           3.03
Including               126.00         138.00          12.00           4.00
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-66                109.95         125.40          15.45           1.18
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-67                126.90         154.85          27.95           3.78
Including               132.25         154.85          22.60           4.01
Including               138.00         145.00           7.00           7.21
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-68                200.50         221.00          20.50           2.77
Including               201.65         215.00          13.35           3.23
Including               201.65         205.00           3.35           4.71
                        278.25         281.10           2.85           2.82
                        294.00         297.00           3.00           1.70
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-69                213.05         226.50          13.45           1.32
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-70                 78.75          99.00          20.25           1.27
Including                78.75          86.00           7.25           2.22
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-71                 49.10          51.65           2.55           2.06
                        102.00         121.50          19.50           2.97
Including               107.40         121.50          14.10           3.78
Including               112.00         121.50           9.50           3.95
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-13-72                112.50         130.40          17.90           2.24
Including               112.50         119.00           6.50           3.65
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-73                150.65         172.50          21.85           1.46
Including               160.50         172.50          12.00           2.16
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-74                237.65         264.00          26.35           2.30
Including               243.70         252.50           8.80           3.80
Including               247.70         252.50           4.80           5.18
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-75                274.05         281.20           7.15           2.40
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-76                180.00         183.00           3.00           1.57
                        198.00         199.50           1.50           1.36
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Pt-14-77                103.50         104.70           1.20           1.33
                        129.00         130.50           1.50           1.98
                        153.00         154.50           1.50           1.00
                        165.00         168.00           3.00           1.65
                        174.00         176.00           2.00           1.46
                        180.00         182.25           2.25           2.02
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-78                193.50         195.00           1.50           1.37
                        208.50         213.00           4.50           2.15
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-79                188.00         236.20          48.20           2.51
Including               188.00         200.00          12.00           6.93
Including               190.00         196.00           6.00          11.35
Including               202.50         207.00           4.50           1.33
Including               226.50         234.00           7.50           3.06
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-80                157.50         163.50           6.00           1.03
                        179.00         181.75           2.75           2.08
                        187.50         190.50           3.00           2.32
                        201.00         202.00           1.00           1.28
                        203.00         204.00           1.00           3.11
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-81                228.00         232.60           4.60           2.58
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-82                231.45         271.70          40.25           1.43
Including               231.45         235.50           4.05           5.12
Including               231.45         240.00           8.55           3.58
Including               256.85         259.00           2.15           3.83
Including               267.50         271.70           4.20           2.38
---------------------------------------------------------------------------
---------------------------------------------------------------------------
PT-14-83                240.00         295.50          55.50           1.06
Including               240.00         252.00          12.00           3.54
---------------------------------------------------------------------------
---------------------------------------------------------------------------

(i) Core length; the Company estimates the true width of the mineralized zone at 80 to 95% of the core length.

The 2014 drilling program was managed by Consul-Teck Exploration of Val-d'Or, Quebec, which designed the drilling campaign, supervised the program and logged and sampled the core.

Consul-Teck Exploration implemented QA/QC procedures to ensure best practices in core sampling and analysis. The drill core was logged and then split, with one-half sent for assay and the other retained in the core box as a witness sample. Duplicates, standards and blanks were inserted regularly into the sample stream.

The samples in secure tagged bags were delivered directly to the analytical facility for analysis. In this case, the analytical facility was the Bourlamaque Ltee laboratory in Val-d'Or, Quebec. The samples are weighed and identified prior to sample preparation. All samples are analyzed by fire assay with AA finish on a 30g sample (0.01-10 ppm Au), with a gravimetric finish for assays over 10 ppm Au.

Jean-Sebastien Lavallee (OGQ #773), geologist, shareholder and President and Chief Executive Officer of the Company and a Qualified Person under NI 43-101, has reviewed and approved the technical content of this release.

About Matamec Explorations

Matamec Explorations Inc. is a mining exploration company whose focus is developing the Kipawa HREE deposit with TRECan, with the goal of supplying Toyota with HREEs for the production of hybrid and electric cars. The company is exploring 35 km of strike length in the Kipawa Alkalic complex for rare earths-yttrium-zirconium-niobium-tantalum mineralization on its Zeus property. Matamec is also exploring for gold at its Matheson joint-venture property, which is located along strike and in close proximity to the Hoyle Pond mine in Timmins, Ontario. In Quebec, the company is exploring for lithium and tantalum on its Tansim property and for precious and base metals on its Sakami, Valmont and Vulcain properties.

For more information, please visit www.matamec.com.

About Canada Strategic Metals

Canada Strategic Metals is an emerging company focused on the exploration and development of a number of projects covering over 20,000 hectares in Quebec. With broad management experience in green technology and junior resource exploration and development, Canada Strategic Metals is well positioned to aggressively advance this promising property portfolio for its shareholders.

For more information on the Company, please visit www.csmetals.ca.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Jean-Sebastien Lavallee, P. Geo
President & Chief Executive Officer
819-354-5146

Paradox Public Relations
514-341-0408

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Leysin American School is an exclusive, private boarding school located in Leysin, Switzerland. Leysin selected an OpenStack-powered, private cloud as a service to manage multiple applications and provide development environments for students across the institution. Seeking to meet rigid data sovereignty and data integrity requirements while offering flexible, on-demand cloud resources to users, Leysin identified OpenStack as the clear choice to round out the school's cloud strategy. Additional...
The cloud is becoming the de-facto way for enterprises to leverage common infrastructure while innovating and one of the biggest obstacles facing public cloud computing is security. In his session at 15th Cloud Expo, Jeff Aliber, a global marketing executive at Verizon, discussed how the best place for web security is in the cloud. Benefits include: Functions as the first layer of defense Easy operation –CNAME change Implement an integrated solution Best architecture for addressing network-l...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
“DevOps is really about the business. The business is under pressure today, competitively in the marketplace to respond to the expectations of the customer. The business is driving IT and the problem is that IT isn't responding fast enough," explained Mark Levy, Senior Product Marketing Manager at Serena Software, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
“We help people build clusters, in the classical sense of the cluster. We help people put a full stack on top of every single one of those machines. We do the full bare metal install," explained Greg Bruno, Vice President of Engineering and co-founder of StackIQ, in this SYS-CON.tv interview at 15th Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
Mobile commerce traffic is surpassing desktop, yet less than 20% of sales in the U.S. are mobile commerce sales. In his session at 15th Cloud Expo, Dan Franklin, Segment Manager, Commerce, at Verizon Digital Media Services, defined mobile devices and discussed how next generation means simplification. It means taking your digital content and turning it into instantly gratifying experiences.
“In the past year we've seen a lot of stabilization of WebRTC. You can now use it in production with a far greater degree of certainty. A lot of the real developments in the past year have been in things like the data channel, which will enable a whole new type of application," explained Peter Dunkley, Technical Director at Acision, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that Windstream, a leading provider of advanced network and cloud communications, has been named “Silver Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9–11, 2015, at the Javits Center in New York, NY. Windstream (Nasdaq: WIN), a FORTUNE 500 and S&P 500 company, is a leading provider of advanced network communications, including cloud computing and managed services, to businesses nationwide. The company also offers broadband, p...
The major cloud platforms defy a simple, side-by-side analysis. Each of the major IaaS public-cloud platforms offers their own unique strengths and functionality. Options for on-site private cloud are diverse as well, and must be designed and deployed while taking existing legacy architecture and infrastructure into account. Then the reality is that most enterprises are embarking on a hybrid cloud strategy and programs. In this Power Panel at 15th Cloud Expo (http://www.CloudComputingExpo.com...
Verizon Enterprise Solutions is simplifying the cloud-purchasing experience for its clients, with the launch of Verizon Cloud Marketplace, a key foundational component of the company's robust ecosystem of enterprise-class technologies. The online storefront will initially feature pre-built cloud-based services from AppDynamics, Hitachi Data Systems, Juniper Networks, PfSense and Tervela. Available globally to enterprises using Verizon Cloud, Verizon Cloud Marketplace provides a one-stop shop fo...
The Internet of Things is not new. Historically, smart businesses have used its basic concept of leveraging data to drive better decision making and have capitalized on those insights to realize additional revenue opportunities. So, what has changed to make the Internet of Things one of the hottest topics in tech? In his session at @ThingsExpo, Chris Gray, Director, Embedded and Internet of Things, discussed the underlying factors that are driving the economics of intelligent systems. Discover ...
The move in recent years to cloud computing services and architectures has added significant pace to the application development and deployment environment. When enterprise IT can spin up large computing instances in just minutes, developers can also design and deploy in small time frames that were unimaginable a few years ago. The consequent move toward lean, agile, and fast development leads to the need for the development and operations sides to work very closely together. Thus, DevOps become...

ARMONK, N.Y., Nov. 20, 2014 /PRNewswire/ --  IBM (NYSE: IBM) today announced that it is bringing a greater level of control, security and flexibility to cloud-based application development and delivery with a single-tenant version of Bluemix, IBM's

SYS-CON Media announced today that Aruna Ravichandran, VP of Marketing, Application Performance Management and DevOps at CA Technologies, has joined DevOps Journal’s authors. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. DevOps Journal brings valuable information to DevOps professionals who are transforming the way enterprise IT is done. Aruna's inaugural article "Four Essential Cultural Hacks for DevOps Newbies" discusses how to demonstrate the...
"Our premise is Docker is not enough. That's not a bad thing - we actually love Docker. At ActiveState all our products are based on open source technology and Docker is an up-and-coming piece of open source technology," explained Bart Copeland, President & CEO of ActiveState Software, in this SYS-CON.tv interview at DevOps Summit at Cloud Expo®, held Nov 4-6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.