Click here to close now.

SYS-CON MEDIA Authors: Ian Goldsmith, Ed Featherston, Elizabeth White, Pat Romanski, Liz McMillan

News Feed Item

Platinum Group Metals Files Report on Revised and Updated Mineral Resource Estimate for the Waterberg Joint Venture and Waterberg Extension Projects

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 07/25/14 -- Platinum Group Metals Ltd. (TSX: PTM)(NYSE MKT: PLG) ("Platinum Group" or the "Company") announces that further to its news release dated June 12, 2014 (the "Release") announcing an increase in the estimated Inferred Mineral Resource at the Waterberg Joint Venture and adjacent Waterberg Extension in South Africa, it has today filed the associated National Instrument 43-101 technical report. The report, entitled "Revised and Updated Mineral Resource Estimate for the Waterberg Joint Venture and Waterberg Extension Projects, South Africa (Latitude 23 degrees 22' 01"S, Longitude 28 degrees 49' 42"E)" is dated effective June 12, 2014 and was prepared by Kenneth Lomberg, B.Sc. (Hons) Geology, B. Com., M. Eng. Pr.Sci.Nat. and Alan Goldschmidt, Pr.Sci.Nat., of Coffey Mining (SA) Pty Ltd. supporting the disclosure of the updated inferred mineral resource estimate. The technical report is consistent in all material respects with the inferred mineral resource estimates announced in the Release. A copy of the report can be found at www.sedar.com and on the Company's website.

The previously announced total Inferred resource on the Waterberg Joint Venture and the Waterberg Extension in the "T" and "F" layers are estimated at 29 million ounces 4E, 287 million tonnes grading 3.15 g/t 4E (0.94 g/t Pt, 1.92 g/t Pd, 0.04 g/t Rh, 0.25 g/t Au, 30%, 61%, 1%, 8% respectively).

Exploration at the Waterberg Joint Venture and the Waterberg Extension continues with 24 drill rigs, focused on in-fill drilling with the objective of converting the majority of Waterberg Platinum deposit on the Waterberg Joint Venture to Indicated as well as expanding the open deposit.

Qualified Person, Quality Control and Assurance

The non-independent qualified person for this Press Release is R. Michael Jones P.Eng. He has relevant experience in precious metals and PGM evaluations and has verified the data by reviewing the detailed assay and geological information on the Waterberg deposit and visiting the site and core yard many times since 2011 including in June 2014.

Ken Lomberg of Coffey Mining South Africa Pty Ltd is the independent qualified person for the Mineral Resources on the Waterberg Deposit and he has reviewed the references to resources and ongoing work in this press release. It is planned that Coffey will prepare an update on the Mineral Resource for the prefeasibility study based on the current in-fill drilling.

About the Waterberg Joint Venture and Waterberg Extension

The Japan Oil, Gas and Metals National Corporation ("JOGMEC"), a state owned mining company from Japan, is an active participant in the Waterberg Joint Venture along with Platinum Group Metals Ltd. and South African empowerment partner Mnombo Wethu Consultants (Pty) Ltd. The Waterberg deposit was discovered in late 2011 by the joint venture partners and has grown dramatically over the past few years to be a globally significant deposit. The deposit is near surface and in an independently engineered PEA, a mine design for the Waterberg Joint Venture project area estimates 655,000 ounces of 3E production at steady state to be accessed by ramp declines, utilizing fully mechanized mining methods. See National Instrument 43-101 technical report at www.sedar.com entitled "Waterberg Mineral Project Preliminary Economic Assessment" filed March 13, 2014. (The economic analysis is based on Inferred Resources and is preliminary in nature. Inferred Resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the PEA will be realized).

The Waterberg Extension is owned 87% by Platinum Group Metals directly and indirectly and is located adjacent to the north of the Waterberg Joint Venture within a regional scale set of Prospecting Rights granted to the Company.

About Platinum Group Metals Ltd.

Platinum Group is based in Johannesburg, South Africa and Vancouver, Canada. The Company's business is currently focused on the construction of the WBJV Project 1 (Maseve) platinum mine and the exploration and initial engineering on the newly discovered Waterberg platinum deposit. The Waterberg discovery was made by the Company stemming from a successful scientific exploration focus in the Company's founding origins.

On behalf of the Board of Platinum Group Metals Ltd.

R. Michael Jones, President and CEO

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

This press release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws ("forward-looking statements"). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this press release include, without limitation, statements regarding the completion of the WBJV Project 1 mine (Maseve), the Company's ability to secure further financing, the Company's plans with respect to future exploration at Waterberg, development and production on the Company's projects including mine construction at WBJV Project 1 mine (Maseve), and all technical details of the Waterberg PEA. Although the Company believes the forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in market conditions; the nature, quality and quantity of any mineral deposits that may be located; metal prices; other prices and costs; currency exchange rates; the Company's ability to obtain any necessary permits, consents or authorizations required for its activities; the Company's ability to access further funding and produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies and other risk factors described in the Company's Form 40-F annual report, annual information form and other filings with the SEC and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.

Cautionary Note to U.S. Investors Regarding Estimates of Inferred Mineral Resources

The disclosure in this press release regarding mineral properties was prepared in accordance with Canadian National Instrument 43-101 ("NI 43-101"), which differ significantly from the mineral reserve disclosure requirements of the U.S. Securities and Exchange Commission ("SEC") set out in Industry Guide 7. Under NI 43-101, companies are permitted and required to disclose "mineral resources", which are not "reserves". U.S. companies subject to the disclosure requirements of the SEC are not normally permitted to disclose mineralization unless they constitute "reserves" by U.S. standards in documents filed with the SEC. Investors are specifically cautioned not to assume that any part or all of "measured mineral resources", "indicated mineral resources" or "inferred mineral resources" will ever be converted into SEC defined mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" exist or will ever be upgraded to a higher category. Under Canadian rules, estimates of "inferred mineral resources" may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. In addition, the definitions of "reserves" and related terms under NI 43-101 and the SEC's Industry Guide 7 differ significantly. Accordingly, any "reserves" disclosed in this press release may not constitute "reserves" under SEC standards. Under SEC standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Further, while NI 43-101 permits companies to disclose the economic projections contained in preliminary economic analyses and pre-feasibility studies, which are not based on "reserves", U.S. companies are not normally permitted to include such economic projections in their SEC filings prior to the establishment of reserves under SEC standards. For the above reasons, statements contained in this press release that describes mineral reserve and resource estimates or that describes the results of preliminary economic analyses or pre-feasibility studies are not comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

Contacts:
Platinum Group Metals Ltd.
R. Michael Jones
President
(604) 899-5450 / Toll Free: (866) 899-5450

Platinum Group Metals Ltd.
Kris Begic
VP, Corporate Development
(604) 899-5450 / Toll Free: (866) 899-5450

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Cloud Expo, Inc. has announced today that Andi Mann returns to DevOps Summit 2015 as Conference Chair. The 4th International DevOps Summit will take place on June 9-11, 2015, at the Javits Center in New York City. "DevOps is set to be one of the most profound disruptions to hit IT in decades," said Andi Mann. "It is a natural extension of cloud computing, and I have seen both firsthand and in independent research the fantastic results DevOps delivers. So I am excited to help the great team at ...
How does one bridge the gap between traditional enterprise storage infrastructures and the private, hybrid, and public cloud? In his session at 15th Cloud Expo, Dan Pollack, Chief Architect of Storage Operations at AOL Inc., examed the workload differences and required changes to reuse existing knowledge and components when building and using a cloud infrastructure. He also looked into the operational considerations, tool requirements, and behavioral changes required for private cloud storage s...
Software is eating the world. Companies that were not previously in the technology space now find themselves competing with Google and Amazon on speed of innovation. As the innovation cycle accelerates, companies must embrace rapid and constant change to both applications and their infrastructure, and find a way to deliver speed and agility of development without sacrificing reliability or efficiency of operations. In her Day 2 Keynote DevOps Summit, Victoria Livschitz, CEO of Qubell, discussed...
The time is ripe for high speed resilient software defined storage solutions with unlimited scalability. ISS has been working with the leading open source projects and developed a commercial high performance solution that is able to grow forever without performance limitations. In his session at DevOps Summit, Alex Gorbachev, President of Intelligent Systems Services Inc., will share foundation principles of Ceph architecture, as well as the design to deliver this storage to traditional SAN st...
Working with Big Data is challenging, especially when decision makers depend on market insights and intelligence from your data but don't have quick access to it or find it unusable. In their session at 6th Big Data Expo, Ian Khan, Global Strategic Positioning & Brand Manager at Solgenia; Zel Bianco, President, CEO and Co-Founder of Interactive Edge of Solgenia; and Ermanno Bonifazi, CEO & Founder at Solgenia, discussed how a revolutionary cloud-based BI along with mobile analytics is already c...
Gartner predicts that the bulk of new IT spending by 2016 will be for cloud platforms and applications and that nearly half of large enterprises will have cloud deployments by the end of 2017. The benefits of the cloud may be clear for applications that can tolerate brief periods of downtime, but for critical applications like SQL Server, Oracle and SAP, companies need a strategy for HA and DR protection. While traditional SAN-based clusters are not possible in these environments, SANless cluste...
Hardware will never be more valuable than on the day it hits your loading dock. Each day new servers are not deployed to production the business is losing money. While Moore's Law is typically cited to explain the exponential density growth of chips, a critical consequence of this is rapid depreciation of servers. The hardware for clustered systems (e.g., Hadoop, OpenStack) tends to be significant capital expenses. In his session at Big Data Expo, Mason Katz, CTO and co-founder of StackIQ, disc...
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
In their general session at 16th Cloud Expo, Michael Piccininni, Global Account Manager – Cloud SP at EMC Corporation, and Mike Dietze, Regional Director at Windstream Hosted Solutions, will review next generation cloud services, including the Windstream-EMC Tier Storage solutions, and discuss how to increase efficiencies, improve service delivery and enhance corporate cloud solution development. Speaker Bios Michael Piccininni is Global Account Manager – Cloud SP at EMC Corporation. He has b...
All major researchers estimate there will be tens of billions devices - computers, smartphones, tablets, and sensors - connected to the Internet by 2020. This number will continue to grow at a rapid pace for the next several decades. With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo, June 9-11, 2015, at the Javits Center in New York City. Learn what is going on, contribute to the discussions, and ensure that your enter...
With worldwide spending on cloud services and infrastructure growing by 23% in 2015 to $118B, it is clear that cloud services are here to stay. Yet, the rate of cloud adoption varies by companies and markets around the world. With thousands of outages and hijacks across the Internet every day, one reason for hesitation is the faith in quality Internet performance. In his session at 16th Cloud Expo, Michael Kane, Senior Manager at Dyn, will explore how Internet performance affects your end-user...
Container frameworks, such as Docker, provide a variety of benefits, including density of deployment across infrastructure, convenience for application developers to push updates with low operational hand-holding, and a fairly well-defined deployment workflow that can be orchestrated. Container frameworks also enable a DevOps approach to application development by cleanly separating concerns between operations and development teams. But running multi-container, multi-server apps with containers ...
SYS-CON Events announced today that DragonGlass, an enterprise search platform, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. After eleven years of designing and building custom applications, OpenCrowd has launched DragonGlass, a cloud-based platform that enables the development of search-based applications. These are a new breed of applications that utilize a search index as their backbone for data...
As the Internet of Things unfolds, mobile and wearable devices are blurring the line between physical and digital, integrating ever more closely with our interests, our routines, our daily lives. Contextual computing and smart, sensor-equipped spaces bring the potential to walk through a world that recognizes us and responds accordingly. We become continuous transmitters and receivers of data. In his session at @ThingsExpo, Andrew Bolwell, Director of Innovation for HP's Printing and Personal S...
There is no doubt that Big Data is here and getting bigger every day. Building a Big Data infrastructure today is no easy task. There are an enormous number of choices for database engines and technologies. To make things even more challenging, requirements are getting more sophisticated, and the standard paradigm of supporting historical analytics queries is often just one facet of what is needed. As Big Data growth continues, organizations are demanding real-time access to data, allowing immed...