SYS-CON MEDIA Authors: Pat Romanski, Carmen Gonzalez, Liz McMillan, Elizabeth White, Ed Featherston

News Feed Item

Aben Resources Begins 2014 Exploration Program at Justin Gold-Silver-Tungsten Project, Southeast Yukon

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 07/28/14 -- Aben Resources Ltd. (TSX VENTURE:ABN) (PINKSHEETS:ABNAF) (FRANKFURT:E2L) is pleased to announce that its 2014 exploration program at its 100% owned 18,314 acre Justin gold-silver-tungsten project has commenced. The project area is located in southeast Yukon within the Tintina Gold Belt approximately 35 kilometers southwest of the Cantung Mine and is accessed by an all-season road.

Justin gold-silver-tungsten project location map:

http://www.abenresources.com/i/maps/ABN-Justin.jpg

Aben's Justin property is host to numerous styles of intrusion-related mineralization (IRGS), most notably the newly-discovered auriferous gold-silver-tungsten skarn and sheeted vein system which comprise the POW zone. The Justin property area includes the POW, Confluence, Main and Kangas zones which form part of a 12 kilometer-long mineralized corridor. The property area is 35 kilometers from North American Tungsten Corp.'s Cantung tungsten-copper-gold mine, with other significant projects in the area including Golden Predator's Sprogge and 3-Aces properties. With excellent infrastructure and an active mine with similar geology nearby, Aben's Justin project boasts highly-prospective near-surface exploration targets for both gold and tungsten.

Justin project geophysics and areas of interest for drilling:

http://www.abenresources.com/i/maps/ABN-Justin-Merged-Mag-Survey.jpg

In 2011, a 2,020 metre ten-hole drill program targeted four separate mineralized zones on the Justin property. During this program a significant new greenfield gold discovery was made at the POW zone, with drill highlights including 60.0 metres of 1.19 g/t gold including 21.0 metres of 2.47 g/t gold in hole JN11009. A total of 1,994 metres were drilled in nine holes during the 2012 field season at the Justin property with highlights including 46.4 metres of 1.49 g/t gold in hole JN12011. All holes completed to target depths at the POW zone have intersected gold mineralization, with the zone open in all directions.

The 2014 Justin property work program will consist of geological mapping and prospecting, trenching, 9.0 kilometers of b-horizon soil geochemical sampling and collection of petrophysical data from existing drill core samples. This work will assist with defining and expanding the known extent of gold and tungsten mineralization on the property and to define targets for future drilling. The Yukon government has approved the project for partial funding through the 2014 YMEP program, which will result in a portion of exploration expenditures being reimbursed to Aben Resources.

The 2014 Justin exploration program will focus on two main areas of interest:


1.  Delineating the extent of hard rock mineralization found at surface at
    the POW zone and surrounding area. Prospecting and trenching will focus
    on evaluating sheeted vein and skarn systems for both gold and tungsten
    potential. Specific target areas have been selected based upon favorable
    geochemical results returned from the 2012 exploration program.

2.  Focus on the southeastern portion of the Justin property where initial
    prospecting and geochemical sampling in 2012 identified a new hard rock
    massive sulphide showing which has been named the Big Swifty.
    Geochemical surveys, prospecting and channel sampling will provide a
    detailed evaluation of the Big Swifty target area and give context to
    it's relationship with the IRGS mineralization recognized in the central
    and northern portions of the Justin property.

The 2014 Justin exploration program is expected to begin by the end of July.

Qualified Person

Tim J. Termuende, P.Geo., a Director of Aben Resources and Qualified Person as defined by National Instrument 43-101, has reviewed and approved the technical information in this release.

In other news, Aben Resources announced (see news release July 8th) that it will be carrying out a Phase 1 Field Program consisting of a ground-based electromagnetic (EM) survey this summer on its 40% owned Mann Lake Uranium Project. The property is strategically located on the east side of the Athabasca Basin, Saskatchewan 25 kilometers southwest of Cameco's McArthur River Mine and 15 kilometers northeast and along strike of Cameco's Millennium uranium deposit.

Aben's Mann Lake property is adjacent to the Mann Lake Joint Venture operated by Cameco (52.5%) with partners Denison Mines (30%) and AREVA (17.5%).

Mann Lake Uranium Project map:

http://www.abenresources.com/i/maps/ABN_Athabasca_Map_11X17.jpg

About Aben Resources:

Aben Resources Ltd. is a Canadian gold-silver-tungsten and uranium exploration company with projects in the Yukon, NWT and Saskatchewan's Athabasca Basin.

For further information on Aben Resources Ltd. (TSX VENTURE:ABN), visit our Company's web site at www.abenresources.com.

ON BEHALF OF THE BOARD OF DIRECTORS

JAMES G. PETTIT, President

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
What’s inside the cloud? Hard work. Cloud operators know the world inside the datacenter is gritty. Vendor marketing speak and cloudwashing quickly melt in the heat of SLAs, uptime guarantees, and users who want it now. In his session at DevOps Summit, Hernan Alvarez, Chief Product Officer at Blue Box Group, will deliver an unvarnished look inside the world of cloud operators, from the perspective of someone who lives it. Attendees get a front-row look into the toolkits and processes that enabl...
Enthusiasm for the Internet of Things has reached an all-time high. In 2013 alone, venture capitalists spent more than $1 billion dollars investing in the IoT space. With "smart" appliances and devices, IoT covers wearable smart devices, cloud services to hardware companies. Nest, a Google company, detects temperatures inside homes and automatically adjusts it by tracking its user's habit. These technologies are quickly developing and with it come challenges such as bridging infrastructure gaps,...
Application metrics, logs, and business KPIs are a goldmine. It’s easy to get started with the ELK stack (Elasticsearch, Logstash and Kibana) – you can see lots of people coming up with impressive dashboards, in less than a day, with no previous experience. Going from proof-of-concept to production tends to be a bit more difficult, unfortunately, and it tends to gobble up our attention, time, and money. In his session at DevOps Summit, Otis Gospodnetić, co-author of Lucene in Action and founder...
We are all here because we are sold on the transformative promise of The Cloud. But what good is all of this ephemeral, on-demand infrastructure if your usage doesn't actually improve the agility and speed of your business? How must Operations adapt in order to avoid stifling your Cloud initiative? In his session at DevOps Summit, Damon Edwards, co-founder and managing partner of the DTO Solutions, will highlight the successful organizational, process, and tooling patterns of high-performing c...
The move in recent years to cloud computing services and architectures has added significant pace to the application development and deployment environment. When enterprise IT can spin up large computing instances in just minutes, developers can also design and deploy in small time frames that were unimaginable a few years ago. The consequent move toward lean, agile, and fast development leads to the need for the development and operations sides to work very closely together. Thus, DevOps become...
SYS-CON Events announced today that AIC, a leading provider of OEM/ODM server and storage solutions, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. AIC is a leading provider of both standard OTS, off-the-shelf, and OEM/ODM server and storage solutions. With expert in-house design capabilities, validation, manufacturing and production, AIC's broad selection of products are highly flexible and are conf...
NuoDB just introduced the Swifts 2.1 Release. In this demo at 15th Cloud Expo, Seth Proctor, CTO of NuoDB, Inc., discussed why scaling databases in the cloud is challenging, why building your application on top of the infrastructure that is designed with this in mind makes a difference, and what you can do with NuoDB that simplifies your programming model, your operations model.
Physical, virtual, containers. Private cloud, public cloud, hybrid cloud. IaaS, PaaS, SaaS. Windows, Linux, Mac. These are just some of the choices faced when architecting a datacenter of today. And the choice is not one or the other; instead, it is often a combination of many of these. HashiCorp builds software to ease these decisions by presenting solutions that bridge the gaps. HashiCorp's tools manage both physical machines and virtual machines, Windows, and Linux, SaaS and IaaS, etc. The co...
CloudBees, Inc., has announced a $23.5 million financing round, led by longtime CloudBees investor Lightspeed Venture Partners. Existing investors Matrix Partners, Verizon Ventures and Blue Cloud Ventures also participated in the round. The latest funding announcement follows earlier rounds of $4 million, $10.5 million and $10.8 million, bringing the total investment in CloudBees to just under $50 million since the company’s inception in 2010. Previous venture investment rounds were led by Ma...
Hovhannes Avoyan, CEO of Monitis, Inc., a provider of on-demand systems management and monitoring software to 50,000 users spanning small businesses and Fortune 500 companies, has surpassed 1.5 million page views on the SYS-CON family of online magazines, which includes Cloud Computing Journal, DevOps Journal, Internet of Things Journal, and Big Data Journal. His home page at SYS-CON can be found at Montis.SYS-CON.com
Leysin American School is an exclusive, private boarding school located in Leysin, Switzerland. Leysin selected an OpenStack-powered, private cloud as a service to manage multiple applications and provide development environments for students across the institution. Seeking to meet rigid data sovereignty and data integrity requirements while offering flexible, on-demand cloud resources to users, Leysin identified OpenStack as the clear choice to round out the school's cloud strategy. Additional...
DevOps Summit 2015 New York, co-located with the 16th International Cloud Expo - to be held June 9-11, 2015, at the Javits Center in New York City, NY - announces that it is now accepting Keynote Proposals. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development cycles that produce software that is obsolete...
Want to enable self-service provisioning of application environments in minutes that mirror production? Can you automatically provide rich data with code-level detail back to the developers when issues occur in production? In his session at DevOps Summit, David Tesar, Microsoft Technical Evangelist on Microsoft Azure and DevOps, will discuss how to accomplish this and more utilizing technologies such as Microsoft Azure, Visual Studio online, and Application Insights in this demo-heavy session.
SYS-CON Events announced today that Liaison Technologies, a leading provider of data management and integration cloud services and solutions, has been named "Silver Sponsor" of SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York, NY. Liaison Technologies is a recognized market leader in providing cloud-enabled data integration and data management solutions to break down complex information barriers, enabling enterprises to make sm...
“The year of the cloud – we have no idea when it's really happening but we think it's happening now. For those technology providers like Zentera that are helping enterprises move to the cloud - it's been fun to watch," noted Mike Loftus, VP Product Management and Marketing at Zentera Systems, in this SYS-CON.tv interview at Cloud Expo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.