Focus Graphite Files Lac Knife Graphite Project Feasibility Study Technical Report

Weighs lower-cost options for tandem financing of mine/plant and purification facilities for high value "battery grade" graphite production

OTTAWA, ONTARIO -- (Marketwired) -- 08/08/14 -- Focus Graphite Inc. ("Focus" or the "Company") (TSX VENTURE: FMS)(OTCQX: FCSMF)(FRANKFURT: FKC) sole owner of the Lac Knife, Quebec high purity graphite deposit announced today that the Feasibility Report prepared in accordance with National Instrument 43-101and with form 43-101F1 will be filed under the Company's SEDAR profile on Friday August 8th, 2014 at www.sedar.com and on Focus' website (www.focusgraphite.com).

The Feasibility Study was prepared by Met-Chem Canada Inc. with contributions from AGP Mining Consultants, Journeaux Associates and Golder Associates.

Don Baxter, Focus' President and Chief Operating Officer said: "With the Feasibility Study now completed, we continue to de-risk the project by focusing on key, near to mid-term milestones, including: detailed engineering, project financing, and the permitting process.

"In particular," he added, "the Feasibility Study opens the door to another level of available financing.

"We are evaluating options to secure project financing that will enable us to advance the Lac Knife mine and plant construction."

Mr. Baxter said discussions with potential offtake partners are ongoing and will complement the existing 10-year offtake signed in December, 2013.

The highlights of the Feasibility Study, as reported June 25, 2014:


---------------------------------------------------------------------------
Table 1
---------------------------------------------------------------------------
Lac Knife Feasibility Results
 (Pre-Tax)                           Base Case    2016 Forecast   Units
---------------------------------------------------------------------------
Average Price / Tonne of             $1,713       $2,256          US$
 Concentrate:
---------------------------------------------------------------------------
Internal Rate of Return (IRR)        30.1         41.8            %
---------------------------------------------------------------------------
Net Present Value @ 6% Discounted    510          809             $ million
 Cash Flow
---------------------------------------------------------------------------
Net Present Value @ 8% Discounted    383          624             $ million
 Cash Flow
---------------------------------------------------------------------------
Net Present Value @ 10% Discounted   291          488             $ million
 Cash Flow
---------------------------------------------------------------------------
Payback Period                       3.0          2.1             Years
---------------------------------------------------------------------------
Lac Knife Feasibility Results        Base Case    2016 Forecast   Units
 (After-Tax)
---------------------------------------------------------------------------
Internal Rate of Return (IRR)        24.1         32.8            %
---------------------------------------------------------------------------
Net Present Value @ 6% Discounted    304          476             $ million
 Cash Flow
---------------------------------------------------------------------------
Net Present Value @ 8% Discounted    224          364             $ million
 Cash Flow
---------------------------------------------------------------------------
Net Present Value @ 10% Discounted   165          280             $ million
 Cash Flow
---------------------------------------------------------------------------
Payback Period                       3.2          2.4             Years
---------------------------------------------------------------------------
All monetary values are in Canadian Dollars ("CDN") except where specified
 otherwise
---------------------------------------------------------------------------

Of note is that average prices used in the financial model do not include value added products produced using the typically lower valued finer natural flake graphite.

Background:

The Feasibility Study was conducted with engineering and estimation methods appropriate to target an accuracy of 15% that is standard and realistic for capital and operating cost estimates for this level of study, that is required prior to detailed engineering, and well beyond the +/- 30% accuracy of a Preliminary Economic Assessment (PEA). Based on an extensive risk review exercise the contingency is 11.5%. Capital Expenditures in Table 2 itemize cost requirements for mine construction, processing plant, power line and all associated infrastructure estimated at $165.55 million.


---------------------------------------------------------------------
Table 2
---------------------------------------------------------------------
Lac Knife Capital Expenditure - Cost Centers            CDN$ millions
---------------------------------------------------------------------
Mine equipment, infrastructure, and pre-stripping       4.21
---------------------------------------------------------------------
Infrastructure                                          11.62
---------------------------------------------------------------------
Primary Crushing                                        7.02
---------------------------------------------------------------------
Concentrator                                            62.24
---------------------------------------------------------------------
Environmental and Tailings Management                   8.22
---------------------------------------------------------------------
Additional Infrastructure                               15.4
---------------------------------------------------------------------
Indirect Costs                                          39.77
---------------------------------------------------------------------
Contingency (11.5%)                                     17.07
---------------------------------------------------------------------
Sub Total                                               165.55
---------------------------------------------------------------------

The company is continuing discussions with vendors to define financing packages for equipment. The company's aim is to reduce up front capital and add to the basket of financing options currently being investigated. Discussions and due diligence continue regarding Supply Chain Financing ("SCF") based on the offtake agreement signed in December, 2013 for a minimum of 50% of Lac Knife's production over the life of a 10-year agreement. SCF is a non-dilutive alternative to equity financing and is less encumbering than traditional debt, or royalty financing.

Future off-take agreements will contain a financial component. This project-financing alternative could include equity and low interest debt as well as a signing bonus to execute an offtake agreement. The various options discussed above have the potential to enhance future project economic evaluation metrics, and the company continues these discussions with several interested parties.

Qualified Persons

The technical information within this news release was approved by Project Leader Mary-Jean Buchanan Eng., and Jeffrey Cassoff Eng., Lead Mining Engineer, and Ewald Pengel P. Eng., Senior Metallurgist, who was responsible for concentrator design, of Met-Chem Canada Inc. all Qualified Persons under NI 43-101 guidelines and independent of the issuer. Pierre Desautels, P.Geo., of AGP Inc. completed the NI- 43-101 Mineral Resource Estimate and is independent of the issuer.

The technical information in this news release was prepared by Mr. Don Baxter, P. Eng., Focus President & Chief Operating Officer, a Qualified Person as defined by NI 43-101 guidelines, who has reviewed and approved the technical content of this news release.

About Focus Graphite

Focus Graphite Inc. is an emerging mining development company with an objective to produce value added products initially for the lithium ion battery market from the Lac Knife graphite deposit located south west of Fermont, Quebec. The Lac Knife project hosts a NI 43-101 compliant Measured and Indicated Mineral Resource Estimate(i) of 9.6 million tonnes grading 14.77% graphitic carbon (Cg) as natural flake graphite with an additional Inferred Mineral Resource Estimate(i) of 3.1 million tonnes grading 13.25% Cg. Focus' goal is to assume an industry leadership position by becoming a low-cost producer of technology-grade graphite. The Feasibility Study filed with SEDAR on August 8, 2014 for the Lac Knife Project indicates the project is economically viable and has the potential to become a low cost graphite producer based on 7.86 million tonnes (429,000 tonnes Proven and 7,428,000 tonnes Probable) of Proven and Probable Reserves grading 15.13 Cg. On May 27, 2014 the Company announced the Potential for High Value Added Sales in the Li-Ion Battery Sector following battery coin cell tests performed on Lac Knife Spherical Graphite ("SPG"). Testing measured the performance metrics and confirmed Focus' capability to tailor lithium ion battery anode grade graphite and value added products to meet the most stringent customer specifications. Focus Graphite is a technology-oriented enterprise with a vision for building long-term, sustainable shareholder value. Focus also holds a significant equity position in graphene applications developer Grafoid Inc.

(i) Mineral resources are not mineral reserves and do not have demonstrated economic viability

Forward Looking Statement

This news release contains "forward-looking information" within the meaning of Canadian securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: (i) volatile stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and operation of mineral deposits; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in commodity prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; (x) access to adequate infrastructure to support mining, processing, development and exploration activities;

(xi) the risks associated with changes in the mining regulatory regime governing the resulting issuer; (xii) the risks associated with the various environmental regulations the resulting issuer is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) risks related to potential conflicts of interest; (xv) the reliance on key personnel; (xvi) liquidity risks; (xvii) the risk of potential dilution through the issue of common shares; (xviii) the Company does not anticipate declaring dividends in the near term; (xix) the risk of litigation; and (xx) risk management. Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in metal prices, exploration and development plans proceeding in accordance with plans and such plans achieving their stated expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the date of this news release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Secure Infrastructure & Services will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY, and the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Secure Infrastructure & Services (SIAS) is a managed services provider of cloud computing solutions for the IBM Power Systems market. The company...
Enterprise IoT is an exciting and chaotic space with a lot of potential to transform how the enterprise resources are managed. In his session at @ThingsExpo, Hari Srinivasan, Sr Product Manager at Cisco, will describe the challenges in enabling mass adoption of IoT, and share perspectives and insights on architectures/standards/protocols that are necessary to build a healthy ecosystem and lay the foundation to for a wide variety of exciting IoT use cases in the years to come.
SYS-CON Events announced today that CenturyLink, Inc., a leader in the network services market, has been named “Platinum Sponsor” of SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. CenturyLink is the third largest telecommunications company in the United States and is recognized as a leader in the network services market by technology industry analyst firms. The company is a global leader in cloud infrastructure and ...
Docker is becoming very popular--we are seeing every major private and public cloud vendor racing to adopt it. It promises portability and interoperability, and is quickly becoming the currency of the Cloud. In his session at DevOps Summit, Bart Copeland, CEO of ActiveState, discussed why Docker is so important to the future of the cloud, but will also take a step back and show that Docker is actually only one piece of the puzzle. Copeland will outline the bigger picture of where Docker fits a...
SYS-CON Events announced today the DevOps Foundation Certification Course, being held June ?, 2015, in conjunction with DevOps Summit and 16th Cloud Expo at the Javits Center in New York City, NY. This sixteen (16) hour course provides an introduction to DevOps – the cultural and professional movement that stresses communication, collaboration, integration and automation in order to improve the flow of work between software developers and IT operations professionals. Improved workflows will res...
As cloud gives an opportunity to businesses to buy services externally – how is cloud impacting your customers? In his General Session at 15th Cloud Expo, Fabio Gori, Director of Worldwide Cloud Marketing at Cisco, provided answers to big questions: Do you see hybrid cloud as where the world is going? What benefits does it bring? And how does Cisco connect all of these clouds? He also discussed Intercloud and Cisco’s investment on it.
SYS-CON Events announced today that B2Cloud, a provider of enterprise resource planning software, will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY. B2cloud develops the software you need. They have the ideal tools to help you work with your clients. B2Cloud’s main solutions include AGIS – ERP, CLOHC, AGIS – Invoice, and IZUM
Containers and microservices have become topics of intense interest throughout the cloud developer and enterprise IT communities. Accordingly, attendees at the upcoming 16th Cloud Expo at the Javits Center in New York June 9-11 will find fresh new content in a new track called PaaS | Containers & Microservices Containers are not being considered for the first time by the cloud community, but a current era of re-consideration has pushed them to the top of the cloud agenda. With the launch ...
A new definition of Big Data & the practical applications of the defined components & associated technical architecture models This presentation introduces a new definition of Big Data, along with the practical applications of the defined components and associated technical architecture models. In his session at Big Data Expo, Tony Shan will start with looking into the concept of Big Data and tracing back the first definition by Doug Laney, and then he will dive deep into the description of 3V...
SYS-CON Events announced today that MangoApps will exhibit at SYS-CON's 16th International Cloud Expo®, which will take place on June 9-11, 2015, at the Javits Center in New York City, NY., and the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MangoApps provides private all-in-one social intranets allowing workers to securely collaborate from anywhere in the world and from any device. Social, mobile, and eas...
There is no doubt that Big Data is here and getting bigger every day. Building a Big Data infrastructure today is no easy task. There are an enormous number of choices for database engines and technologies. To make things even more challenging, requirements are getting more sophisticated, and the standard paradigm of supporting historical analytics queries is often just one facet of what is needed. As Big Data growth continues, organizations are demanding real-time access to data, allowing immed...
The world's leading Cloud event, Cloud Expo has launched Microservices Journal on the SYS-CON.com portal, featuring over 19,000 original articles, news stories, features, and blog entries. DevOps Journal is focused on this critical enterprise IT topic in the world of cloud computing. Microservices Journal offers top articles, news stories, and blog posts from the world's well-known experts and guarantees better exposure for its authors than any other publication. Follow new article posts on T...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
The security devil is always in the details of the attack: the ones you've endured, the ones you prepare yourself to fend off, and the ones that, you fear, will catch you completely unaware and defenseless. The Internet of Things (IoT) is nothing if not an endless proliferation of details. It's the vision of a world in which continuous Internet connectivity and addressability is embedded into a growing range of human artifacts, into the natural world, and even into our smartphones, appliances, a...
There are 182 billion emails sent every day, generating a lot of data about how recipients and ISPs respond. Many marketers take a more-is-better approach to stats, preferring to have the ability to slice and dice their email lists based numerous arbitrary stats. However, fundamentally what really matters is whether or not sending an email to a particular recipient will generate value. Data Scientists can design high-level insights such as engagement prediction models and content clusters that a...