paul.nowak wrote: Matt, thanks for the comments. I made an error on the version of Plone. It's 2.5 Plone running on Zope 2.9x.
In regards to the additional products, we have a skin installed and we have a product that we had custom developed for us that connects to a PostgreSQL database. We've looked at slow PostgreSQL queries causing problems and have not been able to find an issue. We've also tested for the case where the PostgreSQL server is down and have not been able to create an issue. We therefor...
VANCOUVER, BC -- (MARKET WIRE) -- 01/26/07 -- First Narrows Resources Corp. (TSX-V: UNO)
(PINKSHEETS: FNRWF) ("First Narrows" or "the Company") is pleased to
announce that it has resumed drilling on the Chester Copper-Polymetallic
Feeder Deposit for the purpose of completing a NI 43-101 qualifying mineral
resource estimate.
The focus of this phase of the program is to continue the delineation of
the higher grade copper-polymetallic mineralization of the feeder deposit
by extending the drilling to the north, as well as up dip to the east, and
down dip to the west. A further +100 diamond drill holes will be required
to develop the initial NI 43-101 Inferred and Indicated mineral resource
estimation of the eastern, near surface, portion of the deposit.
The Company would like to acknowledge that the 2006 phase of the NI 43-101
qualifying mineral resource estimate drilling program was funded in part by
MineralFields Group through a private placement. Highlights from the
analytical results previously released from the 2006 drilling include:
-***-
HOLE C-06-022 UTM Collar Coordinates - 5219925N, 710168.75E; dip vertical
From To Length Length Cu
m m m ft (%)
-------------------------------------------------------------
19.83 44.86 25.03 82.1 3.43
HOLE C-06-020 Collar Coordinates - 5219912.5N, 710175E; UTM Grid, NAD83,
dip vertical
From To Length Length Cu
m m m ft (%)
-------------------------------------------------------------
6.00 39.00 33.00 108.3 2.91
Includes: 16.00 36.30 20.30 66.6 4.37
HOLE C-06-025 Collar Coordinates - 5219925N, 710162.5E; UTM Grid, NAD83,
dip vertical
From To Length Length Cu
m m m ft (%)
-------------------------------------------------------------
22.70 47.30 24.60 80.7 3.96
HOLE C-06-027 Collar Coordinates - 5219950N, 710162.5E; UTM Grid, NAD83,
dip vertical
From To Length Length Cu Pb Zn Ag
m m m ft (%) (%) (%) (g/t)
---------------------------------------------------------------------------
22.25 27.27 5.02 16.5 0.19 1.75 4.96 14.27
-****-
The drilling, analytical and surveying programs are being monitored by
consultant Robert Sim, P.Geo. and Bruce Davies. Mr. Earnest Brooks,
P.Geo., is the Company's Qualified Person on the Chester Project. Mr.
Brooks was formerly a Mine Geologist at the Patino Mines Copper Rand Mines
Div. in Chibougamau, P.Q, and a mining operations geologist and exploration
geologist at the BMS mines, Bathurst, from 1975 to 1990.
Chester Copper-Polymetallic Feeder Deposit
The copper-polymetallic feeder deposit is an east-west trending gently west
plunging cigar shaped deposit within an alteration zone approximately 75
meters (246 ft.) or more in thickness and greater than 200 meters (656 ft.)
in width. It extends west of the current planned drilling area for more
than 1 kilometer ( > 3,280 ft.). At the east end it lies close to surface
and at the western extent of the company's drilling it is more than 400
meters (1,320 ft.) below surface. The copper-polymetallic mineralization
within the feeder deposit varies from low to high grade.
About First Narrows Resources Corp.:
First Narrows Resources Corp. (TSX-V: UNO) is a Canadian-based mineral
exploration company whose corporate strategy is to develop overlooked and
undervalued mineral properties that offer near term production potential.
The Company is rapidly moving its 100%-owned Chester Project in the
Bathurst Mining Camp forward to NI 43-101 mineral resource estimate and
conceptual mine design status. For more information visit: www.uno.ca
ON BEHALF OF THE BOARD OF DIRECTORS
"Peter K. Gummer"
Peter K. Gummer, President
The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of the contents herein. This
news release may contain certain forward-looking statements that involve a
number of known and unknown risks, uncertainties and other factors that may
cause actual results or events to differ materially from those anticipated
in our forward-looking statements. Further, a forward-looking statement
speaks only as of the date on which such statement is made. We seek safe
harbor.
Distributed by Filing Services Canada and retransmitted by Market Wire
For Corporate, Media, or Investor Communications contact:
Greg Lytle
Communications Manager
First Narrows Resources Corp.
Toll-free: (866) 285-5817
Vancouver: (604) 839-6946
Email: Email Contact
First Narrows Resources Corp.
Suite 402 - 1228 Hamilton Street,
Vancouver, BC Canada V6B 6L2
Toll free: 866.285.5817
Tel.: 604.677.5143
Fax: 604.677.4702
Website: http://www.uno.ca